메뉴 건너뛰기




Volumn 27, Issue 6, 2007, Pages 47-50

Determination of pumped-storage plant capacity with peak-regulation proportion

Author keywords

Installed capacity; Peak regulation proportion; Power source planning; Pumped storage unit

Indexed keywords

POWER PLANTS;

EID: 34347235458     PISSN: 10066047     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (18)

References (15)
  • 2
    • 34347225259 scopus 로고    scopus 로고
    • Discussion on optimal mode for peaking units expansion planning and its application
    • YU Xin-mei. XIONG Xin-gen, WU Yao-wu, et al. Discussion on optimal mode for peaking units expansion planning and its application[J]. Electric Power, 2003, 36(1): 48-51.
    • (2003) Electric Power , vol.36 , Issue.1 , pp. 48-51
    • Yu, X.-M.1    Xiong, X.-G.2    Wu, Y.-W.3
  • 3
    • 25144438532 scopus 로고    scopus 로고
    • An options model for evaluating the dynamic benefit of PS stations
    • FANG Jun, NIU Dong-xiao, HUANG Yuan-sheng. An options model for evaluating the dynamic benefit of PS stations[J]. Power System Technology, 2005, 29(8): 38-41.
    • (2005) Power System Technology , vol.29 , Issue.8 , pp. 38-41
    • Fang, J.1    Niu, D.-X.2    Huang, Y.-S.3
  • 4
    • 34347217659 scopus 로고    scopus 로고
    • Reflections on the issues of pumped storage power station in deregulated power market
    • REN Zhen. PAN Xi-mang, HUANG Wen-ying, et al. Reflections on the issues of pumped storage power station in deregulated power market[J]. Hydropower Automation and Dam Monitoring, 2003, 27(1): 6-10.
    • (2003) Hydropower Automation and Dam Monitoring , vol.27 , Issue.1 , pp. 6-10
    • Ren, Z.1    Pan, X.-M.2    Huang, W.-Y.3
  • 5
    • 34347240539 scopus 로고    scopus 로고
    • Reasonable proportion of the capacity of pumping storage station in the power system
    • BAI Hong-kun, LI Gan-sheng. Reasonable proportion of the capacity of pumping storage station in the power system[J]. Electric Power Construction, 2001, 22(6): 54-56.
    • (2001) Electric Power Construction , vol.22 , Issue.6 , pp. 54-56
    • Bai, H.-K.1    Li, G.-S.2
  • 6
    • 34347213870 scopus 로고    scopus 로고
    • Reasonable developmental scale of pumped-storage power station in East China power network in 2010
    • SHU Jing, ZHANG Jian, ZHENG Yuan. Reasonable developmental scale of pumped-storage power station in East China power network in 2010[J]. Water Resource and Power, 2005, 23(5): 54-58.
    • (2005) Water Resource and Power , vol.23 , Issue.5 , pp. 54-58
    • Shu, J.1    Zhang, J.2    Zheng, Y.3
  • 7
    • 34347248190 scopus 로고    scopus 로고
    • The probe into several question on design of kinetic energy of pumped-storage station
    • ZHAO Shi-he. The probe into several question on design of kinetic energy of pumped-storage station[J]. Water Power, 1999(4): 29-32.
    • (1999) Water Power , Issue.4 , pp. 29-32
    • Zhao, S.-H.1
  • 8
    • 34347264268 scopus 로고    scopus 로고
    • Development prospects and management modes of construction for pumped-storage power stations in East China power grid
    • CHEN Zhi-ping, WAN Bing-cai. Development prospects and management modes of construction for pumped-storage power stations in East China power grid[J]. East China Electric Power, 2006, 34(2): 18-20.
    • (2006) East China Electric Power , vol.34 , Issue.2 , pp. 18-20
    • Chen, Z.-P.1    Wan, B.-C.2
  • 9
    • 28544433193 scopus 로고    scopus 로고
    • Short term scheduling of pumped-storage plant using multi-objective fuzzy dynamic programming
    • XIAO Ying, YIN Yong-hua, GUO Jian-bo. Short term scheduling of pumped-storage plant using multi-objective fuzzy dynamic programming[J]. Power System Technology, 1997, 21(10): 15-19.
    • (1997) Power System Technology , vol.21 , Issue.10 , pp. 15-19
    • Xiao, Y.1    Yin, Y.-H.2    Guo, J.-B.3
  • 10
    • 34347234914 scopus 로고    scopus 로고
    • The influence of load adjusting on power source planning in power system
    • YANG Peng, CHEN Shao-hua. The influence of load adjusting on power source planning in power system[J]. Guangdong Electric Power, 1997(3): 48-51.
    • (1997) Guangdong Electric Power , Issue.3 , pp. 48-51
    • Yang, P.1    Chen, S.-H.2
  • 11
    • 33644949011 scopus 로고    scopus 로고
    • Study on ancillary service trade model with grid operation constrained
    • ZENG Ming, LIU Wan-fu, ZHANG Yi. et al. Study on ancillary service trade model with grid operation constrained[J], Proceedings of the CSEE, 2005, 25(12): 82-87.
    • (2005) Proceedings of the CSEE , vol.25 , Issue.12 , pp. 82-87
    • Zeng, M.1    Liu, W.-F.2    Zhang, Y.3
  • 12
    • 33644942465 scopus 로고    scopus 로고
    • Improved algorithm of adjusting discharge peak by thermal power plants
    • LIAO Sheng-li, CHENG Chun-tian, CAI Hua-xiang. et al. Improved algorithm of adjusting discharge peak by thermal power plants[J]. Automation of Electric Power Systems, 2006, 30(1): 89-93.
    • (2006) Automation of Electric Power Systems , vol.30 , Issue.1 , pp. 89-93
    • Liao, S.-L.1    Cheng, C.-T.2    Cai, H.-X.3
  • 13
    • 26844548350 scopus 로고    scopus 로고
    • Generation/transmission expansion planning model and operation model in power market
    • ZENG Qing-yu. Generation/transmission expansion planning model and operation model in power market[J]. Automation of Electric Power Systems, 2004, 28(5): 1-5.
    • (2004) Automation of Electric Power Systems , vol.28 , Issue.5 , pp. 1-5
    • Zeng, Q.-Y.1
  • 14
    • 34347251004 scopus 로고    scopus 로고
    • Principle of dispatching and operation for Tianhuangping pumped storage power station
    • ZENG Zhao-qi. Principle of dispatching and operation for Tianhuangping pumped storage power station[J]. East China Electric Power, 2001, 23(3): 1-4, 62.
    • (2001) East China Electric Power , vol.23 , Issue.3
    • Zeng, Z.-Q.1
  • 15
    • 33750201234 scopus 로고    scopus 로고
    • Dynamic programming models for operation optimization of pumped storage power stations
    • QIU Wen-qian. Dynamic programming models for operation optimization of pumped storage power stations[J]. Hydropower Automation and Dam Monitoring, 2005, 29(5): 6-10.
    • (2005) Hydropower Automation and Dam Monitoring , vol.29 , Issue.5 , pp. 6-10
    • Qiu, W.-Q.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.