메뉴 건너뛰기




Volumn 34, Issue 10, 2010, Pages 38-42

A minimum power deficiency model for optimization of unit maintenance scheduling

Author keywords

Minimum power deficiency; Optimization; Successive approximation; Unit maintenance scheduling

Indexed keywords

EQUIVALENT LOAD; FEASIBLE SOLUTION; HEURISTIC SEARCH METHODS; INSTALLED CAPACITY; MAINTENANCE SCHEDULES; MINIMUM POWER DEFICIENCY; OPTIMAL SOLUTIONS; POWER GRIDS; POWER SHORTAGE; RESERVE CAPACITY; STEP-BY-STEP; SUCCESSIVE APPROXIMATIONS; UNIT MAINTENANCE SCHEDULING; YUNNAN POWER GRID;

EID: 78651542455     PISSN: 10003673     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (10)

References (16)
  • 1
    • 78651585102 scopus 로고
    • Chinese source
    • 1986:183-190.
    • (1986) , pp. 183-190
  • 2
    • 78651545726 scopus 로고
    • Chinese source
    • 1990: 1-5.
    • (1990) , pp. 1-5
  • 3
    • 0142261075 scopus 로고    scopus 로고
    • Research on the optimized planned-maintence period of turbo-generator
    • (in Chinese)
    • Peng Hui, Zhang Yan, Zhang Yankui, et al. Research on the optimized planned-maintence period of turbo-generator[J]. Proceedings of the CSEE, 2003, 23(7):41-45(in Chinese).
    • (2003) Proceedings of the CSEE , vol.23 , Issue.7 , pp. 41-45
    • Peng, H.1    Zhang, Y.2    Zhang, Y.3
  • 4
    • 0010569189 scopus 로고    scopus 로고
    • Research of a new optimization module and algorithm for maintenance scheduling problem
    • (in Chinese)
    • Chen Jingcheng, Yu Erkeng, Liu Guangyi, et al. Research of a new optimization module and algorithm for maintenance scheduling problem[J]. Power System Technology, 1997, 21(11):66-69(in Chinese).
    • (1997) Power System Technology , vol.21 , Issue.11 , pp. 66-69
    • Chen, J.1    Yu, E.2    Liu, G.3
  • 5
    • 3142716232 scopus 로고    scopus 로고
    • A preliminary investigation on optimal strategies of maintenance scheduling for generation companies in electricity market
    • (in Chinese)
    • Wang Jian, Wen Fushuan, Yang Rengang, et al. A preliminary investigation on optimal strategies of maintenance scheduling for generation companies in electricity market[J]. Power System Technology, 2004, 28(10):22-27(in Chinese).
    • (2004) Power System Technology , vol.28 , Issue.10 , pp. 22-27
    • Wang, J.1    Wen, F.2    Yang, R.3
  • 6
    • 0035387284 scopus 로고    scopus 로고
    • Review of reliability and economy problems in generator maintenance scheduling
    • (in Chinese)
    • Ding Ming, Feng Yongqing. Review of reliability and economy problems in generator maintenance scheduling[J]. Electric Power, 2001, 34(7):22-25(in Chinese).
    • (2001) Electric Power , vol.34 , Issue.7 , pp. 22-25
    • Ding, M.1    Feng, Y.2
  • 7
    • 78651545339 scopus 로고    scopus 로고
    • Optimization algorithm of power supply equipment maintenance scheduling and its application in regional power network
    • (in Chinese)
    • Xu Xufeng, Huang Minxiang, Wang Tingting, et al. Optimization algorithm of power supply equipment maintenance scheduling and its application in regional power network[J]. Power System Technology, 2009, 33(14):31-35(in Chinese).
    • (2009) Power System Technology , vol.33 , Issue.14 , pp. 31-35
    • Xu, X.1    Huang, M.2    Wang, T.3
  • 8
    • 78651525905 scopus 로고    scopus 로고
    • Solving unit maintenance scheduling problem by use of improved ant colony algorithm
    • (in Chinese)
    • Yuan Xiaotao, Yao Jiangang, Chen Liang. Solving unit maintenance scheduling problem by use of improved ant colony algorithm[J]. Power System Technology, 2008, 32(21):42-46(in Chinese).
    • (2008) Power System Technology , vol.32 , Issue.21 , pp. 42-46
    • Yuan, X.1    Yao, J.2    Chen, L.3
  • 9
    • 54549100737 scopus 로고    scopus 로고
    • Review of generator maintenance scheduling in power market
    • (in Chinese)
    • Feng Changyou, Wang Xifan. Review of generator maintenance scheduling in power market[J]. Automation of Electric Power Systems, 2007, 31(5):97-104(in Chinese).
    • (2007) Automation of Electric Power Systems , vol.31 , Issue.5 , pp. 97-104
    • Feng, C.1    Wang, X.2
  • 10
    • 0020166323 scopus 로고
    • Maintenance scheduling:description, literature survey, and interface with overall operations scheduling
    • Yamayee Z A. Maintenance scheduling:description, literature survey, and interface with overall operations scheduling[J]. IEEE Transactions on Power Apparatus and Systems, 1982, 101(8):2770-2779.
    • (1982) IEEE Transactions on Power Apparatus and Systems , vol.101 , Issue.8 , pp. 2770-2779
    • Yamayee, Z.A.1
  • 11
    • 0035505636 scopus 로고    scopus 로고
    • The present status of maintenance strategies and the impact of maintenance on reliability
    • Endrenyi J, Aboresheid S, Allan R N, et al. The present status of maintenance strategies and the impact of maintenance on reliability [J]. IEEE Transactions on Power Systems, 2001, 16(4):638-646.
    • (2001) IEEE Transactions on Power Systems , vol.16 , Issue.4 , pp. 638-646
    • Endrenyi, J.1    Aboresheid, S.2    Allan, R.N.3
  • 12
    • 0016474937 scopus 로고
    • Generator maintenance scheduling via successive approximations dynamic programming
    • Zurn H H, Quintana V H. Generator maintenance scheduling via successive approximations dynamic programming[J]. IEEE Transactions on Power Apparatus and Systems, 1975, 94(2):665-671.
    • (1975) IEEE Transactions on Power Apparatus and Systems , vol.94 , Issue.2 , pp. 665-671
    • Zurn, H.H.1    Quintana, V.H.2
  • 14
    • 6344227287 scopus 로고    scopus 로고
    • Research on overhaul strategy of generating equipments and its reliability management
    • (in Chinese)
    • Ding Jianyong, Deng Ruipeng, Li Jiang, et al. Research on overhaul strategy of generating equipments and its reliability management [J]. Power System Technology, 2002, 26(3):72-75(in Chinese).
    • (2002) Power System Technology , vol.26 , Issue.3 , pp. 72-75
    • Ding, J.1    Deng, R.2    Li, J.3
  • 15
    • 0029276590 scopus 로고
    • A globally convergent successive approximation method for severely nonsmooth equations
    • Qi L Q, Xiao J. A globally convergent successive approximation method for severely nonsmooth equations[J]. SIAM Journal on Control and Optimization, 1995, 33(2):402-418.
    • (1995) SIAM Journal on Control and Optimization , vol.33 , Issue.2 , pp. 402-418
    • Qi, L.Q.1    Xiao, J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.