메뉴 건너뛰기




Volumn 38, Issue 12, 2006, Pages 1105-1116

Design of exponential control charts using a sequential sampling scheme

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER SIMULATION; STATISTICAL METHODS; STATISTICAL PROCESS CONTROL;

EID: 33750141901     PISSN: 0740817X     EISSN: 15458830     Source Type: Journal    
DOI: 10.1080/07408170600728905     Document Type: Article
Times cited : (67)

References (24)
  • 1
    • 0032661411 scopus 로고    scopus 로고
    • A comparison of control charting procedures for monitoring process dispersion
    • [CSA]
    • Acosta-Mejia, C. and Pignatiello, J., Jr. and Rao, B. (1999) A comparison of control charting procedures for monitoring process dispersion IIE Transactions, 31, pp. 569-579. http://www.csa.com/htbin/ linkabst.cgi?issn=0740-817X&vol=31&iss=&firstpage=569 [CSA]
    • (1999) IIE Transactions , vol.31 , pp. 569-579
    • Acosta-Mejia, C.1    Pignatiello Jr., J.2    Rao, B.3
  • 2
    • 0242333216 scopus 로고    scopus 로고
    • Robustness of the time between events CUSUM
    • [CROSSREF]
    • Borror, C. and Keats, J. and Montgomery, D. (2003) Robustness of the time between events CUSUM International Journal of Production Research 41(15), pp. 3435-3444. http://dx.doi.org/10.1080%2F0020754031000138321 [CROSSREF]
    • (2003) International Journal of Production Research , vol.41 , Issue.15 , pp. 3435-3444
    • Borror, C.1    Keats, J.2    Montgomery, D.3
  • 3
    • 0034688380 scopus 로고    scopus 로고
    • Cumulative quantity control charts for monitoring production processes
    • [CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=0020-7543&vol= 38&iss=2&firstpage=397 [CSA]
    • Chan, L. and Xie, M. and Goh, T. (2000) Cumulative quantity control charts for monitoring production processes International Journal of Production Research, 38(2), pp. 397-408. http://dx.doi.org/ 10.1080%2F002075400189482 [CROSSREF] http://www.csa.com/htbin/ linkabst.cgi?issn=0020-7543&vol=38&iss=2&firstpage=397 [CSA]
    • (2000) International Journal of Production Research , vol.38 , Issue.2 , pp. 397-408
    • Chan, L.1    Xie, M.2    Goh, T.3
  • 4
    • 23744499925 scopus 로고    scopus 로고
    • Monitoring infrequent failures of high-volume production processes
    • [CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=0748-8017&vol= 21&iss=5&firstpage=521 [CSA]
    • Di Bucchianico, A. and Mooiweer, G. and Moonen, E. (2005) Monitoring infrequent failures of high-volume production processes Quality and Reliability Engineering International, 21(5), pp. 521-528. http://dx.doi.org/10.1002%2Fqre.738 [CROSSREF] http://www.csa.com/htbin/ linkabst.cgi?issn=0748-8017&vol=21&iss=5&firstpage=521 [CSA]
    • (2005) Quality and Reliability Engineering International , vol.21 , Issue.5 , pp. 521-528
    • Di Bucchianico, A.1    Mooiweer, G.2    Moonen, E.3
  • 5
    • 0006378392 scopus 로고
    • Exact run length distributions for one-sided exponential CUSUM schemes
    • [CSA]
    • Gan, F. (1992) Exact run length distributions for one-sided exponential CUSUM schemes Statistica Sinica, 2(1), pp. 297-312. http://www.csa.com/ htbin/linkabst.cgi?issn=&vol=2&iss=5&firstpage=297 [CSA]
    • (1992) Statistica Sinica , vol.2 , Issue.1 , pp. 297-312
    • Gan, F.1
  • 6
    • 0003678327 scopus 로고
    • Design of optimal exponential CUSUM control charts
    • [CSA]
    • Gan, F. (1994) Design of optimal exponential CUSUM control charts Journal of Quality Technology, 26(2), pp. 109-124. http://www.csa.com/ htbin/linkabst.cgi?issn=0022-4065&vol=26&iss=2&firstpage=109 [CSA]
    • (1994) Journal of Quality Technology , vol.26 , Issue.2 , pp. 109-124
    • Gan, F.1
  • 7
    • 0031652645 scopus 로고    scopus 로고
    • Designs of one- and two-sided exponential EWMA charts
    • [CSA]
    • Gan, F. (1998) Designs of one- and two-sided exponential EWMA charts Journal of Quality Technology, 30(1), pp. 55-69. http://www.csa.com/ htbin/linkabst.cgi?issn=0022-4065&vol=30&iss=1&firstpage=55 [CSA]
    • (1998) Journal of Quality Technology , vol.30 , Issue.1 , pp. 55-69
    • Gan, F.1
  • 8
    • 0011108232 scopus 로고    scopus 로고
    • Computing average run lengths of exponential EWMA charts
    • [CSA]
    • Gan, F. and Chang, T. (2000) Computing average run lengths of exponential EWMA charts Journal of Quality Technology, 32(2), pp. 183-187. http://www.csa.com/htbin/linkabst.cgi?issn=0022-4065&vol= 32&iss=2&firstpage=183 [CSA]
    • (2000) Journal of Quality Technology , vol.32 , Issue.2 , pp. 183-187
    • Gan, F.1    Chang, T.2
  • 9
    • 0242312718 scopus 로고
    • Computing average run lengths for exponential CUSUM schemes
    • [CSA]
    • Gan, F. and Choi, K. (1994) Computing average run lengths for exponential CUSUM schemes Journal of Quality Technology, 26(2), pp. 134-143. http://www.csa.com/htbin/linkabst.cgi?issn=0022-4065&vol= 26&iss=2&firstpage=134 [CSA]
    • (1994) Journal of Quality Technology , vol.26 , Issue.2 , pp. 134-143
    • Gan, F.1    Choi, K.2
  • 11
    • 0018342609 scopus 로고
    • A note on the intervals between coal-mining disasters
    • [CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=0006-3444&vol= 66&iss=1&firstpage=191 [CSA]
    • Jarrett, R. (1979) A note on the intervals between coal-mining disasters Biometrika, 66(1), pp. 191-193. http://dx.doi.org/10.2307%2F2335266 [CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=0006-3444&vol= 66&iss=1&firstpage=191 [CSA]
    • (1979) Biometrika , vol.66 , Issue.1 , pp. 191-193
    • Jarrett, R.1
  • 13
    • 0036863901 scopus 로고    scopus 로고
    • Phase I control charts for times between events
    • [CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=0748-8017&1vol= 18&iss=&firstpage=479 [CSA]
    • Jones, L. and Champ, C. (2002) Phase I control charts for times between events Quality and Reliability Engineering International, 18, pp. 479-488. http://dx.doi.org/10.1002%2Fqre.496 [CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=0748-8017&1vol=18&iss= &firstpage=479 [CSA]
    • (2002) Quality and Reliability Engineering International , vol.18 , pp. 479-488
    • Jones, L.1    Champ, C.2
  • 14
    • 0022060247 scopus 로고
    • Counted data CUSUM's
    • [CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=0040-1706&vol= 27&iss=2&firstpage=129 [CSA]
    • Lucas, J. (1985) Counted data CUSUM's Technometrics, 27(2), pp. 129-144. http://dx.doi.org/10.2307%2F1268761 [CROSSREF] http://www.csa.com/htbin/ linkabst.cgi?issn=0040-1706&vol=27&iss=2&firstpage=129 [CSA]
    • (1985) Technometrics , vol.27 , Issue.2 , pp. 129-144
    • Lucas, J.1
  • 15
    • 13844256900 scopus 로고    scopus 로고
    • On constructing retrospective (X)over bar control chart limits
    • [CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=0748-8017&vol= 21&iss=1&firstpage=81 [CSA]
    • Nedumaran, G. and Pignatiello, J. (2005) On constructing retrospective (X)over bar control chart limits Quality and Reliability Engineering International, 21(1), pp. 81-89. http://dx.doi.org/10.1002%2Fqre.609 [CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=0748-8017&vol= 21&iss=1&firstpage=81 [CSA]
    • (2005) Quality and Reliability Engineering International , vol.21 , Issue.1 , pp. 81-89
    • Nedumaran, G.1    Pignatiello, J.2
  • 17
    • 3943057544 scopus 로고    scopus 로고
    • Cumulative conformance count chart with sequentially updated parameters
    • [CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=0740-817X&vol= 36&iss=9&firstpage=841 [CSA]
    • Tang, L. and Cheong, W. (2004) Cumulative conformance count chart with sequentially updated parameters IIE Transactions, 36(9), pp. 841-853. http://dx.doi.org/10.1080%2F07408170490473024 [CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=0740-817X&vol=36&iss= 9&firstpage=841 [CSA]
    • (2004) IIE Transactions , vol.36 , Issue.9 , pp. 841-853
    • Tang, L.1    Cheong, W.2
  • 18
    • 0022059208 scopus 로고
    • Average run lengths for CUSUM schemes when observations are exponentially distributed
    • [CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=0040-1706&vol= 27&iss=&firstpage=145 [CSA]
    • Vardeman, S. and Ray, D. (1985) Average run lengths for CUSUM schemes when observations are exponentially distributed Technometrics, 27, pp. 145-150. http://dx.doi.org/10.2307%2F1268762 [CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=0040-1706&vol=27&iss= &firstpage=145 [CSA]
    • (1985) Technometrics , vol.27 , pp. 145-150
    • Vardeman, S.1    Ray, D.2
  • 19
    • 0001648555 scopus 로고    scopus 로고
    • Research issues and ideas in statistical process control
    • [CSA]
    • Woodall, W. and Montgomery, D. (1999) Research issues and ideas in statistical process control Journal of Quality Technology, 31, pp. 376-386. http://www.csa.com/htbin/linkabst.cgi?issn=0022-4065&vol= 31&iss=&firstpage=376 [CSA]
    • (1999) Journal of Quality Technology , vol.31 , pp. 376-386
    • Woodall, W.1    Montgomery, D.2
  • 20
    • 0002540501 scopus 로고    scopus 로고
    • On optimal setting of control limits for geometric chart
    • [CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=0218-5393&vol= 7&iss=1&firstpage=17 [CSA]
    • Xie, M. and Goh, T. and Kuralmani, V. (2000) On optimal setting of control limits for geometric chart International Journal of Reliability, Quality and Safety Engineering, 7(1), pp. 17-25. http://dx.doi.org/ 10.1142%2FS0218539300000031 [CROSSREF] http://www.csa.com/htbin/ linkabst.cgi?issn=0218-5393&vol=7&iss=1&firstpage=17 [CSA]
    • (2000) International Journal of Reliability, Quality and Safety Engineering , vol.7 , Issue.1 , pp. 17-25
    • Xie, M.1    Goh, T.2    Kuralmani, V.3
  • 21
    • 0036683237 scopus 로고    scopus 로고
    • Some effective control chart procedures for reliability monitoring
    • [CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=0951-8320&vol= 77&iss=&firstpage=143 [CSA]
    • Xie, M. and Goh, T. and Ranjan, P. (2002) Some effective control chart procedures for reliability monitoring Reliability Engineering & System Safety, 77, pp. 143-150. http://dx.doi.org/ 10.1016%2FS0951-8320%2802%2900041-8 [CROSSREF] http://www.csa.com/htbin/ linkabst.cgi?issn=0951-8320&vol=77&iss=&firstpage=143 [CSA]
    • (2002) Reliability Engineering & System Safety , vol.77 , pp. 143-150
    • Xie, M.1    Goh, T.2    Ranjan, P.3
  • 22
    • 0442315272 scopus 로고    scopus 로고
    • On the performance of geometric charts with estimated control limits
    • [CSA]
    • Yang, Z. and Xie, M. and Kuralmani, V. and Tsui, K. (2002) On the performance of geometric charts with estimated control limits Journal of Quality Technology, 34, pp. 448-458. http://www.csa.com/htbin/ linkabst.cgi?issn=0022-4065&vol=34&iss=&firstpage=448 [CSA]
    • (2002) Journal of Quality Technology , vol.34 , pp. 448-458
    • Yang, Z.1    Xie, M.2    Kuralmani, V.3    Tsui, K.4
  • 23
    • 33750129535 scopus 로고    scopus 로고
    • A note on EWMA charts for monitoring mean changes in normal processes
    • [CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=&vol= 31&iss=&firstpage=649 [CSA]
    • Zhang, L. and Chen, G. (2002) A note on EWMA charts for monitoring mean changes in normal processes Communications in Statistics: Theory and Methods, 31(4), pp. 649-661. http://dx.doi.org/10.1081%2FSTA-120003140 [CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=&vol= 31&iss=&firstpage=649 [CSA]
    • (2002) Communications in Statistics: Theory and Methods , vol.31 , Issue.4 , pp. 649-661
    • Zhang, L.1    Chen, G.2
  • 24
    • 33750114360 scopus 로고    scopus 로고
    • On the statistical design of geometric control charts
    • [CSA]
    • Zhang, L. and Govindaraju, K. and Bebbington, M. and Lai, C. (2004) On the statistical design of geometric control charts Quality Technology & Quantitative Management, 1(2), pp. 233-234. http://www.csa.com/ htbin/linkabst.cgi?issn=&vol=1&iss=&firstpage=233 [CSA]
    • (2004) Quality Technology & Quantitative Management , vol.1 , Issue.2 , pp. 233-234
    • Zhang, L.1    Govindaraju, K.2    Bebbington, M.3    Lai, C.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.