-
1
-
-
0242333216
-
Robustness of the time between events CUSUM
-
Borror, C.M., Keats, J.B. and Montgomery, D.C., Robustness of the time between events CUSUM. Int. J. Prod. Res., 2003, 41(15), 3435-3444.
-
(2003)
Int. J. Prod. Res
, vol.41
, Issue.15
, pp. 3435-3444
-
-
Borror, C.M.1
Keats, J.B.2
Montgomery, D.C.3
-
2
-
-
0000301055
-
Detecting a shift in fraction non-conforming using run-length control charts with 100% inspection
-
Bourke, P.D., Detecting a shift in fraction non-conforming using run-length control charts with 100% inspection. J. Qual. Tech., 1991, 23(3), 225-238.
-
(1991)
J. Qual. Tech
, vol.23
, Issue.3
, pp. 225-238
-
-
Bourke, P.D.1
-
3
-
-
0001088144
-
The geometric CUSUM chart with sampling inspection for monitoring fraction defective
-
Bourke, P.D., The geometric CUSUM chart with sampling inspection for monitoring fraction defective. J. Appt. Statist., 2001, 28(8), 951-972.
-
(2001)
J. Appt. Statist
, vol.28
, Issue.8
, pp. 951-972
-
-
Bourke, P.D.1
-
4
-
-
0034688380
-
Cumulative quantity control charts for monitoring production processes
-
Chan, L.Y., Xie, M. and Goh, T.N., Cumulative quantity control charts for monitoring production processes. Int. J. Prod. Res., 2000, 38, 397-408.
-
(2000)
Int. J. Prod. Res
, vol.38
, pp. 397-408
-
-
Chan, L.Y.1
Xie, M.2
Goh, T.N.3
-
5
-
-
0003678327
-
Design of optimal exponential CUSUM control charts
-
Gan, F.F., Design of optimal exponential CUSUM control charts. J. Qual. Tech., 1994, 26(2), 109-124.
-
(1994)
J. Qual. Tech
, vol.26
, Issue.2
, pp. 109-124
-
-
Gan, F.F.1
-
6
-
-
0031652645
-
Designs of one- and two-sided exponential EWMA charts
-
Gan, F.F., Designs of one- and two-sided exponential EWMA charts. J. Qual. Tech., 1998, 30(1), 55-69.
-
(1998)
J. Qual. Tech
, vol.30
, Issue.1
, pp. 55-69
-
-
Gan, F.F.1
-
7
-
-
0242312718
-
Computing average run lengths for exponential CUSUM schemes
-
Gan, F.F. and Choi, K.P., Computing average run lengths for exponential CUSUM schemes. J. Qual. Tech., 1994, 26(2), 134-143.
-
(1994)
J. Qual. Tech
, vol.26
, Issue.2
, pp. 134-143
-
-
Gan, F.F.1
Choi, K.P.2
-
8
-
-
0028426065
-
On-line' G-control chart for attribute data
-
Glushkovsky, E.A., 'On-line' G-control chart for attribute data. Qual. & Reliab. Eng. Int., 1994, 10, 217-227.
-
(1994)
Qual. & Reliab. Eng. Int
, vol.10
, pp. 217-227
-
-
Glushkovsky, E.A.1
-
9
-
-
0018342609
-
A note on the intervals between coal-mining disasters
-
Jarrett, R.G., A note on the intervals between coal-mining disasters. Biometrika, 1979, 66(1), 191-193.
-
(1979)
Biometrika
, vol.66
, Issue.1
, pp. 191-193
-
-
Jarrett, R.G.1
-
10
-
-
0036863901
-
Phase I control charts for times between events
-
Jones, L.A. and Champ, C.W., Phase I control charts for times between events. Quality and Reliability Engineering International, 2002, 18, 479-488.
-
(2002)
Quality and Reliability Engineering International
, vol.18
, pp. 479-488
-
-
Jones, L.A.1
Champ, C.W.2
-
11
-
-
0022662421
-
The economic design of control charts: A unified approach
-
Lorenzen, T.J. and Vance, L.C., The economic design of control charts: a unified approach. Technometrics, 1986, 28, 3-10.
-
(1986)
Technometrics
, vol.28
, pp. 3-10
-
-
Lorenzen, T.J.1
Vance, L.C.2
-
12
-
-
0022060247
-
-
Lucas, J.M., Counted data CUSUM's. Technometrics, 1985, 27(2), 129-144.
-
(1985)
Technometrics
, vol.27
, Issue.2
, pp. 129-144
-
-
Lucas, J.M.1
data CUSUM's, C.2
-
13
-
-
0035518635
-
A CCC-r chart for high-yield processes
-
Ohta, H., Kusukawa, E. and Rahim, A., A CCC-r chart for high-yield processes. Qual. & Reliab. Eng. Int., 2001, 17, 439-446.
-
(2001)
Qual. & Reliab. Eng. Int
, vol.17
, pp. 439-446
-
-
Ohta, H.1
Kusukawa, E.2
Rahim, A.3
-
14
-
-
3943057544
-
Cumulative conformance count chart with sequentially updated parameters
-
Tang, L.C. and Cheong, W.T., Cumulative conformance count chart with sequentially updated parameters. HE Trans., 2004, 36(9), 841-853.
-
(2004)
HE Trans
, vol.36
, Issue.9
, pp. 841-853
-
-
Tang, L.C.1
Cheong, W.T.2
-
15
-
-
0022059208
-
Average run lengths for CUSUM schemes when observations are exponentially distributed
-
Vardeman, S. and Ray, D., Average run lengths for CUSUM schemes when observations are exponentially distributed. Technometrics, 1985,27, 145-150.
-
(1985)
Technometrics
, vol.27
, pp. 145-150
-
-
Vardeman, S.1
Ray, D.2
-
16
-
-
0034229097
-
A comparative study of the CRL-type control charts
-
Wu, Z., Yeo, S.H. and Fan, H., A comparative study of the CRL-type control charts. Qual. & Reliab. Eng. Int., 2000, 16, 269-279.
-
(2000)
Qual. & Reliab. Eng. Int
, vol.16
, pp. 269-279
-
-
Wu, Z.1
Yeo, S.H.2
Fan, H.3
-
17
-
-
0035401217
-
Design of the sum-of-conforming-run- length control charts
-
Wu, Z., Zhang, X. and Yeo, S.H., Design of the sum-of-conforming-run- length control charts. Euro. J. Op. Res., 2001, 132, 187-196.
-
(2001)
Euro. J. Op. Res
, vol.132
, pp. 187-196
-
-
Wu, Z.1
Zhang, X.2
Yeo, S.H.3
-
18
-
-
0036683237
-
Some effective control chart procedures for reliability monitoring
-
Xie, M., Goh, T.N. and Ranjan, P., Some effective control chart procedures for reliability monitoring. Reliab. Eng. & Syst. Safety, 2002, 77, 143-150.
-
(2002)
Reliab. Eng. & Syst. Safety
, vol.77
, pp. 143-150
-
-
Xie, M.1
Goh, T.N.2
Ranjan, P.3
-
19
-
-
0035973358
-
On economic design of cumulative count of conforming chart
-
Xie, M., Tang, X.Y. and Goh, T.N., On economic design of cumulative count of conforming chart. Int. J. Prod. Econ., 2001, 72(1), 89-97.
-
(2001)
Int. J. Prod. Econ
, vol.72
, Issue.1
, pp. 89-97
-
-
Xie, M.1
Tang, X.Y.2
Goh, T.N.3
-
20
-
-
30844443286
-
Economic design of exponential charts for time between events monitoring
-
Zhang, C.W., Xie, M. and Goh, T.N., Economic design of exponential charts for time between events monitoring. Int. J. Prod. Res., 2005, 43(23), 5019-5032.
-
(2005)
Int. J. Prod. Res
, vol.43
, Issue.23
, pp. 5019-5032
-
-
Zhang, C.W.1
Xie, M.2
Goh, T.N.3
-
21
-
-
33750141901
-
Design of exponential control charts using a sequential sampling scheme
-
Zhang, C.W., Xie, M. and Goh, T.N., Design of exponential control charts using a sequential sampling scheme. IIE Trans., 2006, 38(12), 1105-1116.
-
(2006)
IIE Trans
, vol.38
, Issue.12
, pp. 1105-1116
-
-
Zhang, C.W.1
Xie, M.2
Goh, T.N.3
|