메뉴 건너뛰기




Volumn 50, Issue 23, 2012, Pages 7026-7043

An improved self-starting cumulative count of conforming chart for monitoring high-quality processes under group inspection

Author keywords

ARL unbiased; control chart; cumulative conformance count; high quality process; self starting

Indexed keywords

ARL-UNBIASED; CONTROL CHARTS; CUMULATIVE CONFORMANCE COUNT; HIGH QUALITY; SELF-STARTING;

EID: 84868531653     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2011.649305     Document Type: Article
Times cited : (34)

References (43)
  • 1
    • 70349319753 scopus 로고    scopus 로고
    • The optimal choice of negative binomial charts for monitoring high-quality processes
    • Albers, W., 2010. The optimal choice of negative binomial charts for monitoring high-quality processes. Journal of Statistical Planning and Inference, 140 (1), 214-225.
    • (2010) Journal of Statistical Planning and Inference , vol.140 , Issue.1 , pp. 214-225
    • Albers, W.1
  • 2
    • 0001088144 scopus 로고    scopus 로고
    • The geometric CUSUM chart with sampling inspection for monitoring fraction defective
    • Bourke, P.D., 2001. The geometric CUSUM chart with sampling inspection for monitoring fraction defective. Journal of Applied Statistics, 28 (8), 951-972.
    • (2001) Journal of Applied Statistics , vol.28 , Issue.8 , pp. 951-972
    • Bourke, P.D.1
  • 4
    • 0012098115 scopus 로고
    • Adjusting the s-chart for detecting both increases and decreases in the standard deviation
    • 20-22 November, Honolulu, HI
    • Champ, C.W. and Lowry, C.A., 1994. Adjusting the s-chart for detecting both increases and decreases in the standard deviation. In: Proceedings of the Decision Sciences Institute Annual Conference, 20-22 November, Honolulu, HI, 2112-2114.
    • (1994) Proceedings of the Decision Sciences Institute Annual Conference , pp. 2112-2114
    • Champ, C.W.1    Lowry, C.A.2
  • 5
    • 0038141831 scopus 로고    scopus 로고
    • A two-stage decision procedure for monitoring processes with low fraction nonconforming
    • Chan, L.Y., et al., 2003. A two-stage decision procedure for monitoring processes with low fraction nonconforming. European Journal of Operational Research, 150 (2), 420-436.
    • (2003) European Journal of Operational Research , vol.150 , Issue.2 , pp. 420-436
    • Chan, L.Y.1
  • 6
    • 69649091581 scopus 로고    scopus 로고
    • Optimal design for inspection and maintenance policy based on the CCC chart
    • Chan, L.Y. and Wu, S., 2009. Optimal design for inspection and maintenance policy based on the CCC chart. Computers & Industrial Engineering, 57 (3), 667-676.
    • (2009) Computers & Industrial Engineering , vol.57 , Issue.3 , pp. 667-676
    • Chan, L.Y.1    Wu, S.2
  • 7
    • 0035647367 scopus 로고    scopus 로고
    • Cumulative sum charts for high yield processes
    • Chang, T.C. and Gan, F.F., 2001. Cumulative sum charts for high yield processes. Statistica Sinica, 11 (3), 791-805. (Pubitemid 33669775)
    • (2001) Statistica Sinica , vol.11 , Issue.3 , pp. 791-805
    • Chang, T.C.1    Gan, F.F.2
  • 8
    • 73449136142 scopus 로고    scopus 로고
    • A new approach to setting control limits of cumulative count of conforming charts for high-yield processes
    • Chen, J.T., 2009. A new approach to setting control limits of cumulative count of conforming charts for high-yield processes. Quality and Reliability Engineering International, 25 (8), 973-986.
    • (2009) Quality and Reliability Engineering International , vol.25 , Issue.8 , pp. 973-986
    • Chen, J.T.1
  • 9
    • 1642519820 scopus 로고    scopus 로고
    • Evaluating and improving the synthetic control chart
    • Davis, R.B. and Woodall, W.H., 2002. Evaluating and improving the synthetic control chart. Journal of Quality Technology, 34 (2), 200-208.
    • (2002) Journal of Quality Technology , vol.34 , Issue.2 , pp. 200-208
    • Davis, R.B.1    Woodall, W.H.2
  • 11
    • 0023312888 scopus 로고
    • Control chart for very high yield processes
    • Goh, T.N., 1987. A control chart for very high yield processes. Quality Assurance, 13, 18-22. (Pubitemid 17587049)
    • (1987) Quality assurance London , vol.13 , Issue.1 , pp. 18-22
    • Goh, T.N.1
  • 12
    • 0007968898 scopus 로고
    • A labour-saving method of sampling
    • Haldane, J.B.S., 1945. A labour-saving method of sampling. Nature, 155 (3924), 49-50.
    • (1945) Nature , vol.155 , Issue.3924 , pp. 49-50
    • Haldane, J.B.S.1
  • 13
    • 0000464461 scopus 로고
    • Self-starting CUSUM charts for location and scale
    • Hawkins, D.M., 1987. Self-starting CUSUM charts for location and scale. The Statistician, 36 (4), 299-315.
    • (1987) The Statistician , vol.36 , Issue.4 , pp. 299-315
    • Hawkins, D.M.1
  • 14
    • 0036863901 scopus 로고    scopus 로고
    • Phase I control charts for times between events
    • DOI 10.1002/qre.496
    • Jones, L.A. and Champ, C.W., 2002. Phase I control charts for times between events. Quality and Reliability Engineering International, 18 (6), 479-488. (Pubitemid 35468096)
    • (2002) Quality and Reliability Engineering International , vol.18 , Issue.6 , pp. 479-488
    • Jones, L.A.1    Champ, C.W.2
  • 15
    • 0001866097 scopus 로고
    • Statistical control charts based on a Geometric distribution
    • Kaminsky, F.C., et al., 1992. Statistical control charts based on a Geometric distribution. Journal of Quality Technology, 24 (2), 63-69.
    • (1992) Journal of Quality Technology , vol.24 , Issue.2 , pp. 63-69
    • Kaminsky, F.C.1
  • 16
    • 70350645451 scopus 로고    scopus 로고
    • A study of time-between-events control chart for the monitoring of regularly maintained systems
    • Khoo, M.B.C. and Xie, M., 2009. A study of time-between-events control chart for the monitoring of regularly maintained systems. Quality and Reliability Engineering International, 25 (7), 805-819.
    • (2009) Quality and Reliability Engineering International , vol.25 , Issue.7 , pp. 805-819
    • Khoo, M.B.C.1    Xie, M.2
  • 19
    • 77953642417 scopus 로고    scopus 로고
    • Self-starting control chart for simultaneously monitoring process mean and variance
    • Li, Z., Zhang, J., and Wang, Z., 2010. Self-starting control chart for simultaneously monitoring process mean and variance. International Journal of Production Research, 48 (15), 4537-4553.
    • (2010) International Journal of Production Research , vol.48 , Issue.15 , pp. 4537-4553
    • Li, Z.1    Zhang, J.2    Wang, Z.3
  • 20
    • 31744441127 scopus 로고    scopus 로고
    • Cumulative count of conforming chart with variable sampling intervals
    • DOI 10.1016/j.ijpe.2005.01.006, PII S0925527305000447
    • Liu, J.Y., et al., 2006. Cumulative count of conforming chart with variable sampling intervals. International Journal of Production Economics, 101 (2), 286-297. (Pubitemid 43177616)
    • (2006) International Journal of Production Economics , vol.101 , Issue.2 , pp. 286-297
    • Liu, J.Y.1    Xie, M.2    Goh, T.N.3    Liu, Q.H.4    Yang, Z.H.5
  • 23
    • 0000046867 scopus 로고
    • SPC Q charts for start-up processes and short or long runs
    • Quesenberry, C.P., 1991. SPC Q charts for start-up processes and short or long runs. Journal of Quality Technology, 23 (3), 213-224.
    • (1991) Journal of Quality Technology , vol.23 , Issue.3 , pp. 213-224
    • Quesenberry, C.P.1
  • 24
    • 28844445510 scopus 로고    scopus 로고
    • Designing accurate control charts based on the geometric and negative binomial distributions
    • DOI 10.1002/qre.683
    • Schwertman, N.C., 2005. Designing accurate control charts based on the geometric and negative binomial distributions. Quality and Reliability Engineering International, 21 (8), 743-756. (Pubitemid 41766862)
    • (2005) Quality and Reliability Engineering International , vol.21 , Issue.8 , pp. 743-756
    • Schwertman, N.C.1
  • 25
    • 80052958795 scopus 로고    scopus 로고
    • Effective monitoring of processes with parts per million defective. A hard problem!
    • H.J. Lenz and P.T. Wilrich, eds. New York: Physica-Verlag
    • Steiner, S.H. and MacKay, R.J., 2004. Effective monitoring of processes with parts per million defective. A hard problem!. In: H.J. Lenz and P.T. Wilrich, eds. Frontiers in statistical quality control 7. New York: Physica-Verlag, 140-159.
    • (2004) Frontiers in Statistical Quality Control 7 , pp. 140-159
    • Steiner, S.H.1    MacKay, R.J.2
  • 26
    • 0036474028 scopus 로고    scopus 로고
    • A self-starting control chart for multivariate individual observations
    • DOI 10.1198/004017002753398290
    • Sullivan, J.H. and Jones, L.A., 2002. A self-starting control chart for multivariate individual observations. Technometrics, 44 (1), 24-33. (Pubitemid 34255509)
    • (2002) Technometrics , vol.44 , Issue.1 , pp. 24-33
    • Sullivan, J.H.1    Jones, L.A.2
  • 27
    • 3943057544 scopus 로고    scopus 로고
    • Cumulative conformance count chart with sequentially updated parameters
    • Tang, L.C. and Cheong, W.T., 2004. Cumulative conformance count chart with sequentially updated parameters. IIE Transactions, 36 (9), 841-853.
    • (2004) IIE Transactions , vol.36 , Issue.9 , pp. 841-853
    • Tang, L.C.1    Cheong, W.T.2
  • 28
    • 31644434209 scopus 로고    scopus 로고
    • A control scheme for high-yield correlated production under group inspection
    • Tang, L.C. and Cheong, W.T., 2006. A control scheme for high-yield correlated production under group inspection. Journal of Quality Technology, 38 (1), 45-55.
    • (2006) Journal of Quality Technology , vol.38 , Issue.1 , pp. 45-55
    • Tang, L.C.1    Cheong, W.T.2
  • 30
    • 1642459783 scopus 로고    scopus 로고
    • A synthetic control chart for detecting fraction nonconforming increases
    • Wu, Z., Yeo, S.H., and Spedding, T.A., 2001a. A synthetic control chart for detecting fraction nonconforming increases. Journal of Quality Technology, 33 (1), 104-111. (Pubitemid 33722669)
    • (2001) Journal of Quality Technology , vol.33 , Issue.1 , pp. 104-111
    • Wu, Z.1    Yeo, S.H.2    Spedding, T.A.3
  • 31
    • 0035401217 scopus 로고    scopus 로고
    • Design of the sum-of-conforming-run-length control charts
    • DOI 10.1016/S0377-2217(00)00131-4, PII S0377221700001314
    • Wu, Z., Zhang, X., and Yeo, S.H., 2001b. Design of the sum-of-conforming-run-length control charts. European Journal of Operational Research, 132, 187-196. (Pubitemid 32288121)
    • (2001) European Journal of Operational Research , vol.132 , Issue.1 , pp. 187-196
    • Wu, Z.1    Zhang, X.2    Yeo, S.H.3
  • 32
    • 67349115723 scopus 로고    scopus 로고
    • A control scheme for monitoring the frequency and magnitude of an event
    • Wu, Z., Jiao, J., and He, Z., 2009. A control scheme for monitoring the frequency and magnitude of an event. International Journal of Production Research, 47 (11), 2887-2902.
    • (2009) International Journal of Production Research , vol.47 , Issue.11 , pp. 2887-2902
    • Wu, Z.1    Jiao, J.2    He, Z.3
  • 33
    • 78349273111 scopus 로고    scopus 로고
    • A combined synthetic & X chart for monitoring the process mean
    • Wu, Z., et al., 2010. A combined synthetic & X chart for monitoring the process mean. International Journal of Production Research, 48 (24), 7423-7436.
    • (2010) International Journal of Production Research , vol.48 , Issue.24 , pp. 7423-7436
    • Wu, Z.1
  • 36
    • 0442315272 scopus 로고    scopus 로고
    • On the performance of geometric charts with estimated control limits
    • Yang, Z., et al., 2002. On the performance of geometric charts with estimated control limits. Journal of Quality Technology, 34 (4), 448-458.
    • (2002) Journal of Quality Technology , vol.34 , Issue.4 , pp. 448-458
    • Yang, Z.1
  • 37
    • 65249096695 scopus 로고    scopus 로고
    • EWMA control charts for monitoring high-yield processes based on non-transformed observations
    • Yeh, A.B., et al., 2008. EWMA control charts for monitoring high-yield processes based on non-transformed observations. International Journal of Production Research, 46 (20), 5679-5699.
    • (2008) International Journal of Production Research , vol.46 , Issue.20 , pp. 5679-5699
    • Yeh, A.B.1
  • 38
    • 33644634147 scopus 로고    scopus 로고
    • A self-starting procedure for monitoring process quality in multistage manufacturing systems
    • Zantek, P.F., Wright, G.P., and Plante, R.D., 2006. A self-starting procedure for monitoring process quality in multistage manufacturing systems. IIE Transactions, 38 (4), 293-308.
    • (2006) IIE Transactions , vol.38 , Issue.4 , pp. 293-308
    • Zantek, P.F.1    Wright, G.P.2    Plante, R.D.3
  • 39
    • 33750114360 scopus 로고    scopus 로고
    • On the statistical design of geometric control charts
    • Zhang, L., et al., 2004. On the statistical design of geometric control charts. Quality Technology & Quantitative Management, 1 (2), 233-234.
    • (2004) Quality Technology & Quantitative Management , vol.1 , Issue.2 , pp. 233-234
    • Zhang, L.1
  • 40
    • 33750141901 scopus 로고    scopus 로고
    • Design of exponential control charts using a sequential sampling scheme
    • DOI 10.1080/07408170600728905, PII H5537Q5G036327K3
    • Zhang, C.W., Xie, M, and Goh, T.N., 2006. Design of exponential control charts using a sequential sampling scheme. IIE Transactions, 38 (12), 1105-1116. (Pubitemid 44594174)
    • (2006) IIE Transactions (Institute of Industrial Engineers) , vol.38 , Issue.12 , pp. 1105-1116
    • Zhang, C.W.1    Xie, M.2    Goh, T.N.3
  • 41
    • 35348926139 scopus 로고    scopus 로고
    • A control chart for the Gamma distribution as a model of time between events
    • DOI 10.1080/00207540701325082, PII 780372651, Quality Engineering
    • Zhang, C.W., et al., 2007. A control chart for the Gamma distribution as a model of time between events. International Journal of Production Research, 45 (23), 5649-5666. (Pubitemid 47583702)
    • (2007) International Journal of Production Research , vol.45 , Issue.23 , pp. 5649-5666
    • Zhang, C.W.1    Xie, M.2    Liu, J.Y.3    Goh, T.N.4
  • 42
    • 36148986730 scopus 로고    scopus 로고
    • Economic design of cumulative count of conforming charts under inspection by samples
    • DOI 10.1016/j.ijpe.2006.11.015, PII S0925527307000096, Managing Supply Chain Metwork
    • Zhang, C.W., Xie, M., and Goh, T.N., 2008. Economic design of cumulative conforming control chart under sampling inspection. International Journal of Production Economics, 111 (1), 93-104. (Pubitemid 350117405)
    • (2008) International Journal of Production Economics , vol.111 , Issue.1 , pp. 93-104
    • Zhang, C.W.1    Xie, M.2    Goh, T.N.3
  • 43
    • 35348863724 scopus 로고    scopus 로고
    • A self-starting control chart for linear profiles
    • Zou, C., et al., 2007. A self-starting control chart for linear profiles. Journal of Quality Technology, 39 (4), 364-375. (Pubitemid 47585875)
    • (2007) Journal of Quality Technology , vol.39 , Issue.4 , pp. 364-375
    • Zou, C.1    Zhou, C.2    Wang, Z.3    Tsung, F.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.