1
-
-
84989743918
-
A new heuristic solution method in resource-constrained project scheduling
-
C.E. Bell, and J.M. Han A new heuristic solution method in resource-constrained project scheduling Naval Research Logistics 38 1991 315 331
-
(1991)
Naval Research Logistics
, vol.38
, pp. 315-331
-
-
Bell, C.E.1
Han, J.M.2
-
2
-
-
0032096810
-
Resource-constrained project scheduling: Notation, classification, model, and methods
-
P. Brucker, A. Drexl, R. Mohring, K. Neumann, and E. Pesch Resource-constrained project scheduling: notation, classification, model, and methods European Journal of Operational Research 107 1998 272 288
-
(1998)
European Journal of Operational Research
, vol.107
, pp. 272-288
-
-
Brucker, P.1
Drexl, A.2
Mohring, R.3
Neumann, K.4
Pesch, E.5
-
3
-
-
0033894645
-
Constraining the optimization of a fuzzy logic controller using an enhanced genetic algorithm
-
F. Cheong, and R. Lai Constraining the optimization of a fuzzy logic controller using an enhanced genetic algorithm IEEE Transactions on Systems, Man, and Cybernetics-Part B: Cybernetics 30 1 2000 31 46
-
(2000)
IEEE Transactions on Systems, Man, and Cybernetics-Part B: Cybernetics
, vol.30
, Issue.1
, pp. 31-46
-
-
Cheong, F.1
Lai, R.2
-
4
-
-
85007087950
-
Resource-constrained project scheduling problem using genetic algorithms
-
R. Cheng, and M. Gen Resource-constrained project scheduling problem using genetic algorithms Intelligent Automation and Soft Computing 3 1997 273 286
-
(1997)
Intelligent Automation and Soft Computing
, vol.3
, pp. 273-286
-
-
Cheng, R.1
Gen, M.2
-
5
-
-
0012442701
-
Truncated branch bound, schedule-construction, for resource-constrained project scheduling
-
B. Franck, K. Neumann, and C. Schwindt Truncated branch bound, schedule-construction, for resource-constrained project scheduling OR Spektrum. 23 2001 297 324
-
(2001)
OR Spektrum.
, vol.23
, pp. 297-324
-
-
Franck, B.1
Neumann, K.2
Schwindt, C.3
-
6
-
-
0033692178
-
Managing multiple engineering projects in a manufacturing support environment
-
S.E. Fricke, and A.J. Shenhar Managing multiple engineering projects in a manufacturing support environment IEEE Transactions on Engineering Management 47 2 2000 258 268
-
(2000)
IEEE Transactions on Engineering Management
, vol.47
, Issue.2
, pp. 258-268
-
-
Fricke, S.E.1
Shenhar, A.J.2
-
12
-
-
0037211465
-
Managing Multiple Project Environments through Constant Work-in-process
-
S.A. Isakow, and B. Golany Managing Multiple Project Environments through Constant Work-in-process International Journal of Project Management 21 2003 9 18
-
(2003)
International Journal of Project Management
, vol.21
, pp. 9-18
-
-
Isakow, S.A.1
Golany, B.2
-
13
-
-
0030121479
-
Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
-
R. Kolisch Serial and parallel resource-constrained project scheduling methods revisited: theory and computation European Journal of Operational Research 90 1996 320 333
-
(1996)
European Journal of Operational Research
, vol.90
, pp. 320-333
-
-
Kolisch, R.1
-
14
-
-
0003118202
-
Dynamic control of genetic algorithm using fuzzy logic techniques
-
Morgan Kaufmann Publishers, San Francisco
-
M. Lee, H. Takagi, Dynamic Control of Genetic Algorithm Using Fuzzy Logic Techniques, in: Proceedings of the 5th International Conference on Genetic Algorithms, Morgan Kaufmann Publishers, San Francisco, 1993, pp.76-83.
-
(1993)
Proceedings of the 5th International Conference on Genetic Algorithms
, pp. 76-83
-
-
Lee, M.1
Takagi, H.2
-
15
-
-
0035599853
-
Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiple project scheduling
-
A. Lova, and P. Tormos Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiple project scheduling Annals of Operations Research 102 2001 263 286
-
(2001)
Annals of Operations Research
, vol.102
, pp. 263-286
-
-
Lova, A.1
Tormos, P.2
-
16
-
-
0034559445
-
A multicriteria heuristic method to improve resource allocation in multiproject scheduling
-
A. Lova, C. Maroto, and P. Tormos A multicriteria heuristic method to improve resource allocation in multiproject scheduling European Journal of Operational Research 127 2 2000 408 424
-
(2000)
European Journal of Operational Research
, vol.127
, Issue.2
, pp. 408-424
-
-
Lova, A.1
Maroto, C.2
Tormos, P.3
-
20
-
-
0035837944
-
Resource-constrained project scheduling: An evaluation of adaptive control schemes for parameterized sampling heuristics
-
A. Schirmer Resource-constrained project scheduling: an evaluation of adaptive control schemes for parameterized sampling heuristics International Journal of Production Research 39 2001 1343 1365
-
(2001)
International Journal of Production Research
, vol.39
, pp. 1343-1365
-
-
Schirmer, A.1
-
21
-
-
0031190529
-
Environmental/economic dispatch using fuzzy logic controlled genetic algorithms
-
Y.H. Song, G.S. Wang, P.T. Wang, and A.T. Johns Environmental/economic dispatch using fuzzy logic controlled genetic algorithms IEEE Proceedings on Generation, Transmission and Distribution 144 4 1997 377 382
-
(1997)
IEEE Proceedings on Generation, Transmission and Distribution
, vol.144
, Issue.4
, pp. 377-382
-
-
Song, Y.H.1
Wang, G.S.2
Wang, P.T.3
Johns, A.T.4
-
24
-
-
0002755938
-
Scheduling optimization using genetic algorithms
-
L. Davis
-
G. Syswerda Scheduling optimization using genetic algorithms L. Davis Handbook of Genetic Algorithms 1991 332 349
-
(1991)
Handbook of Genetic Algorithms
, pp. 332-349
-
-
Syswerda, G.1
-
25
-
-
0035617605
-
A competitive heuristic solution technique for resource-constrained project scheduling
-
P. Tormos, and A. Lova A competitive heuristic solution technique for resource-constrained project scheduling Annals of Operations Research 102 2001 65 81
-
(2001)
Annals of Operations Research
, vol.102
, pp. 65-81
-
-
Tormos, P.1
Lova, A.2
-
28
-
-
0002709078
-
Optimal reactive power dispatch using an adaptive genetic algorithm
-
Q.H. Wu, Y.J. Cao, and J.Y. Wen Optimal reactive power dispatch using an adaptive genetic algorithm Electrical Power & Energy Systems 20 8 1998 563 569
-
(1998)
Electrical Power & Energy Systems
, vol.20
, Issue.8
, pp. 563-569
-
-
Wu, Q.H.1
Cao, Y.J.2
Wen, J.Y.3
-
30
-
-
0036642806
-
Advanced scheduling problem using constraint programming techniques in SCM environment
-
Y.S. Yun, and M. Gen Advanced scheduling problem using constraint programming techniques in SCM environment Computers & Industrial Engineering 43 2002 213 229
-
(2002)
Computers & Industrial Engineering
, vol.43
, pp. 213-229
-
-
Yun, Y.S.1
Gen, M.2
|