-
2
-
-
0035479768
-
Optimizing preventive maintenance for mechanical components using genetic algorithms
-
Tsai YT,Wang KS, Teng HY. Optimizing preventive maintenance for mechanical components using genetic algorithms. Reliability Engineering and System Safety 2001; 74(1):89-97.
-
(2001)
Reliability Engineering and System Safety
, vol.74
, Issue.1
, pp. 89-97
-
-
Tsai Y.T.Wang, K.S.1
Teng, H.Y.2
-
3
-
-
0036566076
-
Determination of preventive maintenance periodicities of standby devices
-
da Motta SB, Colosimo EA. Determination of preventive maintenance periodicities of standby devices. Reliability Engineering and System Safety 2002; 76(2):149-154.
-
(2002)
Reliability Engineering and System Safety
, vol.76
, Issue.2
, pp. 149-154
-
-
Da Motta, S.B.1
Colosimo, E.A.2
-
4
-
-
36148986460
-
Maintenance scheduling for a manufacturing system of machines with adjustable throughput
-
Yang ZM, Djurdjanovic D, Ni J. Maintenance scheduling for a manufacturing system of machines with adjustable throughput. IIE Transactions 2007; 39(12):1111-1125.
-
(2007)
IIE Transactions
, vol.39
, Issue.12
, pp. 1111-1125
-
-
Yang, Z.M.1
Djurdjanovic, D.2
Ni, J.3
-
7
-
-
0031166049
-
Preventive maintenance in a 1 out of n system: The uptime, downtime and costs
-
Smith MAJ, Dekker R. Preventive maintenance in a 1 out of n system: The uptime, downtime and costs. European Journal of Operational Research 1997; 99(3):565-583.
-
(1997)
European Journal of Operational Research
, vol.99
, Issue.3
, pp. 565-583
-
-
Smith, M.A.J.1
Dekker, R.2
-
8
-
-
37449008048
-
Simultaneous optimization of X-control chart and age-based preventive maintenance policies under an economic objective
-
Yeung TG, Cassady CR, Schneider K. Simultaneous optimization of X-control chart and age-based preventive maintenance policies under an economic objective. IIE Transactions 2008; 40(2):147-159.
-
(2008)
IIE Transactions
, vol.40
, Issue.2
, pp. 147-159
-
-
Yeung, T.G.1
Cassady, C.R.2
Schneider, K.3
-
9
-
-
0023534679
-
Improved SPC using reliability concepts
-
Minneapolis, MN, U.S.A. ASQC: Milwaukee, WI, U.S.A
-
Lochner RH. Improved SPC using reliability concepts. 41st Annual Quality Congress Transactions, Minneapolis, MN, U.S.A. ASQC: Milwaukee, WI, U.S.A., 1987; 648-653.
-
(1987)
41st Annual Quality Congress Transactions
, pp. 648-653
-
-
Lochner, R.H.1
-
10
-
-
0025539239
-
Performance assessment and statistical process control. An approach to operation and maintenance cost reduction
-
Tokyo, Japan, 25-27 October.1989, Pergamon Press Inc.: Elmsford, NY, U.S.A
-
Kniele RG, Stephens GL, Vasudeva KS. Performance assessment and statistical process control. An approach to operation and maintenance cost reduction. Proceedings of the IFAC/IFORS/IAEE Symposium on Energy, Systems, Management and Economics, Tokyo, Japan, 25-27 October 1989. Pergamon Press Inc.: Elmsford, NY, U.S.A., 1990; 215-221.
-
Proceedings of the IFAC/IFORS/IAEE Symposium on Energy, Systems, Management and Economics
, vol.1990
, pp. 215-221
-
-
Kniele, R.G.1
Stephens, G.L.2
Vasudeva, K.S.3
-
11
-
-
0031385728
-
Predictive maintenance of an industrial laser using statistical process control charting
-
San Diego, CA, U.S.A. Laser Inst. of America: Orlando, FL, U.S.A
-
Katter JG, Tu JF, Monacelli LE, Gartner M. Predictive maintenance of an industrial laser using statistical process control charting. Proceedings of the 1997 Laser Materials Processing Conference, San Diego, CA, U.S.A. Laser Inst. of America: Orlando, FL, U.S.A., 1997; C57-C66.
-
(1997)
Proceedings of the 1997 Laser Materials Processing Conference
-
-
Katter, J.G.1
Tu, J.F.2
Monacelli, L.E.3
Gartner, M.4
-
12
-
-
0346342444
-
A condition-based failure-prediction and processing-scheme for preventive maintenance
-
Yang SK. A condition-based failure-prediction and processing-scheme for preventive maintenance. IEEE Transactions on Reliability 2003; 52(3):373-383.
-
(2003)
IEEE Transactions on Reliability
, vol.52
, Issue.3
, pp. 373-383
-
-
Yang, S.K.1
-
13
-
-
34247169901
-
Evaluation of maintenance schedules on railing traction power systems
-
Ho TK, Chi YL, Ferreira L, Leung KK, Siu LK. Evaluation of maintenance schedules on railing traction power systems. Proceedings of the I MECH E Part F Journal of Rail and Rapid Transit 2006; 220(2):91-102.
-
(2006)
Proceedings of the I MECH E Part F Journal of Rail and Rapid Transit
, vol.220
, Issue.2
, pp. 91-102
-
-
Ho, T.K.1
Chi, Y.L.2
Ferreira, L.3
Leung, K.K.4
Siu, L.K.5
-
16
-
-
0003167968
-
The use of probability limits for process control based on geometric distribution
-
Xie M, Goh TN. The use of probability limits for process control based on geometric distribution. International Journal of Quality and Reliability Management 1997; 14(1):64-73.
-
(1997)
International Journal of Quality and Reliability Management
, vol.14
, Issue.1
, pp. 64-73
-
-
Xie, M.1
Goh, T.N.2
-
17
-
-
0000405677
-
A quality monitoring and decision-making scheme for automated production processes
-
Xie M, Lu XS, Goh TN, Chan LY. A quality monitoring and decision-making scheme for automated production processes. International Journal of Quality and Reliability Management 1999; 16(2):148-157.
-
(1999)
International Journal of Quality and Reliability Management
, vol.16
, Issue.2
, pp. 148-157
-
-
Xie, M.1
Lu, X.S.2
Goh, T.N.3
Chan, L.Y.4
-
18
-
-
0002540501
-
On optimal setting of control limits for geometric chart
-
Xie M, Goh TN, Kuralmani V. On optimal setting of control limits for geometric chart. International Journal of Reliability, Quality and Safety Engineering 2000; 7(1):17-25.
-
(2000)
International Journal of Reliability, Quality and Safety Engineering
, vol.7
, Issue.1
, pp. 17-25
-
-
Xie, M.1
Goh, T.N.2
Kuralmani, V.3
-
22
-
-
0037050383
-
Cumulative probability control charts for geometric and exponential process characteristics
-
Chan LY, Lin DKJ, Xie M, Goh TN. Cumulative probability control charts for geometric and exponential process characteristics. International Journal of Production Research 2002; 40(1):133-150.
-
(2002)
International Journal of Production Research
, vol.40
, Issue.1
, pp. 133-150
-
-
Chan, L.Y.1
Lin, D.K.J.2
Xie, M.3
Goh, T.N.4
-
24
-
-
0442315272
-
On the performance of geometric charts with estimated control limits
-
Yang Z, Xie M, Kuralmani V, Tsui KL. On the performance of geometric charts with estimated control limits. Journal of Quality Technology 2002; 34(4):448-458.
-
(2002)
Journal of Quality Technology
, vol.34
, Issue.4
, pp. 448-458
-
-
Yang, Z.1
Xie, M.2
Kuralmani, V.3
Tsui, K.L.4
-
27
-
-
33750114360
-
On the statistical design of geometric control charts
-
Zhang L, Govindaraju K, Bebbington M, Lai CD. On the statistical design of geometric control charts. Quality Technology and Quantitative Management 2004; 1(2):233-243.
-
(2004)
Quality Technology and Quantitative Management
, vol.1
, Issue.2
, pp. 233-243
-
-
Zhang, L.1
Govindaraju, K.2
Bebbington, M.3
Lai, C.D.4
-
28
-
-
30844443286
-
Economic design of exponential charts for time between events monitoring
-
Zhang CW, Xie M, Goh TN. Economic design of exponential charts for time between events monitoring. International Journal of Production Research 2005; 43(23):5019-5032.
-
(2005)
International Journal of Production Research
, vol.43
, Issue.23
, pp. 5019-5032
-
-
Zhang, C.W.1
Xie, M.2
Goh, T.N.3
-
29
-
-
3943057544
-
Cumulative conformance count chart with sequentially updated parameters
-
Tang LC, Cheong WT. Cumulative conformance count chart with sequentially updated parameters. IIE Transactions 2004; 36(9):841-853.
-
(2004)
IIE Transactions
, vol.36
, Issue.9
, pp. 841-853
-
-
Tang, L.C.1
Cheong, W.T.2
-
30
-
-
28844445510
-
Designing accurate control charts based on the geometric and negative binomial distributions
-
Schwertman NC. Designing accurate control charts based on the geometric and negative binomial distributions. Quality and Reliability Engineering International 2005; 21(8):743-756.
-
(2005)
Quality and Reliability Engineering International
, vol.21
, Issue.8
, pp. 743-756
-
-
Schwertman, N.C.1
-
31
-
-
70350646490
-
A comparative study of exponential time between events charts
-
Liu JY, Xie M, Goh TN, Sharma PR. A comparative study of exponential time between events charts. Quality Technology and Quantitative Management 2006; 3(3):347-359.
-
(2006)
Quality Technology and Quantitative Management
, vol.3
, Issue.3
, pp. 347-359
-
-
Liu, J.Y.1
Xie, M.2
Goh, T.N.3
Sharma, P.R.4
-
32
-
-
33847009557
-
A study of EWMA chart with transformed exponential data
-
Liu JY, Xie M, Goh TN, Chan LY. A study of EWMA chart with transformed exponential data. International Journal of Production Research 2007; 45(3):743-763.
-
(2007)
International Journal of Production Research
, vol.45
, Issue.3
, pp. 743-763
-
-
Liu, J.Y.1
Xie, M.2
Goh, T.N.3
Chan, L.Y.4
|