-
1
-
-
0026154176
-
Temporal constraint networks
-
Dechter, R., Meiri, I., Pearl, J.: Temporal constraint networks. Artif. Intell. 49 (1991) 61-95
-
(1991)
Artif. Intell.
, vol.49
, pp. 61-95
-
-
Dechter, R.1
Meiri, I.2
Pearl, J.3
-
2
-
-
84880915879
-
Dynamic control of plans with temporal uncertainty
-
Morris, P., Muscettola, N., Vidal, T.: Dynamic control of plans with temporal uncertainty. In: IJCAI. (2001) 494-502
-
(2001)
IJCAI.
, pp. 494-502
-
-
Morris, P.1
Muscettola, N.2
Vidal, T.3
-
3
-
-
0442314380
-
Handling contingency in temporal constraint networks: From consistency to controllabilities
-
Vidal, T., Fargier, H.: Handling contingency in temporal constraint networks: from consistency to controllabilities. JETAI 11 (1999) 23-45
-
(1999)
JETAI
, vol.11
, pp. 23-45
-
-
Vidal, T.1
Fargier, H.2
-
4
-
-
33646174868
-
Managing temporal uncertainty through waypoint controllability
-
Morris, P.H., Muscettola, N.: Managing temporal uncertainty through waypoint controllability. In: IJCAI. (1999) 1253-1258
-
(1999)
IJCAI.
, pp. 1253-1258
-
-
Morris, P.H.1
Muscettola, N.2
-
5
-
-
47249163307
-
Temporal constraint reasoning with preferences
-
Khatib, L., Morris, P., Morris, R., Rossi, F.: Temporal constraint reasoning with preferences. In: IJCAI. (2001) 322-327
-
(2001)
IJCAI.
, pp. 322-327
-
-
Khatib, L.1
Morris, P.2
Morris, R.3
Rossi, F.4
-
7
-
-
0036466460
-
The computational complexity of the criticality problems in a network with interval activity times
-
Chanas, S., Zieliński, P.: The computational complexity of the criticality problems in a network with interval activity times. Eur. J. Oper. Res. 136 (2002) 541-550
-
(2002)
Eur. J. Oper. Res.
, vol.136
, pp. 541-550
-
-
Chanas, S.1
Zieliński, P.2
-
8
-
-
23044503441
-
Computational methods for determining the latest starting times and floats of tasks in interval-valued activity networks
-
To appear
-
Dubois, D., Fargier, H., Fortin, J.: Computational methods for determining the latest starting times and floats of tasks in interval-valued activity networks. J. Intell. Manuf. (2005) To appear.
-
(2005)
J. Intell. Manuf.
-
-
Dubois, D.1
Fargier, H.2
Fortin, J.3
-
10
-
-
0037410423
-
Fuzzy scheduling: Modeling flexible constraints vs. coping with incomplete knowledge
-
Dubois, D., Fargier, H., Fortemps, P.: Fuzzy scheduling: modeling flexible constraints vs. coping with incomplete knowledge. Eur. J. Oper. Res. 147 (2003) 231-252
-
(2003)
Eur. J. Oper. Res.
, vol.147
, pp. 231-252
-
-
Dubois, D.1
Fargier, H.2
Fortemps, P.3
-
11
-
-
0037410243
-
On latest starting times and floats in activity networks with ill-known durations
-
Dubois, D., Fargier, H., Galvagnon, V.: On latest starting times and floats in activity networks with ill-known durations. Eur. J. Oper. Res. 147 (2003) 266-280
-
(2003)
Eur. J. Oper. Res.
, vol.147
, pp. 266-280
-
-
Dubois, D.1
Fargier, H.2
Galvagnon, V.3
-
12
-
-
0002146440
-
The use of fuzzy variables in pert
-
Chanas, S., Kamburowski, J.: The use of fuzzy variables in pert. Fuzzy Set Syst. 5 (1981) 1-19
-
(1981)
Fuzzy Set Syst.
, vol.5
, pp. 1-19
-
-
Chanas, S.1
Kamburowski, J.2
-
13
-
-
0036683729
-
On the sure criticality of tasks in activity networks with imprecise durations
-
Chanas, S., Dubois, D., Zieliński, P.: On the sure criticality of tasks in activity networks with imprecise durations. IEEE T. Syst. Man Cy. B 34 (2002) 393-407
-
(2002)
IEEE T. Syst. Man Cy. B
, vol.34
, pp. 393-407
-
-
Chanas, S.1
Dubois, D.2
Zieliński, P.3
-
14
-
-
11144288983
-
On computing the latest starting times and floats of activities in a network with imprecise durations
-
Zieliński, P.: On computing the latest starting times and floats of activities in a network with imprecise durations. Fuzzy Set Syst. 150 (2005) 53-76
-
(2005)
Fuzzy Set Syst.
, vol.150
, pp. 53-76
-
-
Zieliński, P.1
-
15
-
-
0030788844
-
Psplib - A project scheduling library
-
Kolisch, R., Sprecher, A.: Psplib - a project scheduling library. Eur. J. Oper. Res. 96 (1996) 205-216
-
(1996)
Eur. J. Oper. Res.
, vol.96
, pp. 205-216
-
-
Kolisch, R.1
Sprecher, A.2
|