Volumn 50, Issue 20, 2012, Pages 5906-5925

A reliability/availability approach to joint production and maintenance scheduling with multiple preventive maintenance services

Author keywords

multiple repair rates; population based variable neighbourhood search; preventive maintenance; production scheduling; reliability availability approach

Indexed keywords

BASIC VARIABLES; COMPUTATIONAL STUDIES; JOINT PRODUCTION; LOCAL SEARCH; MAINTENANCE SCHEDULING; MIXED INTEGER NONLINEAR PROGRAMMING MODELS; NUMBER OF ITERATIONS; PLANNING HORIZONS; PRODUCTION SCHEDULING; REALISTIC ENVIRONMENTS; REPAIR RATE; SCHEDULING PROBLEM; SOLUTION METHODS; VARIABLE NEIGHBOURHOOD SEARCH;

EID: 84867340592     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2011.637092     Document Type: Article
Times cited : (41)

References (51)
  • 1
    • 27644520542 scopus 로고    scopus 로고
    • Flow shop scheduling problem with limited machine availability: A heuristic approach
    • Aggoune, R. and Portmann, M., 2006. Flow shop scheduling problem with limited machine availability: A heuristic approach. International Journal of Production Economics, 99 (1-2), 4-15.
    • (2006) International Journal of Production Economics , vol.99 , Issue.1-2 , pp. 4-15
    • Aggoune, R.1    Portmann, M.2
  • 2
    • 0242658501 scopus 로고    scopus 로고
    • Minimizing the makespan for the flow shop scheduling problem with availability constraints
    • Aggoune, R., 2003. Minimizing the makespan for the flow shop scheduling problem with availability constraints. European Journal of Operational Research, 153 (3), 534-543.
    • (2003) European Journal of Operational Research , vol.153 , Issue.3 , pp. 534-543
    • Aggoune, R.1
  • 3
    • 27644529000 scopus 로고    scopus 로고
    • Scheduling of a two machine flowshop with availability constraints on the first machine
    • Allaoui, A., et al., 2006. Scheduling of a two machine flowshop with availability constraints on the first machine. International Journal of Production Economics, 99 (1-2), 16-27.
    • (2006) International Journal of Production Economics , vol.99 , Issue.1-2 , pp. 16-27
    • Allaoui, A.1
  • 5
    • 0001096735 scopus 로고
    • Genetic algorithm and random keys for sequencing and optimization
    • Bean, J.C., 1994. Genetic algorithm and random keys for sequencing and optimization. ORSA Journal on Computing, 6 (6), 154-160.
    • (1994) ORSA Journal on Computing , vol.6 , Issue.6 , pp. 154-160
    • Bean, J.C.1
  • 6
    • 67749116576 scopus 로고    scopus 로고
    • Bi-objective optimization algorithms for joint production and maintenance scheduling: Application to the parallel machine problem
    • Berrichi, A., et al., 2008. Bi-objective optimization algorithms for joint production and maintenance scheduling: Application to the parallel machine problem. Journal of Intelligent Manufacturing, 20 (4), 389-400.
    • (2008) Journal of Intelligent Manufacturing , vol.20 , Issue.4 , pp. 389-400
    • Berrichi, A.1
  • 7
    • 75449112582 scopus 로고    scopus 로고
    • Bi-objective ant colony optimisation approach to optimize production and maintenance scheduling
    • Berrichi, A., et al., 2010. Bi-objective ant colony optimisation approach to optimize production and maintenance scheduling. Computers & Operations Research, 37 (9), 1584-1596.
    • (2010) Computers & Operations Research , vol.37 , Issue.9 , pp. 1584-1596
    • Berrichi, A.1
  • 8
    • 79957490775 scopus 로고    scopus 로고
    • Simultaneous scheduling of production and maintenance tasks in the job shop
    • Ben Ali, M., et al., 2011. Simultaneous scheduling of production and maintenance tasks in the job shop. International Journal of Production Research, 49 (13), 3891-3918.
    • (2011) International Journal of Production Research , vol.49 , Issue.13 , pp. 3891-3918
    • Ben Ali, M.1
  • 9
    • 0000693192 scopus 로고    scopus 로고
    • Heuristic algorithms for the two-machine flowshop problem with limited machine availability
    • Blazewicz, J., et al., 2001. Heuristic algorithms for the two-machine flowshop problem with limited machine availability. Omega Journal, 29 (6), 599-608.
    • (2001) Omega Journal , vol.29 , Issue.6 , pp. 599-608
    • Blazewicz, J.1
  • 10
    • 0038580606 scopus 로고    scopus 로고
    • Approximability of two-machine no-wait flowshop scheduling with availability constraints
    • Cheng, T. and Liu, Z., 2003. Approximability of two-machine no-wait flowshop scheduling with availability constraints. Operations Research Letters, 31 (4), 319-322.
    • (2003) Operations Research Letters , vol.31 , Issue.4 , pp. 319-322
    • Cheng, T.1    Liu, Z.2
  • 11
    • 79958031546 scopus 로고    scopus 로고
    • Variable neighborhood search approaches for scheduling jobs on parallel machines with sequence-dependent setup times, precedence constraints, and ready times
    • Driessel, R. and Monch, L., 2011. Variable neighborhood search approaches for scheduling jobs on parallel machines with sequence-dependent setup times, precedence constraints, and ready times. Computers and Industrial Engineering, 61 (2), 336-345.
    • (2011) Computers and Industrial Engineering , vol.61 , Issue.2 , pp. 336-345
    • Driessel, R.1    Monch, L.2
  • 13
    • 0034824836 scopus 로고    scopus 로고
    • Complexity results and approximation algorithms for the two-machine no-wait flow-shop with limited machine availability
    • Espinouse, M., Formanowlcz, P., and Penz, B., 2001. Complexity results and approximation algorithms for the two-machine no-wait flow-shop with limited machine availability. Journal of the Operational Research Society, 52 (1), 116-121.
    • (2001) Journal of the Operational Research Society , vol.52 , Issue.1 , pp. 116-121
    • Espinouse, M.1    Formanowlcz, P.2    Penz, B.3
  • 16
    • 79951836022 scopus 로고    scopus 로고
    • A genetic algorithm for lot sizing and scheduling under capacity constraints and allowing backorders
    • Goncalves, J.F. and Sousa, P.S.A., 2011. A genetic algorithm for lot sizing and scheduling under capacity constraints and allowing backorders. International Journal of Production Research, 49 (9), 2683-2703.
    • (2011) International Journal of Production Research , vol.49 , Issue.9 , pp. 2683-2703
    • Goncalves, J.F.1    Sousa, P.S.A.2
  • 17
    • 79960511352 scopus 로고    scopus 로고
    • Genetic algorithm for job-shop scheduling with machine unavailability and breakdowns
    • Hasan, S.M.K., Sarker, R., and Essam, D., 2011. Genetic algorithm for job-shop scheduling with machine unavailability and breakdowns. International Journal of Production Research, 49 (16), 4999-5015.
    • (2011) International Journal of Production Research , vol.49 , Issue.16 , pp. 4999-5015
    • Hasan, S.M.K.1    Sarker, R.2    Essam, D.3
  • 18
    • 0242332842 scopus 로고    scopus 로고
    • Modelling and analysis of wafer fabrication scheduling via generalised stochastic Petri net and simulated annealing
    • Jain, V., Swarnkar, R., and Tiwari, M.K., 2003. Modelling and analysis of wafer fabrication scheduling via generalised stochastic Petri net and simulated annealing. International Journal of Production Research, 41 (15), 3501-3527.
    • (2003) International Journal of Production Research , vol.41 , Issue.15 , pp. 3501-3527
    • Jain, V.1    Swarnkar, R.2    Tiwari, M.K.3
  • 19
    • 33749681702 scopus 로고    scopus 로고
    • Single-machine scheduling with periodic maintenance to minimize makespan
    • Ji, M., He, Y., and Cheng, T.C.E., 2007. Single-machine scheduling with periodic maintenance to minimize makespan. Computers and Operations Research, 34 (6), 1764-1770.
    • (2007) Computers and Operations Research , vol.34 , Issue.6 , pp. 1764-1770
    • Ji, M.1    He, Y.2    Cheng, T.C.E.3
  • 20
    • 0036466573 scopus 로고    scopus 로고
    • Two-machine flow shops with limited machine availability
    • Kubiak, W., et al., 2002. Two-machine flow shops with limited machine availability. European Journal of Operational Research, 136 (3), 528-540.
    • (2002) European Journal of Operational Research , vol.136 , Issue.3 , pp. 528-540
    • Kubiak, W.1
  • 21
    • 38249005916 scopus 로고
    • Capacitated two-parallel machines scheduling to minimize sum of job completion times
    • Lee, C.Y. and Liman, S.D., 1993. Capacitated two-parallel machines scheduling to minimize sum of job completion times. Discrete Applied Mathematics, 41 (3), 211-222.
    • (1993) Discrete Applied Mathematics , vol.41 , Issue.3 , pp. 211-222
    • Lee, C.Y.1    Liman, S.D.2
  • 22
    • 0000541519 scopus 로고    scopus 로고
    • Machine scheduling with an availability constraint
    • Lee, C.Y., 1996. Machine scheduling with an availability constraint. Journal of Global Optimisation, 9 (3-4), 395-416.
    • (1996) Journal of Global Optimisation , vol.9 , Issue.3-4 , pp. 395-416
    • Lee, C.Y.1
  • 23
    • 0033116875 scopus 로고    scopus 로고
    • Two-machine flowshop scheduling with availability constraints
    • Lee, C.Y., 1999. Two-machine flowshop scheduling with availability constraints. European Journal of Operational Research, 114 (2), 420-429.
    • (1999) European Journal of Operational Research , vol.114 , Issue.2 , pp. 420-429
    • Lee, C.Y.1
  • 25
    • 0037411886 scopus 로고    scopus 로고
    • Single-machine scheduling with periodic maintenance and nonresumable jobs
    • Liao, C.-J. and Chen, W.J., 2003. Single-machine scheduling with periodic maintenance and nonresumable jobs. Computers & Operations Research, 30 (9), 1335-1347.
    • (2003) Computers & Operations Research , vol.30 , Issue.9 , pp. 1335-1347
    • Liao, C.-J.1    Chen, W.J.2
  • 26
    • 34248179019 scopus 로고    scopus 로고
    • A variable neighborhood search for minimising single machine weighted earliness and tardiness with common due date
    • Liao, C.-J. and Cheng, C.-C., 2007. A variable neighborhood search for minimising single machine weighted earliness and tardiness with common due date. Computers & Industrial Engineering, 52 (4), 404-413.
    • (2007) Computers & Industrial Engineering , vol.52 , Issue.4 , pp. 404-413
    • Liao, C.-J.1    Cheng, C.-C.2
  • 27
    • 4344570389 scopus 로고    scopus 로고
    • Makespan minimisation for two parallel machines with an availability constraint
    • Liao, C.-J., Shyur, D.-L., and Lin, C.-H., 2005. Makespan minimisation for two parallel machines with an availability constraint. European Journal of Operational Research, 160 (2), 445-456.
    • (2005) European Journal of Operational Research , vol.160 , Issue.2 , pp. 445-456
    • Liao, C.-J.1    Shyur, D.-L.2    Lin, C.-H.3
  • 28
    • 70349764553 scopus 로고    scopus 로고
    • Minimising the makespan in a single machine scheduling problems with flexible and periodic maintenance
    • Low, C., et al., 2010. Minimising the makespan in a single machine scheduling problems with flexible and periodic maintenance. Applied Mathematical Modeling, 34 (2), 334-342.
    • (2010) Applied Mathematical Modeling , vol.34 , Issue.2 , pp. 334-342
    • Low, C.1
  • 29
    • 76349087153 scopus 로고    scopus 로고
    • A survey of scheduling with deterministic machine availability constraints
    • Ma, Y., Chu, C., and Zuo, C., 2010. A survey of scheduling with deterministic machine availability constraints. Computers & Industrial Engineering, 58 (2), 199-211.
    • (2010) Computers & Industrial Engineering , vol.58 , Issue.2 , pp. 199-211
    • Ma, Y.1    Chu, C.2    Zuo, C.3
  • 30
    • 78049360678 scopus 로고    scopus 로고
    • Minimising the makespan in the non-preemptive job-shop scheduling with limited machine availability
    • Mati, Y., 2010. Minimising the makespan in the non-preemptive job-shop scheduling with limited machine availability. Computers & Industrial Engineering, 59 (4), 537-543.
    • (2010) Computers & Industrial Engineering , vol.59 , Issue.4 , pp. 537-543
    • Mati, Y.1
  • 33
    • 80051717728 scopus 로고    scopus 로고
    • A multi objective flow shop scheduling with resourcedependent processing times: Tradeoff between makespan and cost of resources
    • Mokhtari, H., Kamal Abadi, I.N., and Cheraghalikhani, A., 2011a. A multi objective flow shop scheduling with resourcedependent processing times: Tradeoff between makespan and cost of resources. International Journal of Production Research, 49 (19), 5851-5875.
    • (2011) International Journal of Production Research , vol.49 , Issue.19 , pp. 5851-5875
    • Mokhtari, H.1    Kamal Abadi, I.N.2    Cheraghalikhani, A.3
  • 34
    • 84867344748 scopus 로고    scopus 로고
    • Production scheduling with outsourcing scenarios: A mixed integer programming and efficient solution procedure
    • in press
    • Mokhtari, H., Kamal Abadi, I.N. and Amin-Naseri, M.R., 2011b. Production scheduling with outsourcing scenarios: A mixed integer programming and efficient solution procedure. International Journal of Production Research, in press.
    • (2011) International Journal of Production Research
    • Mokhtari, H.1    Kamal Abadi, I.N.2    Amin-Naseri, M.R.3
  • 35
    • 79951579853 scopus 로고    scopus 로고
    • Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem
    • Moradi, E., Fatemi Ghomi, S.M.T., and Zandieh, M., 2011. Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem. Expert Systems with Applications, 38 (6), 7169-7178.
    • (2011) Expert Systems with Applications , vol.38 , Issue.6 , pp. 7169-7178
    • Moradi, E.1    Fatemi Ghomi, S.M.T.2    Zandieh, M.3
  • 36
    • 78650170970 scopus 로고    scopus 로고
    • Minimizing the makespan and the system unavailability in parallel machine scheduling problem: A similarity-based genetic algorithm
    • Moradi, E. and Zandieh, M., 2010. Minimizing the makespan and the system unavailability in parallel machine scheduling problem: A similarity-based genetic algorithm. International Journal of Advanced Manufacturing Technology, 51 (5-8), 829-840.
    • (2010) International Journal of Advanced Manufacturing Technology , vol.51 , Issue.5-8 , pp. 829-840
    • Moradi, E.1    Zandieh, M.2
  • 37
    • 70450260889 scopus 로고    scopus 로고
    • A study on integrating sequence dependent setup time flexible flow lines and preventive maintenance scheduling
    • Naderi, B., Zandieh, M., and Fatemi Ghomi, S.M.T., 2009. A study on integrating sequence dependent setup time flexible flow lines and preventive maintenance scheduling. Journal of Intelligent Manufacturing, 20 (6), 683-694.
    • (2009) Journal of Intelligent Manufacturing , vol.20 , Issue.6 , pp. 683-694
    • Naderi, B.1    Zandieh, M.2    Fatemi Ghomi, S.M.T.3
  • 38
    • 78649467567 scopus 로고    scopus 로고
    • A genetic algorithm for simultaneous optimization of lot sizing and scheduling in a flow line assembly
    • Palaniappan, P.K. and Jawahar, N., 2011. A genetic algorithm for simultaneous optimization of lot sizing and scheduling in a flow line assembly. International Journal of Production Research, 49 (2), 375-400.
    • (2011) International Journal of Production Research , vol.49 , Issue.2 , pp. 375-400
    • Palaniappan, P.K.1    Jawahar, N.2
  • 39
    • 0041520978 scopus 로고    scopus 로고
    • Variable neighborhood tabu search and its application to the median cycle problem
    • Perez, J.A.M., Vega, J.M.M., and Martin, I.R., 2003. Variable neighborhood tabu search and its application to the median cycle problem. European Journal of Operational Research, 151 (2), 365-378.
    • (2003) European Journal of Operational Research , vol.151 , Issue.2 , pp. 365-378
    • Perez, J.A.M.1    Vega, J.M.M.2    Martin, I.R.3
  • 40
    • 74549114223 scopus 로고    scopus 로고
    • Scheduling flexible manufacturing cells using tabu search
    • Pitts, R.A. and Ventura, J.A., 2009. Scheduling flexible manufacturing cells using Tabu Search. International Journal of Production Research, 47 (24), 6907-6928.
    • (2009) International Journal of Production Research , vol.47 , Issue.24 , pp. 6907-6928
    • Pitts, R.A.1    Ventura, J.A.2
  • 41
    • 14844361815 scopus 로고    scopus 로고
    • A variable neighborhood search for the multi depot vehicle routing problem with time windows
    • Polacek, M., et al., 2004. A variable neighborhood search for the multi depot vehicle routing problem with time windows. Journal of Heuristics, 10 (6), 613-627.
    • (2004) Journal of Heuristics , vol.10 , Issue.6 , pp. 613-627
    • Polacek, M.1
  • 42
    • 69749108455 scopus 로고    scopus 로고
    • Robustness in operational research and decision aiding: A multi-faceted issue
    • Roy, B., 2010. Robustness in operational research and decision aiding: A multi-faceted issue. European Journal of Operational Research, 200 (3), 629-638.
    • (2010) European Journal of Operational Research , vol.200 , Issue.3 , pp. 629-638
    • Roy, B.1
  • 43
    • 34047122539 scopus 로고    scopus 로고
    • Considering scheduling and preventive maintenance in the flowshop sequencing problem
    • Ruiz, R., García-Díaz, J.C., and Maroto, C., 2007. Considering scheduling and preventive maintenance in the flowshop sequencing problem. Computers & Operations Research, 34 (11), 3314-3330.
    • (2007) Computers & Operations Research , vol.34 , Issue.11 , pp. 3314-3330
    • Ruiz, R.1    García-Díaz, J.C.2    Maroto, C.3
  • 44
    • 79955087599 scopus 로고    scopus 로고
    • Two meta-heuristics for parallel machine scheduling with job splitting to minimise total tardiness
    • Sarcicek, I. and Celik, C., 2011. Two meta-heuristics for parallel machine scheduling with job splitting to minimise total tardiness. Applied Mathematical Modelling, 35 (8).
    • (2011) Applied Mathematical Modelling , vol.35 , Issue.8
    • Sarcicek, I.1    Celik, C.2
  • 45
    • 74549198723 scopus 로고    scopus 로고
    • Ant colony optimisation with parameterized search space for the job shop scheduling problem
    • Seo, M. and Kim, D., 2010. Ant colony optimisation with parameterized search space for the job shop scheduling problem. International Journal of Production Research, 48 (4), 1143-1154.
    • (2010) International Journal of Production Research , vol.48 , Issue.4 , pp. 1143-1154
    • Seo, M.1    Kim, D.2
  • 46
    • 0343963100 scopus 로고    scopus 로고
    • Scheduling with limited machine availability
    • Schmidt, G., 2000. Scheduling with limited machine availability. European Journal of Operational Research, 121 (1), 1-15.
    • (2000) European Journal of Operational Research , vol.121 , Issue.1 , pp. 1-15
    • Schmidt, G.1
  • 47
    • 8644278747 scopus 로고    scopus 로고
    • A new multi-objective optimization method for master production scheduling problems using simulated annealing
    • Vieira, G.E. and Ribas, P.C., 2004. A new multi-objective optimization method for master production scheduling problems using simulated annealing. International Journal of Production Research, 42 (21), 4609-4622.
    • (2004) International Journal of Production Research , vol.42 , Issue.21 , pp. 4609-4622
    • Vieira, G.E.1    Ribas, P.C.2
  • 48
    • 56549092634 scopus 로고    scopus 로고
    • A population-based variable neighborhood search for the single machine total weighted tardiness problem
    • Wang, X. and Tang, L., 2009. A population-based variable neighborhood search for the single machine total weighted tardiness problem. Computers & Operations Research, 36 (6), 2105-2110.
    • (2009) Computers & Operations Research , vol.36 , Issue.6 , pp. 2105-2110
    • Wang, X.1    Tang, L.2
  • 49
    • 28844491706 scopus 로고    scopus 로고
    • Complexity and algorithms for two-stage flexible flowshop scheduling with availability constraints
    • Xie, J. and Wang, X., 2005. Complexity and algorithms for two-stage flexible flowshop scheduling with availability constraints. Computers and Mathematics with Applications, 50 (10-12), 1629-1638.
    • (2005) Computers and Mathematics with Applications , vol.50 , Issue.10-12 , pp. 1629-1638
    • Xie, J.1    Wang, X.2
  • 50
    • 34548655710 scopus 로고    scopus 로고
    • Parallel machine scheduling with almost periodic maintenance and non-preemptive jobs to minimise makespan
    • Xu, D., Sun, K., and Li, H., 2008. Parallel machine scheduling with almost periodic maintenance and non-preemptive jobs to minimise makespan. Computers & Operations Research, 35 (4), 1344-1349.
    • (2008) Computers & Operations Research , vol.35 , Issue.4 , pp. 1344-1349
    • Xu, D.1    Sun, K.2    Li, H.3
  • 51
    • 24644510199 scopus 로고    scopus 로고
    • Minimizing the makespan in a single machine scheduling problem with a flexible maintenance
    • Yang, D.L., et al., 2002. Minimizing the makespan in a single machine scheduling problem with a flexible maintenance. Journal of the Chinese Institute of Industrial Engineers, 19 (1), 63-66.
    • (2002) Journal of the Chinese Institute of Industrial Engineers , vol.19 , Issue.1 , pp. 63-66
    • Yang, D.L.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.