-
2
-
-
0025701919
-
Some Efficient Multi-heuristic Procedures for Resource-constrained Project Scheduling
-
Boctor, F. F. (1990) “Some Efficient Multi-heuristic Procedures for Resource-constrained Project Scheduling”, European Journal of Operational Research, 49, pp. 3–13.
-
(1990)
European Journal of Operational Research
, vol.49
, pp. 3-13
-
-
Boctor, F.F.1
-
3
-
-
0016498438
-
A Comparison of Heuristic and Optimum Solutions in Resource-constrained Project Scheduling
-
David, E. W. and Patterson, J. H. (1975) “A Comparison of Heuristic and Optimum Solutions in Resource-constrained Project Scheduling”, Management Science, 21(8), pp. 944–955.
-
(1975)
Management Science
, vol.21
, Issue.8
, pp. 944-955
-
-
David, E.W.1
Patterson, J.H.2
-
5
-
-
0032642926
-
Optimization of Resource Allocation and Leveling Using Genetic Algorithms
-
Hegazy, T. (1999) “Optimization of Resource Allocation and Leveling Using Genetic Algorithms”, Journal of Construction Engineering and Management, ASCE, 125(3), pp. 167–175.
-
(1999)
Journal of Construction Engineering and Management, ASCE
, vol.125
, Issue.3
, pp. 167-175
-
-
Hegazy, T.1
-
6
-
-
0002866635
-
The Critical-Path Method: Resource Planning and Scheduling
-
Prentice Hall, Englewood Cliffs, N. J
-
Kelley, J. E. (1963) “The Critical-Path Method: Resource Planning and Scheduling”, Industrial Scheduling, Prentice Hall, Englewood Cliffs, N. J., pp. 347–365.
-
(1963)
Industrial Scheduling
, pp. 347-365
-
-
Kelley, J.E.1
-
7
-
-
85024747998
-
CPMLEVEL, Dep. of Civil Eng
-
Ann Arbor, MI
-
Martinez, J. and Loannou, P. (1992) CPMLEVEL, Dep. of Civil Eng., The Univ. of Michigan, Ann Arbor, MI.
-
(1992)
The Univ. of Michigan
-
-
Martinez, J.1
Loannou, P.2
-
8
-
-
0003443508
-
The Analytic Hierarchy Process: Planning Setting Priorities
-
McGraw-Hill
-
Satty, T. L. (1980) The Analytic Hierarchy Process: Planning Setting Priorities, Resource Allocation, McGraw-Hill.
-
(1980)
Resource Allocation
-
-
Satty, T.L.1
-
9
-
-
0001694940
-
A Heuristic Model for Scheduling Large Projects with Limited Resource
-
Wiest, J. D. (1967) “A Heuristic Model for Scheduling Large Projects with Limited Resource”, Management Science, 13(6), pp. B359-B377.
-
(1967)
Management Science
, vol.13
, Issue.6
, pp. B359-B377
-
-
Wiest, J.D.1
|