-
1
-
-
30844441627
-
Delay mitigation in the Malaysian construction industry
-
".
-
Abdul-Rahman, H., Berawi, M. A., Berawi, A. R., Mohamed, O., Othman, M., and Yahya, I. A. (2006). " Delay mitigation in the Malaysian construction industry.." J. Constr. Eng. Manage., 132 (2), 125-133.
-
(2006)
J. Constr. Eng. Manage.
, vol.132
, Issue.2
, pp. 125-133
-
-
Abdul-Rahman, H.1
Berawi, M.A.2
Berawi, A.R.3
Mohamed, O.4
Othman, M.5
Yahya, I.A.6
-
3
-
-
27644463257
-
Delays in construction: A brief study of the Florida construction industry
-
", Clemson Univ., Clemson, S.C..
-
Ahmed, S. M., Azhar, S., Kappagantula, P., and Gollapudi, D. (2003). " Delays in construction: A brief study of the Florida construction industry.." ASC Proc., 39th Annual Conf., Clemson Univ., Clemson, S.C., 257-266.
-
(2003)
ASC Proc., 39th Annual Conf.
, pp. 257-266
-
-
Ahmed, S.M.1
Azhar, S.2
Kappagantula, P.3
Gollapudi, D.4
-
4
-
-
54249110189
-
Identifying the important causes of delays in building construction projects
-
Bali, Indonesia, Institut Teknologi Bandung, Nusa Dua, Bali, Indonesia.
-
Alwi, S., and Hampson, K. (2003). " Identifying the important causes of delays in building construction projects.." Proc., 9th East Asia-Pacific Conf. on Structural Engineering and Construction, Bali, Indonesia, Institut Teknologi Bandung, Nusa Dua, Bali, Indonesia.
-
(2003)
Proc., 9th East Asia-Pacific Conf. on Structural Engineering and Construction
-
-
Alwi, S.1
Hampson, K.2
-
6
-
-
33645965860
-
Causes of delay in large construction projects
-
Assaf, S. A., and Al-Hejji, S. (2006). " Causes of delay in large construction projects.." Int. J. Proj. Manage., 24 (4), 349-357.
-
(2006)
Int. J. Proj. Manage.
, vol.24
, Issue.4
, pp. 349-357
-
-
Assaf, S.A.1
Al-Hejji, S.2
-
7
-
-
84927635730
-
Causes of delay in large building construction projects
-
".
-
Assaf, S. A., Al-Khalil, M., and Al-Hazmi, M. (1995). " Causes of delay in large building construction projects.." J. Manage. Eng., 11 (2), 45-50.
-
(1995)
J. Manage. Eng.
, vol.11
, Issue.2
, pp. 45-50
-
-
Assaf, S.A.1
Al-Khalil, M.2
Al-Hazmi, M.3
-
8
-
-
0003854909
-
-
2nd Ed., Chapman and Hall/CRC Press, Boca Raton, Fla.
-
Ayyub, B. A., and McCuen, R. H. (1997). Probability, statistics and reliability for engineers, 2nd Ed., Chapman and Hall/CRC Press, Boca Raton, Fla.
-
(1997)
Probability, Statistics and Reliability for Engineers
-
-
Ayyub, B.A.1
McCuen, R.H.2
-
9
-
-
0015159159
-
Causes of delay in the construction industry
-
" ().
-
Baldwin, J. R., Manthei, J. M., Rothbart, H., and Harris, R. B. (1971). " Causes of delay in the construction industry.." J. Constr. Div. 97 (2), 177-187.
-
(1971)
J. Constr. Div.
, vol.97
, Issue.2
, pp. 177-187
-
-
Baldwin, J.R.1
Manthei, J.M.2
Rothbart, H.3
Harris, R.B.4
-
10
-
-
54249157726
-
Correlates of time overrun in commercial construction
-
Brigham Young Univ., Provo, Utah.
-
Choudhury, I., and Phatak, O. (2004). " Correlates of time overrun in commercial construction.." ASC Proc., 40th Annual Conf., Brigham Young Univ., Provo, Utah.
-
(2004)
ASC Proc., 40th Annual Conf.
-
-
Choudhury, I.1
Phatak, O.2
-
11
-
-
33646698557
-
How many interviews are enough? An experiment with data saturation and variability.
-
Guest, G., Bunce, A., and Johnsons, L. (2006). " How many interviews are enough? An experiment with data saturation and variability.. " Field Methods, 18 (1), 59-82.
-
(2006)
Field Methods
, vol.18
, Issue.1
, pp. 59-82
-
-
Guest, G.1
Bunce, A.2
Johnsons, L.3
-
12
-
-
0000725583
-
Causes of delay and cost over runs in Nigerian construction projects
-
".
-
Mansfield, N. R., Ugwu, O. O., and Doran, T. (1994). " Causes of delay and cost over runs in Nigerian construction projects.." Int. J. Proj. Manage., 12 (4), 254-260.
-
(1994)
Int. J. Proj. Manage.
, vol.12
, Issue.4
, pp. 254-260
-
-
Mansfield, N.R.1
Ugwu, O.O.2
Doran, T.3
-
13
-
-
54249144265
-
Consultations in stumble of large projects
-
(in Arabic).
-
Mobarak, M. S. (2004). " Consultations in stumble of large projects.." World Econ., 146, 96 (in Arabic).
-
(2004)
World Econ.
, vol.146
, pp. 96
-
-
Mobarak, M.S.1
-
14
-
-
68649120629
-
-
Noulmanee, A., Wachirathamrojn, J., Tantichattanont, P., and Sittivijan, P. (2000). " Internal cause of delay in highway construction project in Thailand.." 〈 http://www.languages.ait.ac.th/talkbasework/july99/ construction.htm 〉.
-
(2000)
Internal Cause of Delay in Highway Construction Project in Thailand
-
-
Noulmanee, A.1
Wachirathamrojn, J.2
Tantichattanont, P.3
Sittivijan, P.4
-
15
-
-
54249132398
-
Schedule delay analysis; Is there agreement?
-
〈〉, May 7-9, 2003, Project Management Institute-College of Performance Management, New Orleans.
-
Zack, J. G., (2003). " Schedule delay analysis; is there agreement? " Proc., PMI-CPM College of Performance Spring Conf. 〈 http://www.pmi-cpm.org/public/news_events/2003_spring_conf/index.html 〉, May 7-9, 2003, Project Management Institute-College of Performance Management, New Orleans.
-
(2003)
Proc., PMI-CPM College of Performance Spring Conf.
-
-
Zack, J.G.1
|