Volumn 27, Issue 12, 2009, Pages 1245-1263

Analysis of pre-qualification criteria in contractor selection and their impacts on project success

Author keywords

Contractor selection; Factor analysis; Pre qualification; Project performance; Regression modelling

Indexed keywords

CONTRACTOR SELECTION; FACTOR ANALYSIS; PRE-QUALIFICATION; PROJECT PERFORMANCE; REGRESSION MODELLING;

EID: 77449117316     PISSN: 01446193     EISSN: 1466433X     Source Type: Journal    
DOI: 10.1080/01446190903394541     Document Type: Article
Times cited : (126)

References (33)
  • 1
    • 57749119817 scopus 로고    scopus 로고
    • The accuracy of pre-tender building cost estimates in Australia
    • Aibinu, A. and Pasco, T. (2008) The accuracy of pre-tender building cost estimates in Australia. Construction Manage- ment and Economics, 26(12), 1257-69.
    • (2008) Construction Manage- Ment and Economics , vol.26 , Issue.12 , pp. 1257-1269
    • Aibinu, A.1    Pasco, T.2
  • 4
    • 0031078243 scopus 로고    scopus 로고
    • A comparative study of causes of time overruns in Hong Kong construction projects
    • Chan, D.W.M. and Kumaraswamy, M.M. (1997) A comparative study of causes of time overruns in Hong Kong construction projects. International Journal of Project Management, 15(1), 55-63.
    • (1997) International Journal of Project Management , vol.15 , Issue.1 , pp. 55-63
    • Chan, D.W.M.1    Kumaraswamy, M.M.2
  • 5
    • 11944249373 scopus 로고    scopus 로고
    • Contractor selection using the analytic network process
    • Cheng, E.W.L. and Li, H. (2004) Contractor selection using the analytic network process. Construction Management and Economics, 22, 1021-32.
    • (2004) Construction Management and Economics , vol.22 , pp. 1021-1032
    • Cheng, E.W.L.1    Li, H.2
  • 6
    • 57449104522 scopus 로고    scopus 로고
    • Analysing the novated design and construct contract from the client's, design team's and contractor's perspectives
    • Doloi, H. (2008) Analysing the novated design and construct contract from the client's, design team's and contractor's perspectives. Construction Management and Economics, 26, 1181-96.
    • (2008) Construction Management and Economics , vol.26 , pp. 1181-1196
    • Doloi, H.1
  • 8
    • 0001119781 scopus 로고    scopus 로고
    • Final contractor selection using the analytical hierarchy process
    • Fong, P.S.-W. and Choi, S.K.-Y. (2000) Final contractor selection using the analytical hierarchy process. Construction Management and Economics, 18, 547-57.
    • (2000) Construction Management and Economics , vol.18 , pp. 547-557
    • Fong, P.S.-W.1    Choi, S.K.-Y.2
  • 9
    • 0005666767 scopus 로고    scopus 로고
    • Subcontractor procurement: Are relationships changing?
    • Greenwood, D. (2001) Subcontractor procurement: are relationships changing? Construction Management and Economics, 19, 5-7.
    • (2001) Construction Management and Economics , vol.19 , pp. 5-7
    • Greenwood, D.1
  • 10
    • 0000942012 scopus 로고    scopus 로고
    • Evaluating contractor prequalification data: Selection criteria and project success factors
    • Hatush, Z. and Skitmore, M. (1997) Evaluating contractor prequalification data: selection criteria and project success factors. Construction Management and Economics, 15, 129-47.
    • (1997) Construction Management and Economics , vol.15 , pp. 129-147
    • Hatush, Z.1    Skitmore, M.2
  • 12
    • 0013229112 scopus 로고
    • A review of contractor selection practice in the UK construction industry
    • Holt, G.D., Olomolaiye, P.O. and Harris, F.C. (1995) A review of contractor selection practice in the UK construction industry. Building and Environment, 30, 553-61.
    • (1995) Building and Environment , vol.30 , pp. 553-561
    • Holt, G.D.1    Olomolaiye, P.O.2    Harris, F.C.3
  • 13
    • 15744362051 scopus 로고    scopus 로고
    • Structural equation model for project planning effectiveness
    • Islam, M.D. and Faniran, O.O. (2005) Structural equation model for project planning effectiveness. Construction Management and Economics, 23, 215-23.
    • (2005) Construction Management and Economics , vol.23 , pp. 215-223
    • Islam, M.D.1    Faniran, O.O.2
  • 14
    • 57649229436 scopus 로고    scopus 로고
    • Housing refurbishment contractors selection based on a hybrid fuzzy-QFD approach
    • Juan, Y.K., Perng, Y.H., Catro-Lacouture, D. and Lu, K.S. (2009) Housing refurbishment contractors selection based on a hybrid fuzzy-QFD approach. Automation in Construction, 18, 139-44.
    • (2009) Automation In Construction , vol.18 , pp. 139-144
    • Juan, Y.K.1    Perng, Y.H.2    Catro-Lacouture, D.3    Lu, K.S.4
  • 16
    • 59249106913 scopus 로고    scopus 로고
    • A support vector machine model for contractor prequalification
    • Lam, K.C., Palaneeswaran, E. and Yu, C. (2009) A support vector machine model for contractor prequalification. Automation in Construction, 18 (3), 321-9.
    • (2009) Automation In Construction , vol.18 , Issue.3 , pp. 321-329
    • Lam, K.C.1    Palaneeswaran, E.2    Yu, C.3
  • 20
  • 21
    • 43049101104 scopus 로고    scopus 로고
    • Conceptual framework for the assessment of subcontractors' eligibility and performance in the construction industry
    • Mbachu, J. (2008) Conceptual framework for the assessment of subcontractors' eligibility and performance in the construction industry. Construction Management and Economics, 26, 471-84.
    • (2008) Construction Management and Economics , vol.26 , pp. 471-484
    • Mbachu, J.1
  • 22
    • 43849088353 scopus 로고    scopus 로고
    • Modelling subcontractor registration decisions through case-based reasoning approach
    • Ng, S.T. and Luu, C.D.T. (2008) Modelling subcontractor registration decisions through case-based reasoning approach. Automation in Construction, 17, 873-81.
    • (2008) Automation In Construction , vol.17 , pp. 873-881
    • Ng, S.T.1    Luu, C.D.T.2
  • 23
    • 0037603787 scopus 로고    scopus 로고
    • A model for subcontractor selection in refurbishment projects
    • Okoroh, M.I. and Torrance, V.B. (1999) A model for subcontractor selection in refurbishment projects. Construction Management and Economics, 17, 315-27.
    • (1999) Construction Management and Economics , vol.17 , pp. 315-327
    • Okoroh, M.I.1    Torrance, V.B.2
  • 25
    • 0344032254 scopus 로고    scopus 로고
    • TebSeM: A multicrite- ria and multidecision makers' model in tender evaluation
    • Pongpeng, J. and Liston, J. (2003) TebSeM: a multicrite- ria and multidecision makers' model in tender evaluation. Construction Management and Economics, 21 (1), 21-30.
    • (2003) Construction Management and Economics , vol.21 , Issue.1 , pp. 21-30
    • Pongpeng, J.1    Liston, J.2
  • 26
    • 57449102772 scopus 로고    scopus 로고
    • Perceptions of architectural design and project risk: Understanding the architects' role in a PPP project
    • Raisbeck, P. (2008) Perceptions of architectural design and project risk: understanding the architects' role in a PPP project. Construction Management and Economics, 26(11), 1145-57.
    • (2008) Construction Management and Economics , vol.26 , Issue.11 , pp. 1145-1157
    • Raisbeck, P.1
  • 28
    • 33748139457 scopus 로고    scopus 로고
    • An economic game theory model of subcontractor resource allocation behaviour
    • Sacks, R. and Harel, M. (2006) An economic game theory model of subcontractor resource allocation behaviour. Construction Management and Economics, 24, 869-81.
    • (2006) Construction Management and Economics , vol.24 , pp. 869-881
    • Sacks, R.1    Harel, M.2
  • 29
    • 33747347789 scopus 로고    scopus 로고
    • Contractor selection criteria: Investigation of opinions of Singapore construction practitioners
    • Singh, D. and Tiong, R.L.K. (2006) Contractor selection criteria: investigation of opinions of Singapore construction practitioners. Journal of Construction Engineering and Management, 132, 998-1008.
    • (2006) Journal of Construction Engineering and Management , vol.132 , pp. 998-1008
    • Singh, D.1    Tiong, R.L.K.2
  • 30
  • 33
    • 26644443645 scopus 로고    scopus 로고
    • Concessionaire's financial capability in developing build-operate-transfer type infrastructure projects
    • Zhang, X. (2005) Concessionaire's financial capability in developing build-operate-transfer type infrastructure projects. Journal of Construction Engineering and Management, 131, 1054-64.
    • (2005) Journal of Construction Engineering and Management , vol.131 , pp. 1054-1064
    • Zhang, X.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.