메뉴 건너뛰기




Volumn 49, Issue 13, 2011, Pages 3891-3918

Simultaneous scheduling of production and maintenance tasks in the job shop

Author keywords

GA parameters; job shop; lower bounds; maintenance; multi objective genetic algorithms; scheduling

Indexed keywords

COMPUTATIONAL EXPERIMENT; GA PARAMETERS; JOB SHOP; JOB SHOP PROBLEM; LOWER BOUNDS; MAINTENANCE COST; MAINTENANCE TASKS; MAKESPAN; MULTI-OBJECTIVE GENETIC ALGORITHM; PARETO OPTIMAL SOLUTIONS; PRODUCTION OPERATIONS; SIMULTANEOUS SCHEDULING;

EID: 79957490775     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2010.492405     Document Type: Article
Times cited : (52)

References (53)
  • 1
    • 13444281231 scopus 로고    scopus 로고
    • Two-job shop scheduling problems with availability constraints
    • Proceedings of the 14th International Conference on Automated Planning and Scheduling, ICAPS 2004
    • Aggoune, R., 2004. Two-job shop scheduling problems with availability constraints. In: Proceedings of the fourteenth international conference on automated planning and scheduling ICAPS 2004, 3-7 June, Whistler, Canada, 253-259. (Pubitemid 40201852)
    • (2004) Proceedings of the 14th International Conference on Automated Planning and Scheduling, ICAPS 2004 , pp. 253-259
    • Aggoune, R.1
  • 2
    • 60749128979 scopus 로고    scopus 로고
    • Single machine scheduling with preventive maintenances
    • Batun, S. and Azizolu, M., 2009. Single machine scheduling with preventive maintenances. International Journal of Production Research, 47 (7), 1753-1771.
    • (2009) International Journal of Production Research , vol.47 , Issue.7 , pp. 1753-1771
    • Batun, S.1    Azizolu, M.2
  • 3
    • 79957451882 scopus 로고    scopus 로고
    • Evaluation des coǔts de maintenance d'un probléme d'ordonnancement conjoint de production et de maintenance de type job shop
    • 9-10 July, Mons, Belgium
    • Ben Ali, M., et al., 2007. Evaluation des coǔts de maintenance d'un probléme d'ordonnancement conjoint de production et de maintenance de type job shop. In: Proceedings of 3e Congrés Performances et Nouvelles TechnOlogies en Maintenance PENTOM 2007, 9-10 July, Mons, Belgium.
    • (2007) Proceedings of 3e Congrés Performances et Nouvelles TechnOlogies en Maintenance PENTOM 2007
    • Ben Ali, M.1
  • 4
    • 35248844941 scopus 로고    scopus 로고
    • Resolution of joint maintenance/production scheduling by sequential and integrated strategies
    • Berlin: Springer
    • Benbouzid, F., Varnier, C., and Zerhouni, N., 2003. Resolution of joint maintenance/production scheduling by sequential and integrated strategies. In: Artificial neural nets problem solving methods (LNCS vol. 2687). Berlin: Springer, 782-789.
    • (2003) Artificial Neural Nets Problem Solving Methods (LNCS , vol.2687 , pp. 782-789
    • Benbouzid, F.1    Varnier, C.2    Zerhouni, N.3
  • 5
    • 2442429732 scopus 로고    scopus 로고
    • An improved approximation algorithm for two-machine flow shop scheduling with an availability constraint
    • Breit, J., 2004. An improved approximation algorithm for two-machine flow shop scheduling with an availability constraint. Information Processing Letters, 90 (6), 273-278.
    • (2004) Information Processing Letters , vol.90 , Issue.6 , pp. 273-278
    • Breit, J.1
  • 6
    • 0038813446 scopus 로고    scopus 로고
    • Minimizing job tardiness using integrated preventive maintenance planning and production scheduling
    • Cassady, C.R. and Kutanoglu, E., 2003. Minimizing job tardiness using integrated preventive maintenance planning and production scheduling. IEE Transactions, 35 (6), 503-513.
    • (2003) IEE Transactions , vol.35 , Issue.6 , pp. 503-513
    • Cassady, C.R.1    Kutanoglu, E.2
  • 7
    • 4544273350 scopus 로고    scopus 로고
    • A condition-based maintenance policy with nonperiodic inspections for a two-unit series system
    • Castanier, B., Grall, A., and Bérenguer, C., 2005. A condition-based maintenance policy with nonperiodic inspections for a two-unit series system. Reliability Engineering and System Safety, 87 (1), 109-120.
    • (2005) Reliability Engineering and System Safety , vol.87 , Issue.1 , pp. 109-120
    • Castanier, B.1    Grall, A.2    Bérenguer, C.3
  • 8
    • 0035546218 scopus 로고    scopus 로고
    • A genetic approach to the scheduling of preventive maintenance tasks on a single product manufacturing production line
    • DOI 10.1016/S0925-5273(01)00120-7, PII S0925527301001207
    • Cavory, G., Dupas, R., and Goncalves, G., 2001. A genetic approach to the scheduling of preventive maintenance tasks on a single product manufacturing production line. International Journal of Production Economics, 74 (1-3), 135-146. (Pubitemid 32998199)
    • (2001) International Journal of Production Economics , vol.74 , Issue.1-3 , pp. 135-146
    • Cavory, G.1    Dupas, R.2    Goncalves, G.3
  • 9
    • 33746855485 scopus 로고    scopus 로고
    • Solving distributed FMS scheduling problems subject to maintenance: Genetic algorithms approach
    • DOI 10.1016/j.rcim.2005.11.005, PII S0736584506000627
    • Chan, F.T.S., 2006. Solving distributed FMS scheduling problems subject to maintenance: Genetic algorithms approach. Robotics and Computer-Integrated Manufacturing, 22 (5-6), 493-504. (Pubitemid 44175755)
    • (2006) Robotics and Computer-Integrated Manufacturing , vol.22 , Issue.5-6 , pp. 493-504
    • Chan, F.T.S.1    Chung, S.H.2    Chan, L.Y.3    Finke, G.4    Tiwari, M.K.5
  • 10
    • 0031099506 scopus 로고    scopus 로고
    • A multicriteria approach to the selection of preventive maintenance intervals
    • PII S0925527396001132
    • Chareonsuk, C., Nagarur, N., and Tabucanon, M.T., 1997.Amulticriteria approach to the selection of preventive maintenance intervals. International Journal of Production Economics, 49 (1), 55-64. (Pubitemid 127412304)
    • (1997) International Journal of Production Economics , vol.49 , Issue.1 , pp. 55-64
    • Chareonsuk, C.1    Nagarur, N.2    Tabucanon, M.T.3
  • 11
    • 41149166270 scopus 로고    scopus 로고
    • Scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan
    • Chen, J.S., 2008. Scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan. European Journal of Operational Research: Discrete Optimization, 190 (1), 90-102.
    • (2008) European Journal of Operational Research: Discrete Optimization , vol.190 , Issue.1 , pp. 90-102
    • Chen, J.S.1
  • 12
    • 0034206108 scopus 로고    scopus 로고
    • An improved heuristic for two-machine flowshop scheduling with an availability constraint
    • Cheng, T.C.E. and Wang, G., 2000. An improved heuristic for two-machine flowshop scheduling with an availability constraint. Operations Research Letters, 26 (5), 223-229.
    • (2000) Operations Research Letters , vol.26 , Issue.5 , pp. 223-229
    • Cheng, T.C.E.1    Wang, G.2
  • 13
    • 70149098664 scopus 로고    scopus 로고
    • A modified genetic algorithm approach for scheduling of perfect maintenance in distributed production scheduling
    • Chung, S.H., Chan, F.T.S., and Chan, H.K., 2009. A modified genetic algorithm approach for scheduling of perfect maintenance in distributed production scheduling. Engineering Application of Artificial Intelligence, 22 (7), 1005-1014.
    • (2009) Engineering Application of Artificial Intelligence , vol.22 , Issue.7 , pp. 1005-1014
    • Chung, S.H.1    Chan, F.T.S.2    Chan, H.K.3
  • 14
    • 0037115791 scopus 로고    scopus 로고
    • Production/maintenance cooperative scheduling using multi-agents and fuzzy logic
    • Coudert, T., Grabot, B., and Archiméde, B., 2002. Production/maintenance cooperative scheduling using multi-agents and fuzzy logic. International Journal of Production Research, 40 (18), 4611-4632.
    • (2002) International Journal of Production Research , vol.40 , Issue.18 , pp. 4611-4632
    • Coudert, T.1    Grabot, B.2    Archiméde, B.3
  • 15
    • 24344437114 scopus 로고    scopus 로고
    • Multi-objective evolutionary algorithms: Introducing bias among pareto-optimal solutions
    • Berlin: Springer
    • Deb, K., 2003. Multi-objective evolutionary algorithms: Introducing bias among Pareto-optimal solutions. Advances in evolutionary computing: Theory and applications. Berlin: Springer, 263-292.
    • (2003) Advances in Evolutionary Computing: Theory and Applications , pp. 263-292
    • Deb, K.1
  • 16
    • 0001947856 scopus 로고
    • Probabilistic learning combinations of local job-shop scheduling rules
    • In: J.F. Muth and G.L. Thompson, eds Englewood Cliffs, New Jersey: Prentice-Hall
    • Fisher, H. and Thompson, G.L., 1963. Probabilistic learning combinations of local job-shop scheduling rules. In: J.F. Muth and G.L. Thompson, eds. Industrial Scheduling. Englewood Cliffs, New Jersey: Prentice-Hall, 225-251.
    • (1963) Industrial Scheduling , pp. 225-251
    • Fisher, H.1    Thompson, G.L.2
  • 17
    • 0001953837 scopus 로고
    • Genetic algorithms for multiobjective optimization: Formulation, discussion, and generalization
    • 17-21, July Urbana-Champaign, IL. San Mateo, CA: Morgan Kaufmann
    • Fonseca, C.M. and Fleming, P.J., 1993. Genetic algorithms for multiobjective optimization: Formulation, discussion, and generalization. In: Proceedings of the fifth international conference on genetic algorithms, 17-21, July Urbana-Champaign, IL. San Mateo, CA: Morgan Kaufmann, 416-423.
    • (1993) Proceedings of the Fifth International Conference on Genetic Algorithms , pp. 416-423
    • Fonseca, C.M.1    Fleming, P.J.2
  • 18
    • 0141828943 scopus 로고    scopus 로고
    • Age replacement policies in two time scales
    • Frickenstein, S.G. and Whitaker, L.R., 2003. Age replacement policies in two time scales. Naval Research Logistics, 50 (6), 592-613.
    • (2003) Naval Research Logistics , vol.50 , Issue.6 , pp. 592-613
    • Frickenstein, S.G.1    Whitaker, L.R.2
  • 20
    • 0037670069 scopus 로고    scopus 로고
    • Design of parametric maintenance cost models. In: Proceedings of the
    • 6-9 October Hammamet, Tunisia
    • Glade, M., Longere, J.Y., and Lyonnet, P., 2002. Design of parametric maintenance cost models. In: Proceedings of the IEEE international conference on systems, man and cybernetics, vol. 3, 6-9 October Hammamet, Tunisia, 6, 01-07.
    • (2002) IEEE International Conference on Systems, Man and Cybernetics , vol.3 , Issue.6 , pp. 01-07
    • Glade, M.1    Longere, J.Y.2    Lyonnet, P.3
  • 23
  • 26
    • 0037201140 scopus 로고    scopus 로고
    • Pareto-optimality approach for flexible job-shop scheduling problems: Hybridisation of evolutionary algorithms and fuzzy logic
    • Kacem, I., Hammadi, S., and Borne, P., 2002. Pareto-optimality approach for flexible job-shop scheduling problems: Hybridisation of evolutionary algorithms and fuzzy logic. Journal of Mathematics and Computers in Simulation, 60 (3-5), 245-276.
    • (2002) Journal of Mathematics and Computers in Simulation , vol.60 , Issue.3-5 , pp. 245-276
    • Kacem, I.1    Hammadi, S.2    Borne, P.3
  • 28
    • 34548580996 scopus 로고    scopus 로고
    • Integrated production scheduling and preventive maintenance planning for a single machine under a cumulative damage failure process
    • DOI 10.1002/nav.20232
    • Kuo, Y. and Chang, Z.A., 2007. Integrated production scheduling and preventive maintenance planning for a single machine under a cumulative damage failure process. Naval Research Logistics, 54 (6), 602-614. (Pubitemid 47395706)
    • (2007) Naval Research Logistics , vol.54 , Issue.6 , pp. 602-614
    • Kuo, Y.1    Chang, Z.-A.2
  • 29
    • 27144431814 scopus 로고    scopus 로고
    • An Introduction to Multiobjective Metaheuristics for Scheduling and Timetabling
    • Metaheuristics for Multiobjective Optimisation
    • Landa Silva, J.D., Burke, E., and Petrovic, S., 2004. An introduction to multiobjective metaheuristics for scheduling and timetabling. In: Metaheuristics for multiobjective optimisation (Lecture notes in economics and mathematical systems vol. 535). Berlin: Springer, 91-132. (Pubitemid 38203478)
    • (2004) LECTURE NOTES in ECONOMICS and MATHEMATICAL SYSTEMS , Issue.535 , pp. 91-132
    • Silva, J.D.L.1    Burke, E.K.2    Petrovic, S.3
  • 33
    • 70349682579 scopus 로고    scopus 로고
    • Optimization of age replacement policy using reliability based heuristic model
    • Mahdavi, M. and Mahdavi, M., 2009. Optimization of age replacement policy using reliability based heuristic model. Journal of Scientific & Industrial Research, 68 (8), 668-673.
    • (2009) Journal of Scientific & Industrial Research , vol.68 , Issue.8 , pp. 668-673
    • Mahdavi, M.1    Mahdavi, M.2
  • 34
    • 0742319169 scopus 로고    scopus 로고
    • An efficient genetic algorithm for job shop scheduling with tardiness objectives
    • Mattfeld, D.C. and Bierwirth, C., 2004. An efficient genetic algorithm for job shop scheduling with tardiness objectives. European Journal of Operational Research, 155 (3), 616-630.
    • (2004) European Journal of Operational Research , vol.155 , Issue.3 , pp. 616-630
    • Mattfeld, D.C.1    Bierwirth, C.2
  • 37
    • 0020699921 scopus 로고
    • A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem
    • DOI 10.1016/0305-0483(83)90088-9
    • Nawaz, M., Enscore Jr., E., and Ham, I., 1983. A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem. Omega, The International Journal of Management Science, 11 (1), 91-95. (Pubitemid 13193807)
    • (1983) Omega , vol.11 , Issue.1 , pp. 91-95
    • Nawaz, M.1    Enscore Jr., E.E.2    Ham, I.3
  • 38
    • 33645260871 scopus 로고    scopus 로고
    • A case study of a multiobjective elitist recombinative genetic algorithm with coevolutionary sharing
    • In: P Angeline, ed Piscataway, NJ: IEEE Press
    • Neef, M., Thierens, D., and Arciszewski, H., 1999. A case study of a multiobjective elitist recombinative genetic algorithm with coevolutionary sharing. In: P Angeline, ed. Proceedings of the international congress on evolutionary computation. Piscataway, NJ: IEEE Press, 796-803.
    • (1999) Proceedings of the International Congress on Evolutionary Computation , pp. 796-803
    • Neef, M.1    Thierens, D.2    Arciszewski, H.3
  • 40
    • 9644307981 scopus 로고    scopus 로고
    • Implementation and benefits of introducing a computerised maintenance management system into a textile manufacturing company
    • O'Donoghue, C.D. and Prendergast, J.G., 2004. Implementation and benefits of introducing a computerised maintenance management system into a textile manufacturing company. Journal of Materials Processing Technology, 153-154, 226-232.
    • (2004) Journal of Materials Processing Technology , vol.153-154 , pp. 226-232
    • O'Donoghue, C.D.1    Prendergast, J.G.2
  • 41
    • 0035470170 scopus 로고    scopus 로고
    • Comparative evaluation of genetic algorithms for job-shop scheduling
    • DOI 10.1080/095372801750397680
    • Ponnambalam, S.G., Aravindan, P., and Sreenivasa Rao, P., 2001. Comparative evaluation of genetic algorithms for job-shop scheduling. Production Planning & Control, 12 (12), 560-574. (Pubitemid 35395059)
    • (2001) Production Planning and Control , vol.12 , Issue.6 , pp. 560-574
    • Ponnambalam, S.G.1    Aravindan, P.2    Sreenivasa Rao, P.3
  • 42
    • 34047122539 scopus 로고    scopus 로고
    • Considering scheduling and preventive maintenance in the flowshop sequencing problem
    • DOI 10.1016/j.cor.2005.12.007, PII S0305054805004041
    • Ruiz, R., Garcia-Diaz, C., and Maroto, C., 2007. Considering scheduling and preventive maintenance in the flowshop sequencing problem. Computers & Operations Research, 34 (11), 3314-330. (Pubitemid 46517859)
    • (2007) Computers and Operations Research , vol.34 , Issue.11 , pp. 3314-3330
    • Ruiz, R.1    Garcia-Diaz, C.2    Maroto, C.3
  • 43
    • 13444291361 scopus 로고    scopus 로고
    • Genetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine
    • DOI 10.1016/j.compind.2004.06.005, PII S0166361504000983, Applications of Genetic Algorithms in Industry
    • Sortrakul, N., Nachtmann, H.L., and Cassady, C.R., 2005. Genetic algorithms for integrated preventive maintenance planning and production scheduling for single machine. Computers in Industry, 56 (2), 161-168. (Pubitemid 40206234)
    • (2005) Computers in Industry , vol.56 , Issue.2 , pp. 161-168
    • Sortrakul, N.1    Nachtmann, H.L.2    Cassady, C.R.3
  • 44
    • 33947227221 scopus 로고    scopus 로고
    • Genetic algorithms for total weighted expected tardiness integrated preventive maintenance planning and production scheduling for a single machine
    • DOI 10.1108/13552510710735113
    • Sortrakul, N. and Cassady, C.R., 2007. Genetic algorithms for total weighted expected tardiness integrated preventive maintenance planning and production scheduling for a single machine. Journal of Quality in Maintenance Engineering, 13 (1), 49-61. (Pubitemid 46432522)
    • (2007) Journal of Quality in Maintenance Engineering , vol.13 , Issue.1 , pp. 49-61
    • Sortrakul, N.1    Cassady, C.R.2
  • 45
    • 0037118559 scopus 로고    scopus 로고
    • A survey of maintenance policies of deteriorating systems
    • DOI 10.1016/S0377-2217(01)00197-7, PII S0377221701001977
    • Wang, H., 2002. A survey of maintenance policies of deteriorating systems. European Journal of Operational Research, 139 (3), 469-489. (Pubitemid 34249626)
    • (2002) European Journal of Operational Research , vol.139 , Issue.3 , pp. 469-489
    • Wang, H.1
  • 46
    • 47049090055 scopus 로고    scopus 로고
    • A condition-based order-replacement policy for a single-unit system
    • Wang, L., Chu, J., and Mao, W., 2008. A condition-based order-replacement policy for a single-unit system. Applied Mathematical Modelling, 32 (11), 2274-2289.
    • (2008) Applied Mathematical Modelling , vol.32 , Issue.11 , pp. 2274-2289
    • Wang, L.1    Chu, J.2    Mao, W.3
  • 47
    • 33746267197 scopus 로고    scopus 로고
    • Heuristics for two-machine flowshop scheduling with setup times and an availability constraint
    • DOI 10.1016/j.cor.2005.05.003, PII S0305054805001516
    • Wang, X. and Cheng, T.C.E., 2007. Heuristics for two-machine flowshop scheduling with setup times and an availability constraint. Computers & Operations Research, 34 (1), 152-162. (Pubitemid 44093846)
    • (2007) Computers and Operations Research , vol.34 , Issue.1 , pp. 152-162
    • Wang, X.1    Edwin Cheng, T.C.2
  • 48
    • 0005495754 scopus 로고    scopus 로고
    • Highway maintenance scheduling using genetic algorithm with microscopic traffic simulation
    • 13-17 January, Washington, DC, paper no. 02-2174
    • Wang, Y., Cheu, R.L., and Fwa, T.F., 2002. Highway maintenance scheduling using genetic algorithm with microscopic traffic simulation. In: Proceedings of the 81st annual meeting of the Transportation Research Board (TRB), 13-17 January, Washington, DC, paper no. 02-2174.
    • (2002) Proceedings of the 81st Annual Meeting of the Transportation Research Board (TRB
    • Wang, Y.1    Cheu, R.L.2    Fwa, T.F.3
  • 49
    • 0031163852 scopus 로고    scopus 로고
    • A dynamic policy for grouping maintenance activities
    • PII S0377221797003190
    • Wildeman, R.E., Dekker, R., and Smit, A.C.J.M., 1997. A dynamic policy for grouping maintenance activities. European Journal of Operational Research, 99 (3), 530-551. (Pubitemid 127416269)
    • (1997) European Journal of Operational Research , vol.99 , Issue.3 , pp. 530-551
    • Wildeman, R.E.1    Dekker, R.2    Smit, A.C.J.M.3
  • 52
    • 34250219585 scopus 로고    scopus 로고
    • A very fast TS/SA algorithm for the job shop scheduling problem
    • DOI 10.1016/j.cor.2006.02.024, PII S0305054806000670
    • Zhang, C.Y., et al., 2008. A very fast TS/SA algorithm for the job shop scheduling problem. Computers & Operations Research, 35 (1), 282-294. (Pubitemid 46899361)
    • (2008) Computers and Operations Research , vol.35 , Issue.1 , pp. 282-294
    • Zhang, C.Y.1    Li, P.2    Rao, Y.3    Guan, Z.4
  • 53
    • 38749084131 scopus 로고    scopus 로고
    • Minimizing the makespan for the MPM job-shop with availability constraints
    • DOI 10.1016/j.ijpe.2007.01.014, PII S092552730700134X
    • Zribi, N., El Kamel, A., and Borne, P., 2008. Minimizing the makespan for the MPM job-shop with availability constraints. International Journal of Production Economics, 112 (1), 151-160. (Pubitemid 351179597)
    • (2008) International Journal of Production Economics , vol.112 , Issue.1 , pp. 151-160
    • Zribi, N.1    El Kamel, A.2    Borne, P.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.