Volumn 20, Issue 6, 2009, Pages 683-694

A study on integrating sequence dependent setup time flexible flow lines and preventive maintenance scheduling

Author keywords

Flexible flow line; Preventive maintenance; Scheduling; Sequence dependent setup time; Variable neighborhood search

Indexed keywords

FLEXIBLE FLOW LINE; MACHINE SCHEDULING PROBLEM; MAKESPAN; META HEURISTICS; NEIGHBORHOOD SEARCH; OPTIMIZATION CRITERIA; OTHER ALGORITHMS; PREVENTIVE MAINTENANCE POLICIES; SEQUENCE-DEPENDENT SETUP TIME; VARIABLE NEIGHBORHOOD SEARCH;

EID: 70450260889     PISSN: 09565515     EISSN: 15728145     Source Type: Journal    
DOI: 10.1007/s10845-008-0157-6     Document Type: Article
Times cited : (42)

References (35)
  • 1
    • 0242658501 scopus 로고    scopus 로고
    • Minimizing the makespan for the flow shop scheduling problem with availability constraints
    • 10.1016/S0377-2217(03)00261-3 10.1016/S0377-2217(03)00261-3
    • R. Aggoune 2004 Minimizing the makespan for the flow shop scheduling problem with availability constraints European Journal of Operational Research 153 534 543 10.1016/S0377-2217(03)00261-3 10.1016/S0377-2217(03)00261-3
    • (2004) European Journal of Operational Research , vol.153 , pp. 534-543
    • Aggoune, R.1
  • 2
    • 0029343965 scopus 로고
    • Two-stage production scheduling with separated setup times and stochastic breakdowns
    • 10.2307/2583973
    • A. Allahverdi 1995 Two-stage production scheduling with separated setup times and stochastic breakdowns The Journal of the Operational Research Society 46 896 904 10.2307/2583973
    • (1995) The Journal of the Operational Research Society , vol.46 , pp. 896-904
    • Allahverdi, A.1
  • 3
    • 0031258858 scopus 로고    scopus 로고
    • Scheduling in stochastic flowshops with independent setup, processing and removal times
    • 10.1016/S0305-0548(97)00006-3 10.1016/S0305-0548(97)00006-3
    • A. Allahverdi 1997 Scheduling in stochastic flowshops with independent setup, processing and removal times Computers & Operations Research 24 955 960 10.1016/S0305-0548(97)00006-3 10.1016/S0305-0548(97)00006-3
    • (1997) Computers & Operations Research , vol.24 , pp. 955-960
    • Allahverdi, A.1
  • 4
    • 36849082395 scopus 로고    scopus 로고
    • A survey of scheduling problems with setup times or costs
    • DOI 10.1016/j.ejor.2006.06.060, PII S0377221706008174
    • A. Allahverdi C.T. Ng T.C.E. Cheng Y.M. Kovalyov 2008 A survey of scheduling problems with setup times or costs European Journal of Operational Research 187 3 985 1032 10.1016/j.ejor.2006.06.060 10.1016/j.ejor.2006.06.060 (Pubitemid 350236619)
    • (2008) European Journal of Operational Research , vol.187 , Issue.3 , pp. 985-1032
    • Allahverdi, A.1    Ng, C.T.2    Cheng, T.C.E.3    Kovalyov, M.Y.4
  • 5
    • 10444260511 scopus 로고    scopus 로고
    • Integrating simulation and optimization to schedule a hybrid flowshop with maintenance constraints
    • 10.1016/j.cie.2004.09.002 10.1016/j.cie.2004.09.002
    • H. Allaoui A. Artiba 2004 Integrating simulation and optimization to schedule a hybrid flowshop with maintenance constraints Computers & Industrial Engineering 47 431 450 10.1016/j.cie.2004.09.002 10.1016/j.cie.2004. 09.002
    • (2004) Computers & Industrial Engineering , vol.47 , pp. 431-450
    • Allaoui, H.1    Artiba, A.2
  • 6
    • 26444492122 scopus 로고    scopus 로고
    • Scheduling two-stage hybrid flow shop with availability constraints
    • DOI 10.1016/j.cor.2004.09.034, PII S0305054804002564
    • H. Allaoui A. Artiba 2006 Scheduling two-stage hybrid flow shop with availability constraints Computers & Operations Research 33 1399 1419 10.1016/j.cor.2004.09.034 10.1016/j.cor.2004.09.034 (Pubitemid 41428298)
    • (2006) Computers and Operations Research , vol.33 , Issue.5 , pp. 1399-1419
    • Allaoui, H.1    Artiba, A.2
  • 7
    • 0000693192 scopus 로고    scopus 로고
    • Heuristic algorithms for the two-machine flowshop with limited machine availability
    • DOI 10.1016/S0305-0483(01)00048-2, PII S0305048301000482
    • J. Blazewicz J. Breit P. Formanowicz W. Kubiak G. Schmidt 2001 Heuristic algorithms for the two-machine flowshop problem with limited machine availability Omega, 29 599 608 10.1016/S0305-0483(01)00048-2 10.1016/S0305-0483(01)00048-2 (Pubitemid 33628774)
    • (2001) Omega , vol.29 , Issue.6 , pp. 599-608
    • Blazewicz, J.1    Breit, J.2    Formanowicz, P.3    Kubiak, W.4    Schmidt, G.5
  • 8
    • 29144477260 scopus 로고    scopus 로고
    • A polynomial-time approximation scheme for the two-machine flowshop scheduling problem with an availability constraint
    • 10.1016/j.cor.2005.01.004 10.1016/j.cor.2005.01.004
    • J. Breit 2006 A polynomial-time approximation scheme for the two-machine flowshop scheduling problem with an availability constraint Computers & Operations Research 33 2143 2153 10.1016/j.cor.2005.01.004 10.1016/j.cor.2005. 01.004
    • (2006) Computers & Operations Research , vol.33 , pp. 2143-2153
    • Breit, J.1
  • 9
    • 0038813446 scopus 로고    scopus 로고
    • Minimizing job tardiness using integrated preventive maintenance planning and production scheduling
    • 10.1080/07408170304416 10.1080/07408170304416
    • C.R. Cassady E. Kutanoglu 2003 Minimizing job tardiness using integrated preventive maintenance planning and production scheduling IIE Transactions 35 6 503 513 10.1080/07408170304416 10.1080/07408170304416
    • (2003) IIE Transactions , vol.35 , Issue.6 , pp. 503-513
    • Cassady, C.R.1    Kutanoglu, E.2
  • 10
    • 1642436954 scopus 로고    scopus 로고
    • Solving the resource-constrained project scheduling problem by a variable neighborhood search
    • 10.1016/S0377-2217(02)00884-6 10.1016/S0377-2217(02)00884-6
    • K. Flesza K.S. Hindi 2004 Solving the resource-constrained project scheduling problem by a variable neighborhood search European Journal of Operational Research 155 402 413 10.1016/S0377-2217(02)00884-6 10.1016/S0377-2217(02)00884-6
    • (2004) European Journal of Operational Research , vol.155 , pp. 402-413
    • Flesza, K.1    Hindi, K.S.2
  • 11
    • 38749142590 scopus 로고    scopus 로고
    • A hybrid genetic and variable neighborhood descent algorithm for flexible job shop scheduling problems
    • DOI 10.1016/j.cor.2007.01.001, PII S0305054807000020
    • J. Gao L. Sun M. Gen 2008 A hybrid genetic and variable neighborhood descent algorithm for flexible job shop scheduling problems Computers & Operations Research 35 9 2892 2907 10.1016/j.cor.2007.01.001 10.1016/j.cor.2007.01.001 (Pubitemid 351186807)
    • (2008) Computers and Operations Research , vol.35 , Issue.9 , pp. 2892-2907
    • Gao, J.1    Sun, L.2    Gen, M.3
  • 13
    • 0022677934 scopus 로고
    • TWO-MACHINE SEQUENCE DEPENDENT FLOWSHOP SCHEDULING PROBLEM.
    • DOI 10.1016/0377-2217(86)90037-8
    • J.N.D. Gupta W.P. Darrow 1986 The two-machine sequence dependent flow shop scheduling problem. European Journal of Operational Research 24 3 439 446 10.1016/0377-2217(86)90037-8 10.1016/0377-2217(86)90037-8 (Pubitemid 16502445)
    • (1986) European Journal of Operational Research , vol.24 , Issue.3 , pp. 439-446
    • Gupta Jatinder, N.D.1    Darrow William, P.2
  • 14
    • 0003075019 scopus 로고
    • Optimal two and three-stage production schedules with setup times included
    • 10.1002/nav.3800010110 10.1002/nav.3800010110
    • S.M. Johnson 1954 Optimal two and three-stage production schedules with setup times included Naval Research Logistics Quarterly 1 61 67 10.1002/nav.3800010110 10.1002/nav.3800010110
    • (1954) Naval Research Logistics Quarterly , vol.1 , pp. 61-67
    • Johnson, S.M.1
  • 15
    • 0038486864 scopus 로고    scopus 로고
    • Comparing scheduling rules for flexible flow lines
    • 10.1016/S0925-5273(03)00123-3 10.1016/S0925-5273(03)00123-3
    • M.E. Kurz R.G. Askin 2003 Comparing scheduling rules for flexible flow lines International Journal of Production Economics 85 371 388 10.1016/S0925-5273(03)00123-3 10.1016/S0925-5273(03)00123-3
    • (2003) International Journal of Production Economics , vol.85 , pp. 371-388
    • Kurz, M.E.1    Askin, R.G.2
  • 16
    • 2942674864 scopus 로고    scopus 로고
    • Scheduling flexible flow lines with sequence-dependent setup times
    • 10.1016/S0377-2217(03)00401-6 10.1016/S0377-2217(03)00401-6
    • M.E. Kurz R.G. Askin 2004 Scheduling flexible flow lines with sequence-dependent setup times European Journal of Operational Research 159 1 66 82 10.1016/S0377-2217(03)00401-6 10.1016/S0377-2217(03)00401-6
    • (2004) European Journal of Operational Research , vol.159 , Issue.1 , pp. 66-82
    • Kurz, M.E.1    Askin, R.G.2
  • 17
    • 0000049036 scopus 로고    scopus 로고
    • Minimizing the makespan in the two-machine flow-shop scheduling problem with an availability constraint
    • 10.1016/S0167-6377(96)00041-7 10.1016/S0167-6377(96)00041-7
    • C.Y. Lee 1997 Minimizing the makespan in the two-machine flow-shop scheduling problem with an availability constraint Operations Research Letters 20 129 139 10.1016/S0167-6377(96)00041-7 10.1016/S0167-6377(96)00041-7
    • (1997) Operations Research Letters , vol.20 , pp. 129-139
    • Lee, C.Y.1
  • 18
    • 0033116875 scopus 로고    scopus 로고
    • Two-machine flowshop scheduling with availability constraints
    • 10.1016/S0377-2217(97)00452-9 10.1016/S0377-2217(97)00452-9
    • C.Y. Lee 1999 Two-machine flowshop scheduling with availability constraints European Journal of Operational Research 114 420 429 10.1016/S0377-2217(97)00452-9 10.1016/S0377-2217(97)00452-9
    • (1999) European Journal of Operational Research , vol.114 , pp. 420-429
    • Lee, C.Y.1
  • 21
    • 34248179019 scopus 로고    scopus 로고
    • A variable neighborhood search for minimizing single machine weighted earliness and tardiness with common due date
    • DOI 10.1016/j.cie.2007.01.004, PII S0360835207000150
    • C.J. Liao C.C. Cheng 2007 A variable neighborhood search for minimizing single machine weighted earliness and tardiness with common due date Computers & Industrial Engineering 52 404 413 10.1016/j.cie.2007.01.004 10.1016/j.cie.2007.01.004 (Pubitemid 46719704)
    • (2007) Computers and Industrial Engineering , vol.52 , Issue.4 , pp. 404-413
    • Liao, C.-J.1    Cheng, C.-C.2
  • 22
    • 0000700371 scopus 로고
    • Maintenance policies for stochastically failing equipment: A survey
    • 10.1287/mnsc.11.5.493
    • J.J. McCall 1965 Maintenance policies for stochastically failing equipment: A survey Management Science 11 493 524 10.1287/mnsc.11.5.493
    • (1965) Management Science , vol.11 , pp. 493-524
    • McCall, J.J.1
  • 23
    • 0020699921 scopus 로고
    • A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem
    • DOI 10.1016/0305-0483(83)90088-9
    • M. Nawaz E.E. Enscore Jr. I. Ham 1983 A heuristic algorithm for the m-machine, n-job flowshop sequencing problem OMEGA, The International Journal of Management Science 11 1 91 95 10.1016/0305-0483(83)90088-9 (Pubitemid 13193807)
    • (1983) Omega , vol.11 , Issue.1 , pp. 91-95
    • Nawaz, M.1    Enscore Jr., E.E.2    Ham, I.3
  • 24
    • 38249025037 scopus 로고
    • Simulated annealing for permutation flowshop scheduling
    • 10.1016/0305-0483(89)90059-5
    • I. Osman C. Potts 1989 Simulated annealing for permutation flowshop scheduling OMEGA, the International Journal of Management Science 17 6 551 557 10.1016/0305-0483(89)90059-5
    • (1989) OMEGA, the International Journal of Management Science , vol.17 , Issue.6 , pp. 551-557
    • Osman, I.1    Potts, C.2
  • 25
    • 0016995779 scopus 로고
    • A survey of maintenance models: The control and surveillance of deteriorating systems
    • 10.1002/nav.3800230302 10.1002/nav.3800230302
    • W.P. Pierskalla J.A. Voelker 1976 A survey of maintenance models: The control and surveillance of deteriorating systems Naval Logistics Research Quarterly 23 353 388 10.1002/nav.3800230302 10.1002/nav.3800230302
    • (1976) Naval Logistics Research Quarterly , vol.23 , pp. 353-388
    • Pierskalla, W.P.1    Voelker, J.A.2
  • 27
    • 34047122539 scopus 로고    scopus 로고
    • Considering scheduling and preventive maintenance in the flowshop sequencing problem
    • DOI 10.1016/j.cor.2005.12.007, PII S0305054805004041
    • R. Ruiz J.C. García-Díaz C. Maroto 2007 Considering scheduling and preventive maintenance in the flowshop sequencing problem Computers & Operations Research 34 3314 3330 10.1016/j.cor.2005.12.007 10.1016/j.cor.2005.12.007 (Pubitemid 46517859)
    • (2007) Computers and Operations Research , vol.34 , Issue.11 , pp. 3314-3330
    • Ruiz, R.1    García-Díaz, J.C.2    Maroto, C.3
  • 28
    • 27144540137 scopus 로고    scopus 로고
    • A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility
    • DOI 10.1016/j.ejor.2004.06.038, PII S0377221705001451
    • R. Ruiz C. Maroto 2006 A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility European Journal of Operational Research 169 781 800 10.1016/j.ejor.2004.06.038 10.1016/j.ejor.2004. 06.038 (Pubitemid 41492016)
    • (2006) European Journal of Operational Research , vol.169 , Issue.3 , pp. 781-800
    • Ruiz, R.1    Maroto, C.2
  • 29
    • 37049022197 scopus 로고    scopus 로고
    • An Iterated Greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives
    • DOI 10.1016/j.ejor.2006.07.029, PII S0377221706008277
    • R. Ruiz T. Stützle 2008 An Iterated Greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives European Journal of Operational Research 187 3 1143 1159 10.1016/j.ejor.2006.07.029 10.1016/j.ejor.2006.07.029 (Pubitemid 350245722)
    • (2008) European Journal of Operational Research , vol.187 , Issue.3 , pp. 1143-1159
    • Ruiz, R.1    Stutzle, T.2
  • 30
    • 0343963100 scopus 로고    scopus 로고
    • Scheduling with limited machine availability
    • DOI 10.1016/S0377-2217(98)00367-1
    • G. Schmidt 2000 Scheduling with limited machine availability European Journal of Operational Research 121 1 15 10.1016/S0377-2217(98)00367-1 10.1016/S0377-2217(98)00367-1 (Pubitemid 30546340)
    • (2000) European Journal of Operational Research , vol.121 , Issue.1 , pp. 1-15
    • Schmidt, G.1
  • 32
    • 13444291361 scopus 로고    scopus 로고
    • Genetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine
    • DOI 10.1016/j.compind.2004.06.005, PII S0166361504000983, Applications of Genetic Algorithms in Industry
    • N. Sortrakul H.L. Nachtmann C.R. Cassady 2005 Genetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine Computers in Industry 56 161 168 10.1016/j.compind.2004.06.005 10.1016/j.compind.2004.06.005 (Pubitemid 40206234)
    • (2005) Computers in Industry , vol.56 , Issue.2 , pp. 161-168
    • Sortrakul, N.1    Nachtmann, H.L.2    Cassady, C.R.3
  • 33
    • 34548454869 scopus 로고    scopus 로고
    • A two-machine flowshop scheduling problem with a separated maintenance constraint
    • DOI 10.1016/j.cor.2006.04.007, PII S0305054806001262
    • D.L. Yanga C.J. Hsub W.H. Kuoc 2008 A two-machine flowshop scheduling problem with a separated maintenance constraint Computers & Operations Research 35 3 876 883 10.1016/j.cor.2006.04.007 10.1016/j.cor.2006.04.007 (Pubitemid 47368845)
    • (2008) Computers and Operations Research , vol.35 , Issue.3 , pp. 876-883
    • Yang D.-Li1    Hsu, C.-J.2    Kuo, W.H.3
  • 34
    • 0018520161 scopus 로고
    • Optimal two-stage production with setup times separated
    • T. Yoshida K. Hitomi 1979 Optimal two-stage production with setup times separated AIIE Transactions 11 261 263
    • (1979) AIIE Transactions , vol.11 , pp. 261-263
    • Yoshida, T.1    Hitomi, K.2
  • 35
    • 33748321077 scopus 로고    scopus 로고
    • An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times
    • DOI 10.1016/j.amc.2005.11.136, PII S0096300305011021
    • M. Zandieh S.M.T. Fatemi Ghomi S.M. Moattar Husseini 2006 An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times Journal of Applied Mathematics and Computation 180 111 127 10.1016/j.amc.2005.11.136 10.1016/j.amc.2005.11.136 (Pubitemid 44331328)
    • (2006) Applied Mathematics and Computation , vol.180 , Issue.1 , pp. 111-127
    • Zandieh, M.1    Fatemi Ghomi, S.M.T.2    Moattar Husseini, S.M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.