메뉴 건너뛰기




Volumn 27, Issue 1, 2009, Pages 3-23

Causes of delays in Saudi Arabian public sector construction projects

Author keywords

Delays; Public sector; Saudi Arabia; Survey

Indexed keywords

CONTRACTORS; PERSONNEL; PLASTICS MOLDING; SURVEYS;

EID: 61649124532     PISSN: 01446193     EISSN: 1466433X     Source Type: Journal    
DOI: 10.1080/01446190802541457     Document Type: Article
Times cited : (204)

References (36)
  • 8
    • 0035313974 scopus 로고    scopus 로고
    • A change management model for Saudi construction industry
    • Al-Sedairy, S. T. (2001) A change management model for Saudi construction industry. International Journal of Project Management, 19:3, pp. 161-169.
    • (2001) International Journal of Project Management , vol.19 , Issue.3 , pp. 161-169
    • Al-Sedairy, S.T.1
  • 9
    • 61649099967 scopus 로고
    • Al-Subaie
    • Al-Subaie (1987)
    • (1987)
  • 11
    • 30844454677 scopus 로고    scopus 로고
    • Constructors' views of potential causes of inconsistencies between design and construction in Saudi Arabia
    • Arain, F. M., Pheng, L. S. and Assaf, S. (2006) Constructors' views of potential causes of inconsistencies between design and construction in Saudi Arabia. Performance of Constructed Facilities, 20:1, pp. 74-83.
    • (2006) Performance of Constructed Facilities , vol.20 , Issue.1 , pp. 74-83
    • Arain, F.M.1    Pheng, L.S.2    Assaf, S.3
  • 13
    • 61649106641 scopus 로고    scopus 로고
    • Causes of delay in large building construction projects
    • Assaf, S. A. and Mohammed, A. (1996) Causes of delay in large building construction projects. Journal of Management in Engineering, 11:2, pp. 27-55.
    • (1996) Journal of Management in Engineering , vol.11 , Issue.2 , pp. 27-55
    • Assaf, S.A.1    Mohammed, A.2
  • 17
    • 42149096560 scopus 로고    scopus 로고
    • Applicability in Hong Kong of London's experiences on urban redevelopment practices
    • Chan, E. H. W. and Lee, G. K. L. (2008) Applicability in Hong Kong of London's experiences on urban redevelopment practices. Property Management, 26:2, pp. 125-137.
    • (2008) Property Management , vol.26 , Issue.2 , pp. 125-137
    • Chan, E.H.W.1    Lee, G.K.L.2
  • 18
    • 0025512036 scopus 로고
    • Two moments estimation of the delay on single-track rail lines with scheduled traffic
    • Chen, B. and Harker, P. (1990) Two moments estimation of the delay on single-track rail lines with scheduled traffic. Transportation Science, 24, pp. 261-275.
    • (1990) Transportation Science , vol.24 , pp. 261-275
    • Chen, B.1    Harker, P.2
  • 22
    • 19644383153 scopus 로고    scopus 로고
    • Delay management in core-stateless networks
    • Dumitrescu, A. and Harju, J. (2004) Delay management in core-stateless networks. Proceedings of NEW2AN, pp. 156-160.
    • (2004) Proceedings of NEW2AN , pp. 156-160
    • Dumitrescu, A.1    Harju, J.2
  • 24
    • 33751295266 scopus 로고    scopus 로고
    • Significant factors causing delay in the UAE construction industry
    • Faridi, A. S. and El-Sayegh, S. M. (2006) Significant factors causing delay in the UAE construction industry. Construction Management and Economics, 14, pp. 1167-1176.
    • (2006) Construction Management and Economics , vol.14 , pp. 1167-1176
    • Faridi, A.S.1    El-Sayegh, S.M.2
  • 26
    • 0010939756 scopus 로고
    • Market growth as influenced by capital investment
    • Forrester, J. W. (1967) Market growth as influenced by capital investment.
    • (1967)
    • Forrester, J.W.1
  • 27
    • 0032206316 scopus 로고    scopus 로고
    • Modeling train delays in urban networks
    • Higgins, A. and Kozan, E. (1998) Modeling train delays in urban networks. Transportation Science, 32, pp. 346-357.
    • (1998) Transportation Science , vol.32 , pp. 346-357
    • Higgins, A.1    Kozan, E.2
  • 28
    • 33646180126 scopus 로고    scopus 로고
    • Contributions of designers to improving buildability and constructability
    • Lam, P. T. I., Wong, F. W. H. and Chan, A. P. C. (2006) Contributions of designers to improving buildability and constructability. Design Studies, 27:4, pp. 457-479.
    • (2006) Design Studies , vol.27 , Issue.4 , pp. 457-479
    • Lam, P.T.I.1    Wong, F.W.H.2    Chan, A.P.C.3
  • 33
    • 34248402903 scopus 로고    scopus 로고
    • Causes and effects of delays in Malaysian construction industry
    • Sambasivan, M. and Soon, Y. W. (2007) Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25, pp. 517-526.
    • (2007) International Journal of Project Management , vol.25 , pp. 517-526
    • Sambasivan, M.1    Soon, Y.W.2
  • 34
    • 18944406568 scopus 로고    scopus 로고
    • A model for the delay management problem based on mixed integer programming
    • Schobel, A. (2001) A model for the delay management problem based on mixed integer programming. Electronic Notes in Theoretical Computer Science, 50:1
    • (2001) Electronic Notes in Theoretical Computer Science , vol.50 , Issue.1
    • Schobel, A.1
  • 35
    • 33744476937 scopus 로고
    • About the effect of delay penalty on the construction of projects and modification proposal
    • Zain Al-Abidien, H. M. (1983) About the effect of delay penalty on the construction of projects and modification proposal.
    • (1983)
    • Zain Al-Abidien, H.M.1
  • 36
    • 42049119234 scopus 로고    scopus 로고
    • The impacts of change management practices on project change cost performance
    • Zou, Y. and Lee, S. -H. (2008) The impacts of change management practices on project change cost performance. Construction Management and Economics, 26:4, pp. 387-393.
    • (2008) Construction Management and Economics , vol.26 , Issue.4 , pp. 387-393
    • Zou, Y.1    Lee, S.-H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.