A survey on solution methods for task graph models
-
N. Gotz, U. Herzog, & M. Rettelbach. (Eds.), PommersFelden, 17-19 Mars
-
Bacelli F., Jean-Marie A., Liu Z. A survey on solution methods for task graph models. Gotz N., Herzog U., Rettelbach M. Proceedings of the QMIPS Workshop on Formalisms, Principles and State of Arts, PommersFelden, 17-19 Mars 1993. 1993;163-184.
-
(1993)
Proceedings of the QMIPS Workshop on Formalisms, Principles and State of Arts
, pp. 163-184
-
-
Bacelli, F.1
Jean-Marie, A.2
Liu, Z.3
-
4
-
-
0035885517
-
Critical path analysis in the networks with fuzzy activity times
-
Chanas S., Zielinski P. Critical path analysis in the networks with fuzzy activity times. Fuzzy Sets and Systems. 122(2):2001;195-204.
-
(2001)
Fuzzy Sets and Systems
, vol.122
, Issue.2
, pp. 195-204
-
-
Chanas, S.1
Zielinski, P.2
-
6
-
-
0036466460
-
The computational complexity of the interval critical path method
-
Chanas S., Zielinski P. The computational complexity of the interval critical path method. European Journal of Operational Research. 136:2002;541-550.
-
(2002)
European Journal of Operational Research
, vol.136
, pp. 541-550
-
-
Chanas, S.1
Zielinski, P.2
-
7
-
-
0022099676
-
Bounding the project completion time distribution in PERT networks
-
Dodin B. Bounding the project completion time distribution in PERT networks. Operations Research. 33(4):1985;862-881.
-
(1985)
Operations Research
, vol.33
, Issue.4
, pp. 862-881
-
-
Dodin, B.1
-
10
-
-
0037410423
-
Fuzzy scheduling: Modeling flexible constraints vs. coping with incomplete knowledge
-
this issue
-
Dubois, D., Fargier, H., Fortemps, P., 2003. Fuzzy scheduling: Modeling flexible constraints vs. coping with incomplete knowledge. European Journal of Operational Research 147 (2), this issue.
-
(2003)
European Journal of Operational Research
, vol.147
, Issue.2
-
-
Dubois, D.1
Fargier, H.2
Fortemps, P.3
-
11
-
-
0001287631
-
Expected critical path length in PERT type networks
-
Fulkerson D.R. Expected critical path length in PERT type networks. Operations Research. 10:1962;808-817.
-
(1962)
Operations Research
, vol.10
, pp. 808-817
-
-
Fulkerson, D.R.1
-
13
-
-
0030286425
-
Fuzzy priority heuristics for project scheduling
-
Hapke M., Slowinski R. Fuzzy priority heuristics for project scheduling. Fuzzy Sets and Systems. 83:1996;291-299.
-
(1996)
Fuzzy Sets and Systems
, vol.83
, pp. 291-299
-
-
Hapke, M.1
Slowinski, R.2
-
15
-
-
0001501655
-
Application of a technique for research and development program evaluation
-
Malcolm D.G., Roseboom J.H., Clark C.E., Fazar W. Application of a technique for research and development program evaluation. Operations Research. 7:1959;646-669.
-
(1959)
Operations Research
, vol.7
, pp. 646-669
-
-
Malcolm, D.G.1
Roseboom, J.H.2
Clark, C.E.3
Fazar, W.4
-
17
-
-
0001497209
-
Using fuzzy set theory in a scheduling problem: A case study
-
Prade H. Using fuzzy set theory in a scheduling problem: A case study. Fuzzy Sets and Systems. 2:1979;152-165.
-
(1979)
Fuzzy Sets and Systems
, vol.2
, pp. 152-165
-
-
Prade, H.1
-
18
-
-
0028528165
-
Network analysis and information flow in fuzzy environment
-
Rommelfanger H.J. Network analysis and information flow in fuzzy environment. Fuzzy Sets and Systems. 67:1994;119-128.
-
(1994)
Fuzzy Sets and Systems
, vol.67
, pp. 119-128
-
-
Rommelfanger, H.J.1
-
20
-
-
49349133217
-
Fuzzy sets as a basis for a theory of possibility
-
Zadeh L.A. Fuzzy sets as a basis for a theory of possibility. Fuzzy Sets and Systems. 1:1978;3-28.
-
(1978)
Fuzzy Sets and Systems
, vol.1
, pp. 3-28
-
-
Zadeh, L.A.1
|