-
2
-
-
0025701919
-
Some efficient multi-heuristic procedures for resource-constrained project scheduling
-
Fayer F. Boctor Some efficient multi-heuristic procedures for resource-constrained project scheduling Eur. J. Oper. Res. 49 1 1990 3 13
-
(1990)
Eur. J. Oper. Res.
, vol.49
, Issue.1
, pp. 3-13
-
-
Boctor, F.F.1
-
3
-
-
13944250291
-
Where do we stand with fuzzy project scheduling?
-
Pierre Bonnal, Didier Gourc, and Germain Lacoste Where do we stand with fuzzy project scheduling? J. Constr. Eng. Manage. 130 1 2004 114 123
-
(2004)
J. Constr. Eng. Manage.
, vol.130
, Issue.1
, pp. 114-123
-
-
Bonnal, P.1
Gourc, D.2
Lacoste, G.3
-
4
-
-
77953684240
-
Resource-constrained multi-project scheduling: Priority rule performance revisited
-
Tyson R. Browning, and Ali A. Yassine Resource-constrained multi-project scheduling: priority rule performance revisited Int. J. Prod. Econ. 126 2 2010 212 228
-
(2010)
Int. J. Prod. Econ.
, vol.126
, Issue.2
, pp. 212-228
-
-
Browning, T.R.1
Yassine, A.A.2
-
5
-
-
0036683729
-
On the sure criticality of tasks in activity networks with imprecise durations
-
Stefan Chanas, Didier Dubois, and Pawel Zielinski On the sure criticality of tasks in activity networks with imprecise durations IEEE Trans. Syst. Man Cybern. 32 4 2002 393 407
-
(2002)
IEEE Trans. Syst. Man Cybern.
, vol.32
, Issue.4
, pp. 393-407
-
-
Chanas, S.1
Dubois, D.2
Zielinski, P.3
-
6
-
-
80655137098
-
Fuzzy Multiple Attribute Decision Making: Methods and Applications
-
Chen, Shu-Jen, Hwang, Ching-Lai, 1992. Fuzzy Multiple Attribute Decision Making: Methods and Applications. Fuzzy Sets.
-
(1992)
Fuzzy Sets
-
-
Chen, S.-J.1
Hwang, C.-L.2
-
7
-
-
62749175148
-
Project scheduling for maximum npv with variable activity durations and uncertain activity outcomes
-
Creemers, Stefan, Leus, Roel, De Reyck, Bert, Lambrecht, Marc, 2008. Project scheduling for maximum npv with variable activity durations and uncertain activity outcomes. In: IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2008, pp. 183-187.
-
(2008)
IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2008
, pp. 183-187
-
-
Creemers, S.1
Leus, R.2
De Reyck, B.3
Lambrecht, M.4
-
10
-
-
0023548442
-
The mean value of a fuzzy number
-
Didier Dubois, and Henri Prade The mean value of a fuzzy number Fuzzy Sets Syst. 24 3 1987 279 300
-
(1987)
Fuzzy Sets Syst.
, vol.24
, Issue.3
, pp. 279-300
-
-
Dubois, D.1
Prade, H.2
-
12
-
-
0037410243
-
On latest starting times and floats in activity networks with ill-known durations
-
Didier Dubois, Héléne Fargier, and Vincent Galvagnon On latest starting times and floats in activity networks with ill-known durations Eur. J. Oper. Res. 147 2 2003 266 280
-
(2003)
Eur. J. Oper. Res.
, vol.147
, Issue.2
, pp. 266-280
-
-
Dubois, D.1
Fargier, H.2
Galvagnon, V.3
-
13
-
-
0001195356
-
Resource leveling in construction by optimization
-
S.M. Easa Resource leveling in construction by optimization J. Constr. Eng. Manage. ASCE 115 2 1989 302 316
-
(1989)
J. Constr. Eng. Manage. ASCE
, vol.115
, Issue.2
, pp. 302-316
-
-
Easa, S.M.1
-
15
-
-
0031268178
-
Jobshop scheduling with imprecise durations: A fuzzy approach
-
Philippe Fortemps Jobshop scheduling with imprecise durations: a fuzzy approach IEEE Trans. Fuzzy Syst. 5 4 1997 557 569
-
(1997)
IEEE Trans. Fuzzy Syst.
, vol.5
, Issue.4
, pp. 557-569
-
-
Fortemps, P.1
-
16
-
-
33646194407
-
Interval analysis in scheduling
-
P. van Beek, Springer Berlin, Heidelberg
-
Jérôme Fortin, Pawel Zielinski, Didier Dubois, and Hélène Fargier Interval analysis in scheduling P. van Beek, Principles and Practice of Constraint Programming - CP 2005. Lecture Notes in Computer Science vol. 3709 2005 Springer Berlin, Heidelberg 226 240
-
(2005)
Principles and Practice of Constraint Programming - CP 2005. Lecture Notes in Computer Science
, vol.3709
, pp. 226-240
-
-
Fortin, J.1
Zielinski, P.2
Dubois, D.3
Fargier, H.4
-
19
-
-
0031997813
-
Fuzzy set theory applications in production management research: A literature survey
-
Alfred L. Guiffrida, and Rakesh Nagi Fuzzy set theory applications in production management research: a literature survey J. Intelligent Manuf. 9 1 1998 39 56
-
(1998)
J. Intelligent Manuf.
, vol.9
, Issue.1
, pp. 39-56
-
-
Guiffrida, A.L.1
Nagi, R.2
-
20
-
-
35349007942
-
Scheduling united states coast guard helicopter deployment and maintenance at clearwater air station Florida
-
R.A. Hahn, and Alexandra M. Newman Scheduling united states coast guard helicopter deployment and maintenance at clearwater air station Florida Comput. Oper. Res. 35 6 2008 1829 1843
-
(2008)
Comput. Oper. Res.
, vol.35
, Issue.6
, pp. 1829-1843
-
-
Hahn, R.A.1
Newman, A.M.2
-
21
-
-
0030286425
-
Fuzzy priority heuristics for project scheduling
-
Maciej Hapke, and Romain Slowinski Fuzzy priority heuristics for project scheduling Fuzzy Sets Syst. 83 3 1996 291 299
-
(1996)
Fuzzy Sets Syst.
, vol.83
, Issue.3
, pp. 291-299
-
-
Hapke, M.1
Slowinski, R.2
-
22
-
-
84953063276
-
A DSS for resource constrained project scheduling under uncertainty
-
Maciej Hapke, and Roman Slowinski A DSS for resource constrained project scheduling under uncertainty J. Decision Syst. 2 2 1993 111 117
-
(1993)
J. Decision Syst.
, vol.2
, Issue.2
, pp. 111-117
-
-
Hapke, M.1
Slowinski, R.2
-
23
-
-
0028524436
-
Fuzzy project scheduling system for software development
-
Maciej Hapke, Andrzej Jaszkiewicz, and Roman Slowinski Fuzzy project scheduling system for software development Fuzzy Sets Syst. 67 1 1994 101 117
-
(1994)
Fuzzy Sets Syst.
, vol.67
, Issue.1
, pp. 101-117
-
-
Hapke, M.1
Jaszkiewicz, A.2
Slowinski, R.3
-
24
-
-
13444269168
-
Project scheduling under uncertainty survey and research potentials
-
Willy Herroelen, and Roel Leus Project scheduling under uncertainty survey and research potentials Eur. J. Oper. Res. 165 2 2005 289 306
-
(2005)
Eur. J. Oper. Res.
, vol.165
, Issue.2
, pp. 289-306
-
-
Herroelen, W.1
Leus, R.2
-
26
-
-
85011963722
-
Enhanced resource leveling technique for project scheduling
-
Jaejun Kim, Kyunghwan Kim, Namyong Jee, and Yungsang Yoon Enhanced resource leveling technique for project scheduling J. Asian Archit. Build. Eng. 4 2 2005 461 466
-
(2005)
J. Asian Archit. Build. Eng.
, vol.4
, Issue.2
, pp. 461-466
-
-
Kim, J.1
Kim, K.2
Jee, N.3
Yoon, Y.4
-
27
-
-
13444278798
-
Hybrid genetic algorithm with adaptive abilities for resource-constrained multiple project scheduling
-
KwanWoo Kim, YoungSu Yun, JungMo Yoon, Mitsuo Gen, and Genji Yamazaki Hybrid genetic algorithm with adaptive abilities for resource-constrained multiple project scheduling Comput. Ind. 56 2 2005 143 160
-
(2005)
Comput. Ind.
, vol.56
, Issue.2
, pp. 143-160
-
-
Kim, K.1
Yun, Y.2
Yoon, J.3
Gen, M.4
Yamazaki, G.5
-
28
-
-
0002030301
-
Heuristic algorithms for solving the resource-constrained project scheduling problem classification and computational analysis
-
Jan Weglarz, Kluwer Academic Publishers
-
Rainer Kolish, and Sonke Hartmann Heuristic algorithms for solving the resource-constrained project scheduling problem classification and computational analysis Jan Weglarz, Project Scheduling Recent Models Algorithms and Applications 1999 Kluwer Academic Publishers
-
(1999)
Project Scheduling Recent Models Algorithms and Applications
-
-
Kolish, R.1
Hartmann, S.2
-
29
-
-
0033512755
-
A fuzzy optimal model for construction resource leveling scheduling
-
S.-S. Leu, A.-T. Chen, and C.-H. Yang A fuzzy optimal model for construction resource leveling scheduling Can. J. Civil Eng. 26 1999 673 684
-
(1999)
Can. J. Civil Eng.
, vol.26
, pp. 673-684
-
-
Leu, S.-S.1
Chen, A.-T.2
Yang, C.-H.3
-
30
-
-
0034324916
-
Resource leveling in construction by genetic algorithm-based optimization and its decision support system application
-
Sou-Sen Leu, Chung-Huei Yang, and Jiun-Ching Huang Resource leveling in construction by genetic algorithm-based optimization and its decision support system application Autom. Constr. 10 1 2000 27 41
-
(2000)
Autom. Constr.
, vol.10
, Issue.1
, pp. 27-41
-
-
Leu, S.-S.1
Yang, C.-H.2
Huang, J.-C.3
-
31
-
-
80655133027
-
A tactical model under uncertainty for helicopter maintenance planning
-
May
-
Masmoudi, Malek, Haït, Alain, 2010. A tactical model under uncertainty for helicopter maintenance planning. In: The 8th ENIM IFAC International Conference of Modeling and Simulation, MOSIM'10, May, vol. 3, pp. 1837-1845.
-
(2010)
The 8th ENIM IFAC International Conference of Modeling and Simulation, MOSIM'10
, vol.3
, pp. 1837-1845
-
-
Masmoudi, M.1
-
36
-
-
58049213924
-
Genetic learning of fuzzy rules based on low quality data
-
L. Sánchez, I. Couso, and J. Casillas Genetic learning of fuzzy rules based on low quality data Fuzzy Sets Syst. 160 17 2009 2524 2552
-
(2009)
Fuzzy Sets Syst.
, vol.160
, Issue.17
, pp. 2524-2552
-
-
Sánchez, L.1
Couso, I.2
Casillas, J.3
-
40
-
-
78649329380
-
A survey of the application of fuzzy set theory in production and operations management: 1998-2009
-
JANUARY
-
Bo K. Wong, and Vincent S. Lai A survey of the application of fuzzy set theory in production and operations management: 1998-2009 Int. J. Prod. Econ. 129 January (1) 2011 157 168
-
(2011)
Int. J. Prod. Econ.
, vol.129
, Issue.1
, pp. 157-168
-
-
Wong, B.K.1
Lai, V.S.2
-
41
-
-
34248666540
-
Fuzzy sets
-
Lotfi Zadeh Fuzzy sets Inf. Control 8 1965 338 353
-
(1965)
Inf. Control
, vol.8
, pp. 338-353
-
-
Zadeh, L.1
-
42
-
-
49349133217
-
Fuzzy sets as basis for a theory of possibility
-
Lotfi Zadeh Fuzzy sets as basis for a theory of possibility Fuzzy Sets Syst. 1 1978 3 28
-
(1978)
Fuzzy Sets Syst.
, vol.1
, pp. 3-28
-
-
Zadeh, L.1
-
43
-
-
77956620023
-
A new approach for solving fuzzy critical path problem using analysis of events
-
Abalfazl Zareei, Farzad Zaerpour, Morteza Bagherpour, Abbas Ali Noora, and Abdollah Hadi Vencheh A new approach for solving fuzzy critical path problem using analysis of events Expert Syst. Appl. 38 1 2011 87 93
-
(2011)
Expert Syst. Appl.
, vol.38
, Issue.1
, pp. 87-93
-
-
Zareei, A.1
Zaerpour, F.2
Bagherpour, M.3
Ali Noora, A.4
Hadi Vencheh, A.5
-
44
-
-
33947285131
-
GA-based resource leveling optimization for construction project
-
Zhao, S.-L.; Liu, Y.; Zhao, H.-M.; Zhou, R.-L.; 2006. GA-based resource leveling optimization for construction project. In: The 5th International Conference on Machine Learning and Cybernetics, IEEE'2006, pp. 2363-2367.
-
(2006)
The 5th International Conference on Machine Learning and Cybernetics, IEEE'2006
, pp. 2363-2367
-
-
Zhao, S.-L.1
Liu, Y.2
Zhao, H.-M.3
Zhou, R.-L.4
|