Volumn 132, Issue 7, 2006, Pages 667-677

Construction delays and their causative factors in nigeria

Author keywords

Buildings; Construction management; Delay time; Nigeria; Project management

Indexed keywords

BUILDINGS; DATA ACQUISITION; DEVELOPING COUNTRIES; PARETO PRINCIPLE; POISSON DISTRIBUTION; PROJECT MANAGEMENT; STRUCTURAL ANALYSIS;

EID: 33745311973     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2006)132:7(667)     Document Type: Article
Times cited : (249)

References (23)
  • 1
    • 0032072617 scopus 로고    scopus 로고
    • Factors of nonexcusable delays that influence contractors' performance
    • Abd. Majid, M. Z., and McCaffer, R. (1998). " Factors of nonexcusable delays that influence contractors' performance.. " J. Manage. Eng., 14 (3), 42-49.
    • (1998) J. Manage. Eng. , vol.14 , Issue.3 , pp. 42-49
    • Abd. Majid, M.Z.1    McCaffer, R.2
  • 4
    • 4143113321 scopus 로고    scopus 로고
    • Important causes of delays in public utility projects in Saudi Arabia
    • Al-Khalil, M. I., and Al-Ghafly, M. A. (1999). " Important causes of delays in public utility projects in Saudi Arabia.. " Constr. Manage. Econom., 17 (5), 641-655.
    • (1999) Constr. Manage. Econom. , vol.17 , Issue.5 , pp. 641-655
    • Al-Khalil, M.I.1    Al-Ghafly, M.A.2
  • 5
    • 84927635730 scopus 로고
    • Causes of delay in large building construction projects
    • Assaf, S. A., Mohammed, A.-K., and Muhammad, A.-H. (1995). " Causes of delay in large building construction projects.. " J. Manage. Eng., 11 (2), 45-50.
    • (1995) J. Manage. Eng. , vol.11 , Issue.2 , pp. 45-50
    • Assaf, S.A.1    Mohammed, A.-K.2    Muhammad, A.-H.3
  • 6
    • 0001164228 scopus 로고    scopus 로고
    • A methodology for assessing construction project delays
    • Bordoli, D. W., and Baldwin, A. N. (1998). " A methodology for assessing construction project delays.. " Constr. Manage. Econom., 16 (3), 327-337.
    • (1998) Constr. Manage. Econom. , vol.16 , Issue.3 , pp. 327-337
    • Bordoli, D.W.1    Baldwin, A.N.2
  • 8
    • 0031078243 scopus 로고    scopus 로고
    • A comparative study of causes of time overrun in Hong Kong construction projects
    • Chan, D. W. M., and Kumaraswamy, M. M. (1997). " A comparative study of causes of time overrun in Hong Kong construction projects.. " Int. J. Proj. Manage., 15 (1), 55-63.
    • (1997) Int. J. Proj. Manage. , vol.15 , Issue.1 , pp. 55-63
    • Chan, D.W.M.1    Kumaraswamy, M.M.2
  • 9
    • 0036162657 scopus 로고    scopus 로고
    • Reasons for cost and schedule increase for engineering design projects
    • Chang, A. S. (2002). " Reasons for cost and schedule increase for engineering design projects.. " J. Manage. Eng., 18 (1), 29-36.
    • (2002) J. Manage. Eng. , vol.18 , Issue.1 , pp. 29-36
    • Chang, A.S.1
  • 11
    • 0035454627 scopus 로고    scopus 로고
    • Time-overrun factors in Nigeria construction industry
    • Elinwa, A. U., and Joshua, M. (2001). " Time-overrun factors in Nigeria construction industry.. " J. Constr. Eng. Manage., 127 (5), 419-425.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.5 , pp. 419-425
    • Elinwa, A.U.1    Joshua, M.2
  • 12
    • 0006593925 scopus 로고    scopus 로고
    • Failure factors in the Nigerian construction industry
    • Elinwa, U., and Uba, A. S. (2001). " Failure factors in the Nigerian construction industry.. " Niger. J. Eng. Manage., 2 (1), 16-21.
    • (2001) Niger. J. Eng. Manage. , vol.2 , Issue.1 , pp. 16-21
    • Elinwa, U.1    Uba, A.S.2
  • 13
    • 11644320670 scopus 로고
    • Identification of cost significant items in tunneling projects
    • Hosny, A., and Abdel-Razek, R. H. (1991). " Identification of cost significant items in tunneling projects.. " Proc., Int. Symp. on Tunneling in Congested Cities, Ministry of Transport, National Authority for Tunnels, and Egyptian Society of Engineers, Cairo Egypt, 419-430.
    • (1991) Proc., Int. Symp. on Tunneling in Congested Cities , pp. 419-430
    • Hosny, A.1    Abdel-Razek, R.H.2
  • 15
    • 0039997969 scopus 로고    scopus 로고
    • Factors influencing construction time and cost overruns on high-rise projects in Indonesia
    • Kaming, P. F., Olomolaiye, P. O., Holt, G. D., and Harris, F. C. (1997). " Factors influencing construction time and cost overruns on high-rise projects in Indonesia.. " Constr. Manage. Econom., 15, 83-94.
    • (1997) Constr. Manage. Econom. , vol.15 , pp. 83-94
    • Kaming, P.F.1    Olomolaiye, P.O.2    Holt, G.D.3    Harris, F.C.4
  • 16
    • 0001798497 scopus 로고    scopus 로고
    • Contributors to construction delays
    • Kumaraswamy, M. M., and Chan, D. W. M. (1998). " Contributors to construction delays.. " Constr. Manage. Econom., 16 (1), 17-29.
    • (1998) Constr. Manage. Econom. , vol.16 , Issue.1 , pp. 17-29
    • Kumaraswamy, M.M.1    Chan, D.W.M.2
  • 17
    • 0004178374 scopus 로고
    • Her Majesty's Stationery Office, London, U.K.
    • Latham, M. (1994). Constructing the team, Her Majesty's Stationery Office, London, U.K.
    • (1994) Constructing the Team
    • Latham, M.1
  • 18
    • 0000725583 scopus 로고
    • Causes of delay and cost overruns in Nigerian construction projects
    • Mansfield, N. R., Ugwu, O. O., and Doran, T. (1994). " Causes of delay and cost overruns in Nigerian construction projects.. " Int. J. Proj. Manage., 12 (4), 254-260.
    • (1994) Int. J. Proj. Manage. , vol.12 , Issue.4 , pp. 254-260
    • Mansfield, N.R.1    Ugwu, O.O.2    Doran, T.3
  • 20
    • 0002733516 scopus 로고
    • Construction time influencing factors: The contractor's perspective
    • Nkado, R. N. (1995). " Construction time influencing factors: The contractor's perspective.. " Constr. Manage. Econom., 13, 81-89.
    • (1995) Constr. Manage. Econom. , vol.13 , pp. 81-89
    • Nkado, R.N.1
  • 21
    • 2142785483 scopus 로고    scopus 로고
    • The causes and effects of construction delays on completion cost of housing projects in Nigeria
    • Odeyinka, H. A., and Yusif, A. (1997). " The causes and effects of construction delays on completion cost of housing projects in Nigeria.. " J. Finan. Mange. Property Constr., 2 (3), 31-44.
    • (1997) J. Finan. Mange. Property Constr. , vol.2 , Issue.3 , pp. 31-44
    • Odeyinka, H.A.1    Yusif, A.2
  • 22
    • 0030074893 scopus 로고    scopus 로고
    • Construction delays in a fast-growing economy: Comparing Thailand with other economies
    • Ogunlana, S. O., Promkuntong, K., and Jearkjirm, V. (1996). " Construction delays in a fast-growing economy: Comparing Thailand with other economies.. " Int. J. Proj. Manage., 14 (1), 37-45.
    • (1996) Int. J. Proj. Manage. , vol.14 , Issue.1 , pp. 37-45
    • Ogunlana, S.O.1    Promkuntong, K.2    Jearkjirm, V.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.