메뉴 건너뛰기




Volumn 56, Issue 2, 2005, Pages 143-160

Hybrid genetic algorithm with adaptive abilities for resource-constrained multiple project scheduling

Author keywords

Fuzzy logic controller; Hybrid genetic algorithm; Resource constrained project scheduling problem; Scheduling

Indexed keywords

CONSTRAINT THEORY; FUZZY SETS; MATHEMATICAL MODELS; PARAMETER ESTIMATION; PROBLEM SOLVING; PROJECT MANAGEMENT; SCHEDULING;

EID: 13444278798     PISSN: 01663615     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.compind.2004.06.006     Document Type: Article
Times cited : (105)

References (31)
  • 1
    • 84989743918 scopus 로고
    • A new heuristic solution method in resource-constrained project scheduling
    • C.E. Bell, and J.M. Han A new heuristic solution method in resource-constrained project scheduling Naval Research Logistics 38 1991 315 331
    • (1991) Naval Research Logistics , vol.38 , pp. 315-331
    • Bell, C.E.1    Han, J.M.2
  • 4
    • 85007087950 scopus 로고    scopus 로고
    • Resource-constrained project scheduling problem using genetic algorithms
    • R. Cheng, and M. Gen Resource-constrained project scheduling problem using genetic algorithms Intelligent Automation and Soft Computing 3 1997 273 286
    • (1997) Intelligent Automation and Soft Computing , vol.3 , pp. 273-286
    • Cheng, R.1    Gen, M.2
  • 5
    • 0012442701 scopus 로고    scopus 로고
    • Truncated branch bound, schedule-construction, for resource-constrained project scheduling
    • B. Franck, K. Neumann, and C. Schwindt Truncated branch bound, schedule-construction, for resource-constrained project scheduling OR Spektrum. 23 2001 297 324
    • (2001) OR Spektrum. , vol.23 , pp. 297-324
    • Franck, B.1    Neumann, K.2    Schwindt, C.3
  • 6
    • 0033692178 scopus 로고    scopus 로고
    • Managing multiple engineering projects in a manufacturing support environment
    • S.E. Fricke, and A.J. Shenhar Managing multiple engineering projects in a manufacturing support environment IEEE Transactions on Engineering Management 47 2 2000 258 268
    • (2000) IEEE Transactions on Engineering Management , vol.47 , Issue.2 , pp. 258-268
    • Fricke, S.E.1    Shenhar, A.J.2
  • 7
    • 0035451950 scopus 로고    scopus 로고
    • Network design techniques using adapted genetic algorithms
    • M. Gen, R. Cheng, and S.S. Oren Network design techniques using adapted genetic algorithms Advances in Engineering Software 32 2001 731 744
    • (2001) Advances in Engineering Software , vol.32 , pp. 731-744
    • Gen, M.1    Cheng, R.2    Oren, S.S.3
  • 12
    • 0037211465 scopus 로고    scopus 로고
    • Managing Multiple Project Environments through Constant Work-in-process
    • S.A. Isakow, and B. Golany Managing Multiple Project Environments through Constant Work-in-process International Journal of Project Management 21 2003 9 18
    • (2003) International Journal of Project Management , vol.21 , pp. 9-18
    • Isakow, S.A.1    Golany, B.2
  • 13
    • 0030121479 scopus 로고    scopus 로고
    • Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
    • R. Kolisch Serial and parallel resource-constrained project scheduling methods revisited: theory and computation European Journal of Operational Research 90 1996 320 333
    • (1996) European Journal of Operational Research , vol.90 , pp. 320-333
    • Kolisch, R.1
  • 14
    • 0003118202 scopus 로고
    • Dynamic control of genetic algorithm using fuzzy logic techniques
    • Morgan Kaufmann Publishers, San Francisco
    • M. Lee, H. Takagi, Dynamic Control of Genetic Algorithm Using Fuzzy Logic Techniques, in: Proceedings of the 5th International Conference on Genetic Algorithms, Morgan Kaufmann Publishers, San Francisco, 1993, pp.76-83.
    • (1993) Proceedings of the 5th International Conference on Genetic Algorithms , pp. 76-83
    • Lee, M.1    Takagi, H.2
  • 15
    • 0035599853 scopus 로고    scopus 로고
    • Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiple project scheduling
    • A. Lova, and P. Tormos Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiple project scheduling Annals of Operations Research 102 2001 263 286
    • (2001) Annals of Operations Research , vol.102 , pp. 263-286
    • Lova, A.1    Tormos, P.2
  • 16
    • 0034559445 scopus 로고    scopus 로고
    • A multicriteria heuristic method to improve resource allocation in multiproject scheduling
    • A. Lova, C. Maroto, and P. Tormos A multicriteria heuristic method to improve resource allocation in multiproject scheduling European Journal of Operational Research 127 2 2000 408 424
    • (2000) European Journal of Operational Research , vol.127 , Issue.2 , pp. 408-424
    • Lova, A.1    Maroto, C.2    Tormos, P.3
  • 20
    • 0035837944 scopus 로고    scopus 로고
    • Resource-constrained project scheduling: An evaluation of adaptive control schemes for parameterized sampling heuristics
    • A. Schirmer Resource-constrained project scheduling: an evaluation of adaptive control schemes for parameterized sampling heuristics International Journal of Production Research 39 2001 1343 1365
    • (2001) International Journal of Production Research , vol.39 , pp. 1343-1365
    • Schirmer, A.1
  • 22
  • 24
    • 0002755938 scopus 로고
    • Scheduling optimization using genetic algorithms
    • L. Davis
    • G. Syswerda Scheduling optimization using genetic algorithms L. Davis Handbook of Genetic Algorithms 1991 332 349
    • (1991) Handbook of Genetic Algorithms , pp. 332-349
    • Syswerda, G.1
  • 25
    • 0035617605 scopus 로고    scopus 로고
    • A competitive heuristic solution technique for resource-constrained project scheduling
    • P. Tormos, and A. Lova A competitive heuristic solution technique for resource-constrained project scheduling Annals of Operations Research 102 2001 65 81
    • (2001) Annals of Operations Research , vol.102 , pp. 65-81
    • Tormos, P.1    Lova, A.2
  • 28
    • 0002709078 scopus 로고    scopus 로고
    • Optimal reactive power dispatch using an adaptive genetic algorithm
    • Q.H. Wu, Y.J. Cao, and J.Y. Wen Optimal reactive power dispatch using an adaptive genetic algorithm Electrical Power & Energy Systems 20 8 1998 563 569
    • (1998) Electrical Power & Energy Systems , vol.20 , Issue.8 , pp. 563-569
    • Wu, Q.H.1    Cao, Y.J.2    Wen, J.Y.3
  • 30
    • 0036642806 scopus 로고    scopus 로고
    • Advanced scheduling problem using constraint programming techniques in SCM environment
    • Y.S. Yun, and M. Gen Advanced scheduling problem using constraint programming techniques in SCM environment Computers & Industrial Engineering 43 2002 213 229
    • (2002) Computers & Industrial Engineering , vol.43 , pp. 213-229
    • Yun, Y.S.1    Gen, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.