Volumn 61, Issue 2, 2011, Pages 336-345

Variable neighborhood search approaches for scheduling jobs on parallel machines with sequence-dependent setup times, precedence constraints, and ready times

Author keywords

Parallel machines; Scheduling; Semiconductor manufacturing; Total weighted tardiness; Variable neighborhood search

Indexed keywords

AUTOMATED TRANSPORT; COMPLEX JOB SHOP; COMPUTATIONAL EXPERIMENT; DECOMPOSITION APPROACH; DISPATCHING RULES; IDENTICAL PARALLEL MACHINES; INITIAL SOLUTION; JOB SHOP; ON-TIME DELIVERY PERFORMANCE; PARALLEL MACHINE; PERFORMANCE MEASURE; PRECEDENCE CONSTRAINTS; SCHEDULING JOBS; SCHEDULING PROBLEM; SEMICONDUCTOR MANUFACTURING; SEQUENCE-DEPENDENT SETUP TIME; SOLUTION PROCEDURE; SOLUTION QUALITY; SUB-PROBLEMS; TARDINESS COST; TEST INSTANCES; TOTAL-WEIGHTED TARDINESS; VARIABLE NEIGHBORHOOD SEARCH;

EID: 79958031546     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2010.07.001     Document Type: Conference Paper
Times cited : (77)

References (43)
  • 1
    • 0023977010 scopus 로고
    • The shifting bottleneck procedure for job shop scheduling
    • J. Adams, E. Balas, and D. Zawack The shifting bottleneck procedure for job shop scheduling Management Science 34 1988 391 401
    • (1988) Management Science , vol.34 , pp. 391-401
    • Adams, J.1    Balas, E.2    Zawack, D.3
  • 2
    • 33745192598 scopus 로고    scopus 로고
    • On a parallel machine scheduling problem with precedence constraints
    • I. Aho, and E. Mäkinen On a parallel machine scheduling problem with precedence constraints Journal of Scheduling 9 2006 493 495
    • (2006) Journal of Scheduling , vol.9 , pp. 493-495
    • Aho, I.1    Mäkinen, E.2
  • 3
    • 36849082395 scopus 로고    scopus 로고
    • A survey of scheduling problems with setup times or costs
    • DOI 10.1016/j.ejor.2006.06.060, PII S0377221706008174
    • A. Allahverdi, C.T. Ng, T.C.E. Cheng, and M.Y. Kovalyov A survey of scheduling problems with setup times or costs European Journal of Operational Research 187 2008 985 1032 (Pubitemid 350236619)
    • (2008) European Journal of Operational Research , vol.187 , Issue.3 , pp. 985-1032
    • Allahverdi, A.1    Ng, C.T.2    Cheng, T.C.E.3    Kovalyov, M.Y.4
  • 5
    • 34047181001 scopus 로고    scopus 로고
    • Parallel machine total tardiness scheduling with a new hybrid metaheuristic approach
    • DOI 10.1016/j.cor.2006.02.009, PII S0305054806000463
    • D. Anghinolfi, and M. Paolucci Parallel machine total tardiness scheduling with a new hybrid metaheuristic approach Computers & Operations Research 34 2007 3471 3490 (Pubitemid 46517867)
    • (2007) Computers and Operations Research , vol.34 , Issue.11 , pp. 3471-3490
    • Anghinolfi, D.1    Paolucci, M.2
  • 6
    • 58349112885 scopus 로고    scopus 로고
    • A new ant colony optimization approach for the single machine total weighted tardiness scheduling problem
    • D. Anghinolfi, and M. Paolucci A new ant colony optimization approach for the single machine total weighted tardiness scheduling problem International Journal of Operations Research 5 1 2008 1 17
    • (2008) International Journal of Operations Research , vol.5 , Issue.1 , pp. 1-17
    • Anghinolfi, D.1    Paolucci, M.2
  • 7
    • 52049112160 scopus 로고    scopus 로고
    • A new discrete particle swarm optimization approach for the total weighted tardiness scheduling problem
    • D. Anghinolfi, and M. Paolucci A new discrete particle swarm optimization approach for the total weighted tardiness scheduling problem European Journal of Operational Research 193 1 2009 73 85
    • (2009) European Journal of Operational Research , vol.193 , Issue.1 , pp. 73-85
    • Anghinolfi, D.1    Paolucci, M.2
  • 8
    • 33144486490 scopus 로고    scopus 로고
    • A survey on automated material handling systems in 300-mm semiconductor fabs
    • G.K. Angrawal, and S.S. Heragu A survey on automated material handling systems in 300-mm semiconductor fabs IEEE Transactions on Semiconductor Manufacturing 19 1 2006 112 119
    • (2006) IEEE Transactions on Semiconductor Manufacturing , vol.19 , Issue.1 , pp. 112-119
    • Angrawal, G.K.1    Heragu, S.S.2
  • 9
    • 1542685255 scopus 로고    scopus 로고
    • Genetic algorithm based scheduling of parallel batch machines with incompatible job families to minimize total weighted tardiness
    • H. Balasubramanian, L. Mönch, J.W. Fowler, and M. Pfund Genetic algorithm based scheduling of parallel batch machines with incompatible job families to minimize total weighted tardiness International Journal of Production Research 42 8 2004 1621 1638
    • (2004) International Journal of Production Research , vol.42 , Issue.8 , pp. 1621-1638
    • Balasubramanian, H.1    Mönch, L.2    Fowler, J.W.3    Pfund, M.4
  • 10
    • 84958959971 scopus 로고    scopus 로고
    • On Permutation Representations for Scheduling Problems
    • Parallel Problem Solving from Nature - PPSN IV
    • Bierwirth, C., Mattfeld, D., & Kopfer, H. (1996). On permutation representations for scheduling problems. In Proceedings parallel problem solving from nature (Vol. IV, pp. 310-318). (Pubitemid 126128319)
    • (1996) Proceedings parallel problem solving from nature , Issue.1141 , pp. 310-318
    • Bierwirth, C.1    Mattfeld, D.C.2    Kopfer, H.3
  • 12
    • 35248854622 scopus 로고    scopus 로고
    • Neighborhoods revisited: Investigation into the effectiveness of variable neighborhood descent for scheduling
    • den Besten, M. L., & Stützle, T. (2001). Neighborhoods revisited: Investigation into the effectiveness of variable neighborhood descent for scheduling. In Proceedings of the 4th Metaheuristic International Conference (MIC 2001) (pp. 545-549).
    • (2001) Proceedings of the 4th Metaheuristic International Conference (MIC 2001) , pp. 545-549
    • Den Besten, M.L.1
  • 13
    • 0032156495 scopus 로고    scopus 로고
    • Scheduling identical jobs with unequal ready times on uniform parallel machines to minimize the maximum lateness
    • M.M. Dessouky Scheduling identical jobs with unequal ready times on uniform parallel machines to minimize the maximum lateness Computers and Industrial Engineering 34 4 1998 793 806
    • (1998) Computers and Industrial Engineering , vol.34 , Issue.4 , pp. 793-806
    • Dessouky, M.M.1
  • 15
    • 80052447509 scopus 로고    scopus 로고
    • Scheduling jobs on parallel machines with sequence-dependent setup times, precedence constraints, and ready times using variable neighborhood search in Table
    • Driessel, R., & Mönch, L. (2009). Scheduling jobs on parallel machines with sequence-dependent setup times, precedence constraints, and ready times using variable neighborhood search in Table. In Proceedings 39th computer and industrial engineering conference (CIE 39) (pp. 317-322).
    • (2009) Proceedings 39th Computer and Industrial Engineering Conference (CIE 39) , pp. 317-322
    • Driessel, R.1
  • 16
    • 0347649432 scopus 로고    scopus 로고
    • Minimizing makespan on parallel machines subject to release dates and delivery times
    • A. Gharbi, and M. Haouari Minimizing makespan on parallel machines subject to release dates and delivery times Journal of Scheduling 5 2002 329 355
    • (2002) Journal of Scheduling , vol.5 , pp. 329-355
    • Gharbi, A.1    Haouari, M.2
  • 18
    • 33748423575 scopus 로고    scopus 로고
    • Algorithms for single machine total tardiness scheduling with sequence dependent setups
    • DOI 10.1016/j.ejor.2005.05.018, PII S0377221705005060
    • S.R. Gupta, and J.S. Smith Algorithms for single machine total tardiness scheduling with sequence dependent setups European Journal of Operational Research 175 2006 722 739 (Pubitemid 44345073)
    • (2006) European Journal of Operational Research , vol.175 , Issue.2 , pp. 722-739
    • Gupta, S.R.1    Smith, J.S.2
  • 19
    • 0034818087 scopus 로고    scopus 로고
    • Variable neighborhood search: Principles and applications
    • DOI 10.1016/S0377-2217(00)00100-4
    • P. Hansen, and N. Mladenovic Variable neighborhood search: Principles and applications European Journal of Operational Research 130 2001 449 467 (Pubitemid 32875304)
    • (2001) European Journal of Operational Research , vol.130 , Issue.3 , pp. 449-467
    • Hansen, P.1    Mladenovic, N.2
  • 20
    • 0031275738 scopus 로고    scopus 로고
    • Heuristics for unrelated machine scheduling with precedence constraints
    • PII S0377221796002470
    • J. Hermann, J.-M. Proth, and N. Sauer Heuristics for unrelated machine scheduling with precedence constraints European Journal of Operational Research 102 1997 528 537 (Pubitemid 127397089)
    • (1997) European Journal of Operational Research , vol.102 , Issue.3 , pp. 528-537
    • Herrmann, J.1    Proth, J.-M.2    Sauer, N.3
  • 21
    • 74549151667 scopus 로고    scopus 로고
    • Minimizing make span on parallel machines with precedence constraints and machine eligibility restrictions
    • X. Hu, J.-S. Bao, and Y. Jin Minimizing make span on parallel machines with precedence constraints and machine eligibility restrictions International Journal of Production Research 48 6 2010 1639 1651
    • (2010) International Journal of Production Research , vol.48 , Issue.6 , pp. 1639-1651
    • Hu, X.1    Bao, J.-S.2    Jin, Y.3
  • 22
    • 0035681031 scopus 로고    scopus 로고
    • List scheduling in a parallel machine environment with precedence constraints and setup times
    • DOI 10.1016/S0167-6377(01)00104-3, PII S0167637701001043
    • J. Hurink, and S. Knust List scheduling in a parallel machine environment with precedence constraints and setup times Operations Research Letters 29 2001 231 239 (Pubitemid 34065064)
    • (2001) Operations Research Letters , vol.29 , Issue.5 , pp. 231-239
    • Hurink, J.1    Knust, S.2
  • 25
    • 77957077792 scopus 로고
    • A pseudopolynomial time algorithm for sequencing jobs to minimize total weighted tardiness
    • E.L. Lawler A pseudopolynomial time algorithm for sequencing jobs to minimize total weighted tardiness Annals of Discrete Mathematics 1 1977 331 342
    • (1977) Annals of Discrete Mathematics , vol.1 , pp. 331-342
    • Lawler, E.L.1
  • 26
    • 0000482108 scopus 로고    scopus 로고
    • Scheduling jobs on parallel machines with sequence-dependent setup times
    • Y.H. Lee, and M. Pinedo Scheduling jobs on parallel machines with sequence-dependent setup times European Journal of Operational Research 100 1997 464 474 (Pubitemid 127392370)
    • (1997) European Journal of Operational Research , vol.100 , Issue.3 , pp. 464-474
    • Lee, Y.H.1    Pinedo, M.2
  • 27
    • 34248179019 scopus 로고    scopus 로고
    • A variable neighborhood search for minimizing single machine weighted earliness and tardiness with common due date
    • DOI 10.1016/j.cie.2007.01.004, PII S0360835207000150
    • C.-J. Liao, and C.-C. Cheng A variable neighborhood search for minimizing single machine weighted earliness and tardiness with common due date Computers & Industrial Engineering 52 2007 404 413 (Pubitemid 46719704)
    • (2007) Computers and Industrial Engineering , vol.52 , Issue.4 , pp. 404-413
    • Liao, C.-J.1    Cheng, C.-C.2
  • 28
    • 33845332680 scopus 로고    scopus 로고
    • An ant colony optimization for single-machine tardiness scheduling with sequence-dependent setups
    • DOI 10.1016/j.cor.2005.07.020, PII S0305054805002467
    • C.-J. Liao, and H.-C. Juan An ant colony optimization for single-machine tardiness scheduling with sequence-dependent setups Computers & Operations Research 2007 1899 1909 (Pubitemid 44879763)
    • (2007) Computers and Operations Research , vol.34 , Issue.7 , pp. 1899-1909
    • Liao, C.-J.1    Juan, H.-C.2
  • 29
    • 35248849308 scopus 로고    scopus 로고
    • Solving single-machine total weighted tardiness problems with sequence-dependent setup times by meta-heuristics
    • DOI 10.1007/s00170-006-0693-1
    • S.-W. Lin, and K.-C. Ying Solving single machine total weighted tardiness problems with sequence dependent setup times by meta-heuristics International Journal of Advanced Manufacturing Technology 34 2007 1183 1190 (Pubitemid 47561826)
    • (2007) International Journal of Advanced Manufacturing Technology , vol.34 , Issue.11-12 , pp. 1183-1190
    • Lin, S.-W.1    Ying, K.-C.2
  • 30
    • 33745140543 scopus 로고    scopus 로고
    • Some dominance properties for single-machine tardiness problems with sequence-dependent setup
    • DOI 10.1080/00207540500543257, PII V7048467678267
    • X. Lou, C. Chu, and C. Wang Some dominance properties for single-machine tardiness problems with sequence-dependent setup International Journal of Production Research 44 17 2006 3367 3378 (Pubitemid 43898307)
    • (2006) International Journal of Production Research , vol.44 , Issue.17 , pp. 3367-3378
    • Luo, X.1    Chu, C.2    Wang, C.3
  • 32
    • 26444453872 scopus 로고    scopus 로고
    • A distributed shifting bottleneck heuristic for complex job shops
    • L. Mönch, and R. Driessel A distributed shifting bottleneck heuristic for complex job shops Computers & Industrial Engineering 49 2005 673 680
    • (2005) Computers & Industrial Engineering , vol.49 , pp. 673-680
    • Mönch, L.1    Driessel, R.2
  • 33
    • 33750718514 scopus 로고    scopus 로고
    • Genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops
    • DOI 10.1016/j.ejor.2005.12.020, PII S0377221705008532
    • L. Mönch, R. Schabacker, D. Pabst, and J.W. Fowler Genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops European Journal of Operational Research 177 3 2007 2100 2118 (Pubitemid 44709466)
    • (2007) European Journal of Operational Research , vol.177 , Issue.3 , pp. 2100-2118
    • Monch, L.1    Schabacker, R.2    Pabst, D.3    Fowler, J.W.4
  • 34
    • 80052483583 scopus 로고    scopus 로고
    • Scheduling semiconductor manufacturing operations: Problems, solution techniques, and future challenges
    • Mönch, L., Fowler, J.W., Mason, S.J., Dauzere-Peres, S., & Rose, O. (2009). Scheduling semiconductor manufacturing operations: Problems, solution techniques, and future challenges. In Proceedings 4th multidisciplinary international scheduling conference (MISTA) (pp. 192-201).
    • (2009) Proceedings 4th Multidisciplinary International Scheduling Conference (MISTA) , pp. 192-201
    • Mönch, L.1
  • 35
    • 0029404198 scopus 로고
    • Rolling horizon procedures for dynamic parallel machine scheduling with sequence dependent setup times
    • I.M. Ovacik, and R. Uzsoy Rolling horizon procedures for dynamic parallel machine scheduling with sequence dependent setup times International Journal of Production Research 33 1995 3173 3292
    • (1995) International Journal of Production Research , vol.33 , pp. 3173-3292
    • Ovacik, I.M.1    Uzsoy, R.2
  • 37
    • 0033717569 scopus 로고    scopus 로고
    • Scheduling jobs on parallel machines applying neural networks and heuristic rules
    • Y. Park, S. Kim, and Y.-H. Lee Scheduling jobs on parallel machines applying neural networks and heuristic rules Computers & Industrial Engineering 38 2000 189 202
    • (2000) Computers & Industrial Engineering , vol.38 , pp. 189-202
    • Park, Y.1    Kim, S.2    Lee, Y.-H.3
  • 38
    • 41449109607 scopus 로고    scopus 로고
    • Scheduling jobs on parallel machines with setup times and ready times
    • DOI 10.1016/j.cie.2007.08.011, PII S036083520700229X
    • M. Pfund, J.W. Fowler, A. Gadkari, and Y. Chen Scheduling jobs on parallel machines with setup times and ready times Computers & Industrial Engineering 54 2008 764 782 (Pubitemid 351458378)
    • (2008) Computers and Industrial Engineering , vol.54 , Issue.4 , pp. 764-782
    • Pfund, M.1    Fowler, J.W.2    Gadkari, A.3    Chen, Y.4
  • 39
    • 34147190027 scopus 로고    scopus 로고
    • Solving parallel machines scheduling problems with sequence-dependent setup times using variable neighbourhood search
    • DOI 10.1093/imaman/dpm016
    • M.L. Rocha, M.G. Ravetti, G.R. Mateus, and P.M. Pardalos Solving parallel machines scheduling problems with sequence-dependent setup times using variable neighbourhood search IMA Journal of Management Mathematics 18 2007 101 115 (Pubitemid 46552838)
    • (2007) IMA Journal Management Mathematics , vol.18 , Issue.2 , pp. 101-115
    • De Paula, M.R.1    Ravetti, M.G.2    Mateus, G.R.3    Pardalos, P.M.4
  • 41
    • 0028496979 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry, part II: Shop floor control
    • R. Uzsoy, C.Y. Lee, and L.A. Martin-Vega A review of production planning and scheduling models in the semiconductor industry, part II: Shop floor control IIE Transactions 26 1994 44 55
    • (1994) IIE Transactions , vol.26 , pp. 44-55
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3
  • 42
    • 0005752222 scopus 로고
    • Priority rules and lead time estimates for job shop scheduling with weighted tardiness costs
    • A. Vepsalainen, and T.E. Morton Priority rules and lead time estimates for job shop scheduling with weighted tardiness costs Management Science 33 1987 1036 1047
    • (1987) Management Science , vol.33 , pp. 1036-1047
    • Vepsalainen, A.1    Morton, T.E.2
  • 43
    • 56549092634 scopus 로고    scopus 로고
    • A population-based variable neighborhood search for the single machine total weighted tardiness problem
    • X. Wang, and L. Tang A population-based variable neighborhood search for the single machine total weighted tardiness problem Computers & Operations Research 36 6 2009 2105 2110
    • (2009) Computers & Operations Research , vol.36 , Issue.6 , pp. 2105-2110
    • Wang, X.1    Tang, L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.