Structural equation model for investigating factors affecting delay in Indian construction projects

Author keywords

Delay; India; Structural equation modelling; Time

Indexed keywords

CONSTRUCTION PROJECTS; CONSTRUCTION SECTORS; CONTRIBUTING FACTOR; DELAY; DIRECT IMPACT; EFFICIENT CONSTRUCTION; INDIA; LATENT VARIABLE; ON-TIME DELIVERY; PROJECT DELAYS; QUESTIONNAIRE SURVEYS; RAPID GROWTH; ROOT CAUSE; STRUCTURAL EQUATION MODELLING; STRUCTURAL EQUATION MODELS; SYSTEMATIC ANALYSIS; TECHNICAL EXPERTISE; TIME; TIME PERFORMANCE;

EID: 84867656124     PISSN: 01446193     EISSN: 1466433X     Source Type: Journal    
DOI: 10.1080/01446193.2012.717705     Document Type: Article
Times cited : (95)

References (55)
  • 1
    • 70450263655 scopus 로고    scopus 로고
    • Analysis of cost and schedule performance of international development projects
    • Ahsan, M.K. and Gunawan, I. 2010. Analysis of cost and schedule performance of international development projects. International Journal of Project Management, 28: 68-78.
    • (2010) International Journal of Project Management , vol.28 , pp. 68-78
    • Ahsan, M.K.1    Gunawan, I.2
  • 2
    • 0036836295 scopus 로고    scopus 로고
    • The effects of construction delays on project delivery in Nigerian construction industry
    • Aibinu, A.A. and Jagboro, G.O. 2002. The effects of construction delays on project delivery in Nigerian construction industry. International Journal of Project Management, 20: 593-599.
    • (2002) International Journal of Project Management , vol.20 , pp. 593-599
    • Aibinu, A.A.1    Jagboro, G.O.2
  • 4
    • 4143113321 scopus 로고    scopus 로고
    • Important causes of delay in public utility projects in Saudi Arabia
    • Al-Khalil, M. and Al-Ghafly, M. (1999) Important causes of delay in public utility projects in Saudi Arabia. Construction Management and Economics, 17, 647-55.
    • (1999) Construction Management and Economics , vol.17 , pp. 55-647
    • Al-Khalil, M.1    Al-Ghafly, M.2
  • 5
    • 61649124532 scopus 로고    scopus 로고
    • Causes of delays in Saudi Arabian public sector construction projects
    • Al-Kharashi, A. and Skitmore, M. 2009. Causes of delays in Saudi Arabian public sector construction projects. Construction Management and Economics, 27: 3-23.
    • (2009) Construction Management and Economics , vol.27 , pp. 3-23
    • Al-Kharashi, A.1    Skitmore, M.2
  • 10
    • 33751224822 scopus 로고
    • Convergent and discriminant validity by the multitrait-multimethod matrix
    • Campbell, D.T. and Fiske, D.W. 1959. Convergent and discriminant validity by the multitrait-multimethod matrix. Psychological Bulletin, 56: 81-105.
    • (1959) Psychological Bulletin , vol.56 , pp. 81-105
    • Campbell, D.T.1    Fiske, D.W.2
  • 12
    • 0035040471 scopus 로고    scopus 로고
    • Time-cost relationship of public sector projects in Malaysia
    • Chan, A.P.C. 2001. Time-cost relationship of public sector projects in Malaysia. International Journal of Project Management, 19: 223
    • (2001) International Journal of Project Management , vol.19 , pp. 223
    • Chan, A.P.C.1
  • 13
    • 0031078243 scopus 로고    scopus 로고
    • A comparative study of causes of time overruns in Hong Kong construction projects
    • Chan, D.W.M. and Kumaraswamy, M.M. (1997b) A comparative study of causes of time overruns in Hong Kong construction projects. International Journal of Project Management, 15, 55-63.
    • (1997) International Journal of Project Management , vol.15 , pp. 55-63
    • Chan, D.W.M.1    Kumaraswamy, M.M.2
  • 14
    • 77449117316 scopus 로고    scopus 로고
    • Analysis of pre-qualification criteria in contractor selection and their impacts on project success
    • Doloi, H. 2009a. Analysis of pre-qualification criteria in contractor selection and their impacts on project success. Construction Management and Economics, 27: 1245-1263.
    • (2009) Construction Management and Economics , vol.27 , pp. 1245-1263
    • Doloi, H.1
  • 15
    • 77449135720 scopus 로고    scopus 로고
    • Relational partnerships: the importance of communication, trust and confidence and joint risk management in achieving project success
    • Doloi, H. 2009b. Relational partnerships: the importance of communication, trust and confidence and joint risk management in achieving project success. Construction Management and Economics, 27: 1099-1109.
    • (2009) Construction Management and Economics , vol.27 , pp. 1099-1109
    • Doloi, H.1
  • 20
    • 33751295266 scopus 로고    scopus 로고
    • Significant factors causing delay in the UAE construction industry
    • Faridi, A. and El-Sayegh, S. 2006. Significant factors causing delay in the UAE construction industry. Construction Management and Economics, 24: 1167-1176.
    • (2006) Construction Management and Economics , vol.24 , pp. 1167-1176
    • Faridi, A.1    El-Sayegh, S.2
  • 24
  • 25
    • 18144374111 scopus 로고    scopus 로고
    • Factors affecting cost performance. evidence from Indian construction projects
    • Iyer, K.C. and Jha, K.N. 2005. Factors affecting cost performance. evidence from Indian construction projects. International Journal of Project Management, 23: 283-295.
    • (2005) International Journal of Project Management , vol.23 , pp. 283-295
    • Iyer, K.C.1    Jha, K.N.2
  • 26
    • 34248386893 scopus 로고    scopus 로고
    • Ranking and classification of construction coordination activities in Indian projects
    • Jha, K.N. and Misra, S. 2007. Ranking and classification of construction coordination activities in Indian projects. Construction Management and Economics, 25: 409-421.
    • (2007) Construction Management and Economics , vol.25 , pp. 409-421
    • Jha, K.N.1    Misra, S.2
  • 27
    • 34047114879 scopus 로고    scopus 로고
    • Relationship-based determinants of building project performance in China
    • Jin, X.-H., Doloi, H. and Gao, S.-Y. 2007. Relationship-based determinants of building project performance in China. Construction Management and Economics, 25: 297-304.
    • (2007) Construction Management and Economics , vol.25 , pp. 297-304
    • Jin, X.-H.1    Doloi, H.2    Gao, S.-Y.3
  • 32
    • 33645542004 scopus 로고    scopus 로고
    • Risks faced by Singapore firms when undertaking construction projects in India
    • Ling, F.Y.Y. and Hoi, L. 2006. Risks faced by Singapore firms when undertaking construction projects in India. International Journal of Project Management, 24: 261-270.
    • (2006) International Journal of Project Management , vol.24 , pp. 261-270
    • Ling, F.Y.Y.1    Hoi, L.2
  • 37
    • 84867650046 scopus 로고    scopus 로고
    • MOSPI Infrastructure and Project Monitoring DivisionJanuary-March, available at (accessed August 2012)
    • MOSPI Infrastructure and Project Monitoring Division (2004) Project implementation status report on central sector projects, January-March, available at www.mospi.gov.in (accessed August 2012).
    • (2004) Project implementation status report on central sector projects
  • 38
    • 0002733516 scopus 로고
    • Construction time-influencing factors: the contractor's perspective
    • Nkado, R.N. 1995. Construction time-influencing factors: the contractor's perspective. Construction Management and Economics, 13: 81-89.
    • (1995) Construction Management and Economics , vol.13 , pp. 81-89
    • Nkado, R.N.1
  • 42
    • 2142785483 scopus 로고    scopus 로고
    • The causes and effects of construction delays on completion cost of housing projects in Nigeria
    • Odeyinka, H.A. and Yusif, A. 1997. The causes and effects of construction delays on completion cost of housing projects in Nigeria. Journal of Financial Management of Property and Construction, 2: 31-44.
    • (1997) Journal of Financial Management of Property and Construction , vol.2 , pp. 31-44
    • Odeyinka, H.A.1    Yusif, A.2
  • 43
    • 77953674695 scopus 로고    scopus 로고
    • Cost and time control of construction projects: inhibiting factors and mitigating measures in practice
    • Olawale, Y.A. and Sun, M. 2010. Cost and time control of construction projects: inhibiting factors and mitigating measures in practice. Construction Management and Economics, 28: 509-526.
    • (2010) Construction Management and Economics , vol.28 , pp. 509-526
    • Olawale, Y.A.1    Sun, M.2
  • 44
    • 84867653384 scopus 로고    scopus 로고
    • The Eleventh Five Year Plan, Chapter 14
    • Planning Commission of India available at (accessed August 2012)
    • Planning Commission of India (2011) The Eleventh Five Year Plan, Chapter 14, Development of Infrastructure, available at http://planningcommission.nic.in/plans/planrel/fiveyr/11th/11_v1/11v1_ch12.pdf (accessed August 2012).
    • (2011) Development of Infrastructure
  • 48
    • 0002965495 scopus 로고
    • The similarity of individual directed and group directed leader behavior descriptions
    • Schriesheim, C.A. 1979. The similarity of individual directed and group directed leader behavior descriptions. Academy of Management Journal, 22: 345-355.
    • (1979) Academy of Management Journal , vol.22 , pp. 345-355
    • Schriesheim, C.A.1
  • 50
    • 77953353092 scopus 로고    scopus 로고
    • Delays and cost overruns in infrastructure projects: extent causes and remedies
    • xlv
    • Singh, R. (2010) Delays and cost overruns in infrastructure projects: extent, causes and remedies. Economic and Political Weekly, xlv, 43-54.
    • (2010) Economic and Political Weekly , pp. 43-54
    • Singh, R.1
  • 51
    • 48749096408 scopus 로고    scopus 로고
    • Component-based structural equation modelling
    • Tenenhaus, M. 2008. Component-based structural equation modelling. Total Quality Management, 19: 871-886.
    • (2008) Total Quality Management , vol.19 , pp. 871-886
    • Tenenhaus, M.1
  • 53
    • 84861409414 scopus 로고    scopus 로고
    • Structural equation modelling of lean manufacturing practices
    • Vinodh, S. and Joy, D. 2012. Structural equation modelling of lean manufacturing practices. International Journal of Production Research, 50: 1598-1607.
    • (2012) International Journal of Production Research , vol.50 , pp. 1598-1607
    • Vinodh, S.1    Joy, D.2
  • 54
  • 55
    • 44649091201 scopus 로고    scopus 로고
    • Using structural equation modelling to analyze relationships among key causes of delay in construction
    • Yang, J.-B. and Ou, S.-F. 2008. Using structural equation modelling to analyze relationships among key causes of delay in construction. Canadian Journal of Civil Engineering, 35: 321-332.
    • (2008) Canadian Journal of Civil Engineering , vol.35 , pp. 321-332
    • Yang, J.-B.1    Ou, S.-F.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.