메뉴 건너뛰기




Volumn 3709 LNCS, Issue , 2005, Pages 226-240

Interval analysis in scheduling

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; COMPUTATIONAL COMPLEXITY; KNOWLEDGE REPRESENTATION; OPTIMIZATION; POLYNOMIALS; PROBLEM SOLVING;

EID: 33646194407     PISSN: 03029743     EISSN: 16113349     Source Type: Book Series    
DOI: 10.1007/11564751_19     Document Type: Conference Paper
Times cited : (24)

References (15)
  • 2
    • 84880915879 scopus 로고    scopus 로고
    • Dynamic control of plans with temporal uncertainty
    • Morris, P., Muscettola, N., Vidal, T.: Dynamic control of plans with temporal uncertainty. In: IJCAI. (2001) 494-502
    • (2001) IJCAI. , pp. 494-502
    • Morris, P.1    Muscettola, N.2    Vidal, T.3
  • 3
    • 0442314380 scopus 로고    scopus 로고
    • Handling contingency in temporal constraint networks: From consistency to controllabilities
    • Vidal, T., Fargier, H.: Handling contingency in temporal constraint networks: from consistency to controllabilities. JETAI 11 (1999) 23-45
    • (1999) JETAI , vol.11 , pp. 23-45
    • Vidal, T.1    Fargier, H.2
  • 4
    • 33646174868 scopus 로고    scopus 로고
    • Managing temporal uncertainty through waypoint controllability
    • Morris, P.H., Muscettola, N.: Managing temporal uncertainty through waypoint controllability. In: IJCAI. (1999) 1253-1258
    • (1999) IJCAI. , pp. 1253-1258
    • Morris, P.H.1    Muscettola, N.2
  • 5
    • 47249163307 scopus 로고    scopus 로고
    • Temporal constraint reasoning with preferences
    • Khatib, L., Morris, P., Morris, R., Rossi, F.: Temporal constraint reasoning with preferences. In: IJCAI. (2001) 322-327
    • (2001) IJCAI. , pp. 322-327
    • Khatib, L.1    Morris, P.2    Morris, R.3    Rossi, F.4
  • 7
    • 0036466460 scopus 로고    scopus 로고
    • The computational complexity of the criticality problems in a network with interval activity times
    • Chanas, S., Zieliński, P.: The computational complexity of the criticality problems in a network with interval activity times. Eur. J. Oper. Res. 136 (2002) 541-550
    • (2002) Eur. J. Oper. Res. , vol.136 , pp. 541-550
    • Chanas, S.1    Zieliński, P.2
  • 8
    • 23044503441 scopus 로고    scopus 로고
    • Computational methods for determining the latest starting times and floats of tasks in interval-valued activity networks
    • To appear
    • Dubois, D., Fargier, H., Fortin, J.: Computational methods for determining the latest starting times and floats of tasks in interval-valued activity networks. J. Intell. Manuf. (2005) To appear.
    • (2005) J. Intell. Manuf.
    • Dubois, D.1    Fargier, H.2    Fortin, J.3
  • 10
    • 0037410423 scopus 로고    scopus 로고
    • Fuzzy scheduling: Modeling flexible constraints vs. coping with incomplete knowledge
    • Dubois, D., Fargier, H., Fortemps, P.: Fuzzy scheduling: modeling flexible constraints vs. coping with incomplete knowledge. Eur. J. Oper. Res. 147 (2003) 231-252
    • (2003) Eur. J. Oper. Res. , vol.147 , pp. 231-252
    • Dubois, D.1    Fargier, H.2    Fortemps, P.3
  • 11
    • 0037410243 scopus 로고    scopus 로고
    • On latest starting times and floats in activity networks with ill-known durations
    • Dubois, D., Fargier, H., Galvagnon, V.: On latest starting times and floats in activity networks with ill-known durations. Eur. J. Oper. Res. 147 (2003) 266-280
    • (2003) Eur. J. Oper. Res. , vol.147 , pp. 266-280
    • Dubois, D.1    Fargier, H.2    Galvagnon, V.3
  • 12
    • 0002146440 scopus 로고
    • The use of fuzzy variables in pert
    • Chanas, S., Kamburowski, J.: The use of fuzzy variables in pert. Fuzzy Set Syst. 5 (1981) 1-19
    • (1981) Fuzzy Set Syst. , vol.5 , pp. 1-19
    • Chanas, S.1    Kamburowski, J.2
  • 13
    • 0036683729 scopus 로고    scopus 로고
    • On the sure criticality of tasks in activity networks with imprecise durations
    • Chanas, S., Dubois, D., Zieliński, P.: On the sure criticality of tasks in activity networks with imprecise durations. IEEE T. Syst. Man Cy. B 34 (2002) 393-407
    • (2002) IEEE T. Syst. Man Cy. B , vol.34 , pp. 393-407
    • Chanas, S.1    Dubois, D.2    Zieliński, P.3
  • 14
    • 11144288983 scopus 로고    scopus 로고
    • On computing the latest starting times and floats of activities in a network with imprecise durations
    • Zieliński, P.: On computing the latest starting times and floats of activities in a network with imprecise durations. Fuzzy Set Syst. 150 (2005) 53-76
    • (2005) Fuzzy Set Syst. , vol.150 , pp. 53-76
    • Zieliński, P.1
  • 15
    • 0030788844 scopus 로고    scopus 로고
    • Psplib - A project scheduling library
    • Kolisch, R., Sprecher, A.: Psplib - a project scheduling library. Eur. J. Oper. Res. 96 (1996) 205-216
    • (1996) Eur. J. Oper. Res. , vol.96 , pp. 205-216
    • Kolisch, R.1    Sprecher, A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.