-
1
-
-
13444281231
-
Two-job shop scheduling problems with availability constraints
-
Proceedings of the 14th International Conference on Automated Planning and Scheduling, ICAPS 2004
-
Aggoune, R., 2004. Two-job shop scheduling problems with availability constraints. In: Proceedings of the fourteenth international conference on automated planning and scheduling ICAPS 2004, 3-7 June, Whistler, Canada, 253-259. (Pubitemid 40201852)
-
(2004)
Proceedings of the 14th International Conference on Automated Planning and Scheduling, ICAPS 2004
, pp. 253-259
-
-
Aggoune, R.1
-
2
-
-
60749128979
-
Single machine scheduling with preventive maintenances
-
Batun, S. and Azizolu, M., 2009. Single machine scheduling with preventive maintenances. International Journal of Production Research, 47 (7), 1753-1771.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.7
, pp. 1753-1771
-
-
Batun, S.1
Azizolu, M.2
-
3
-
-
79957451882
-
Evaluation des coǔts de maintenance d'un probléme d'ordonnancement conjoint de production et de maintenance de type job shop
-
9-10 July, Mons, Belgium
-
Ben Ali, M., et al., 2007. Evaluation des coǔts de maintenance d'un probléme d'ordonnancement conjoint de production et de maintenance de type job shop. In: Proceedings of 3e Congrés Performances et Nouvelles TechnOlogies en Maintenance PENTOM 2007, 9-10 July, Mons, Belgium.
-
(2007)
Proceedings of 3e Congrés Performances et Nouvelles TechnOlogies en Maintenance PENTOM 2007
-
-
Ben Ali, M.1
-
4
-
-
35248844941
-
Resolution of joint maintenance/production scheduling by sequential and integrated strategies
-
Berlin: Springer
-
Benbouzid, F., Varnier, C., and Zerhouni, N., 2003. Resolution of joint maintenance/production scheduling by sequential and integrated strategies. In: Artificial neural nets problem solving methods (LNCS vol. 2687). Berlin: Springer, 782-789.
-
(2003)
Artificial Neural Nets Problem Solving Methods (LNCS
, vol.2687
, pp. 782-789
-
-
Benbouzid, F.1
Varnier, C.2
Zerhouni, N.3
-
5
-
-
2442429732
-
An improved approximation algorithm for two-machine flow shop scheduling with an availability constraint
-
Breit, J., 2004. An improved approximation algorithm for two-machine flow shop scheduling with an availability constraint. Information Processing Letters, 90 (6), 273-278.
-
(2004)
Information Processing Letters
, vol.90
, Issue.6
, pp. 273-278
-
-
Breit, J.1
-
6
-
-
0038813446
-
Minimizing job tardiness using integrated preventive maintenance planning and production scheduling
-
Cassady, C.R. and Kutanoglu, E., 2003. Minimizing job tardiness using integrated preventive maintenance planning and production scheduling. IEE Transactions, 35 (6), 503-513.
-
(2003)
IEE Transactions
, vol.35
, Issue.6
, pp. 503-513
-
-
Cassady, C.R.1
Kutanoglu, E.2
-
7
-
-
4544273350
-
A condition-based maintenance policy with nonperiodic inspections for a two-unit series system
-
Castanier, B., Grall, A., and Bérenguer, C., 2005. A condition-based maintenance policy with nonperiodic inspections for a two-unit series system. Reliability Engineering and System Safety, 87 (1), 109-120.
-
(2005)
Reliability Engineering and System Safety
, vol.87
, Issue.1
, pp. 109-120
-
-
Castanier, B.1
Grall, A.2
Bérenguer, C.3
-
8
-
-
0035546218
-
A genetic approach to the scheduling of preventive maintenance tasks on a single product manufacturing production line
-
DOI 10.1016/S0925-5273(01)00120-7, PII S0925527301001207
-
Cavory, G., Dupas, R., and Goncalves, G., 2001. A genetic approach to the scheduling of preventive maintenance tasks on a single product manufacturing production line. International Journal of Production Economics, 74 (1-3), 135-146. (Pubitemid 32998199)
-
(2001)
International Journal of Production Economics
, vol.74
, Issue.1-3
, pp. 135-146
-
-
Cavory, G.1
Dupas, R.2
Goncalves, G.3
-
9
-
-
33746855485
-
Solving distributed FMS scheduling problems subject to maintenance: Genetic algorithms approach
-
DOI 10.1016/j.rcim.2005.11.005, PII S0736584506000627
-
Chan, F.T.S., 2006. Solving distributed FMS scheduling problems subject to maintenance: Genetic algorithms approach. Robotics and Computer-Integrated Manufacturing, 22 (5-6), 493-504. (Pubitemid 44175755)
-
(2006)
Robotics and Computer-Integrated Manufacturing
, vol.22
, Issue.5-6
, pp. 493-504
-
-
Chan, F.T.S.1
Chung, S.H.2
Chan, L.Y.3
Finke, G.4
Tiwari, M.K.5
-
10
-
-
0031099506
-
A multicriteria approach to the selection of preventive maintenance intervals
-
PII S0925527396001132
-
Chareonsuk, C., Nagarur, N., and Tabucanon, M.T., 1997.Amulticriteria approach to the selection of preventive maintenance intervals. International Journal of Production Economics, 49 (1), 55-64. (Pubitemid 127412304)
-
(1997)
International Journal of Production Economics
, vol.49
, Issue.1
, pp. 55-64
-
-
Chareonsuk, C.1
Nagarur, N.2
Tabucanon, M.T.3
-
11
-
-
41149166270
-
Scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan
-
Chen, J.S., 2008. Scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan. European Journal of Operational Research: Discrete Optimization, 190 (1), 90-102.
-
(2008)
European Journal of Operational Research: Discrete Optimization
, vol.190
, Issue.1
, pp. 90-102
-
-
Chen, J.S.1
-
12
-
-
0034206108
-
An improved heuristic for two-machine flowshop scheduling with an availability constraint
-
Cheng, T.C.E. and Wang, G., 2000. An improved heuristic for two-machine flowshop scheduling with an availability constraint. Operations Research Letters, 26 (5), 223-229.
-
(2000)
Operations Research Letters
, vol.26
, Issue.5
, pp. 223-229
-
-
Cheng, T.C.E.1
Wang, G.2
-
13
-
-
70149098664
-
A modified genetic algorithm approach for scheduling of perfect maintenance in distributed production scheduling
-
Chung, S.H., Chan, F.T.S., and Chan, H.K., 2009. A modified genetic algorithm approach for scheduling of perfect maintenance in distributed production scheduling. Engineering Application of Artificial Intelligence, 22 (7), 1005-1014.
-
(2009)
Engineering Application of Artificial Intelligence
, vol.22
, Issue.7
, pp. 1005-1014
-
-
Chung, S.H.1
Chan, F.T.S.2
Chan, H.K.3
-
14
-
-
0037115791
-
Production/maintenance cooperative scheduling using multi-agents and fuzzy logic
-
Coudert, T., Grabot, B., and Archiméde, B., 2002. Production/maintenance cooperative scheduling using multi-agents and fuzzy logic. International Journal of Production Research, 40 (18), 4611-4632.
-
(2002)
International Journal of Production Research
, vol.40
, Issue.18
, pp. 4611-4632
-
-
Coudert, T.1
Grabot, B.2
Archiméde, B.3
-
15
-
-
24344437114
-
Multi-objective evolutionary algorithms: Introducing bias among pareto-optimal solutions
-
Berlin: Springer
-
Deb, K., 2003. Multi-objective evolutionary algorithms: Introducing bias among Pareto-optimal solutions. Advances in evolutionary computing: Theory and applications. Berlin: Springer, 263-292.
-
(2003)
Advances in Evolutionary Computing: Theory and Applications
, pp. 263-292
-
-
Deb, K.1
-
16
-
-
0001947856
-
Probabilistic learning combinations of local job-shop scheduling rules
-
In: J.F. Muth and G.L. Thompson, eds Englewood Cliffs, New Jersey: Prentice-Hall
-
Fisher, H. and Thompson, G.L., 1963. Probabilistic learning combinations of local job-shop scheduling rules. In: J.F. Muth and G.L. Thompson, eds. Industrial Scheduling. Englewood Cliffs, New Jersey: Prentice-Hall, 225-251.
-
(1963)
Industrial Scheduling
, pp. 225-251
-
-
Fisher, H.1
Thompson, G.L.2
-
17
-
-
0001953837
-
Genetic algorithms for multiobjective optimization: Formulation, discussion, and generalization
-
17-21, July Urbana-Champaign, IL. San Mateo, CA: Morgan Kaufmann
-
Fonseca, C.M. and Fleming, P.J., 1993. Genetic algorithms for multiobjective optimization: Formulation, discussion, and generalization. In: Proceedings of the fifth international conference on genetic algorithms, 17-21, July Urbana-Champaign, IL. San Mateo, CA: Morgan Kaufmann, 416-423.
-
(1993)
Proceedings of the Fifth International Conference on Genetic Algorithms
, pp. 416-423
-
-
Fonseca, C.M.1
Fleming, P.J.2
-
18
-
-
0141828943
-
Age replacement policies in two time scales
-
Frickenstein, S.G. and Whitaker, L.R., 2003. Age replacement policies in two time scales. Naval Research Logistics, 50 (6), 592-613.
-
(2003)
Naval Research Logistics
, vol.50
, Issue.6
, pp. 592-613
-
-
Frickenstein, S.G.1
Whitaker, L.R.2
-
19
-
-
79957448913
-
Stratégie de maintenance préventive de type ǎge : Approche basée sur l'intégration de la simulation et des plans d'expérience
-
25-27 April, Troyes, France
-
Gharbi, A., Beauchamp, Y., and Andriamaharosoa, S., 2001. Stratégie de maintenance préventive de type ǎge : Approche basée sur l'intégration de la simulation et des plans d'expérience. In: Proceedings of 3e Conférence Francophone de MOdélisation et SIMulation 'Conception, Analyse et Gestion des Systémes Industriels' MOSIM'01, 25-27 April, Troyes, France, 797-803.
-
(2001)
Proceedings of 3e Conférence Francophone de MOdélisation et SIMulation 'Conception, Analyse et Gestion des Systémes Industriels' MOSIM'01
, pp. 797-803
-
-
Gharbi, A.1
Beauchamp, Y.2
Andriamaharosoa, S.3
-
20
-
-
0037670069
-
Design of parametric maintenance cost models. In: Proceedings of the
-
6-9 October Hammamet, Tunisia
-
Glade, M., Longere, J.Y., and Lyonnet, P., 2002. Design of parametric maintenance cost models. In: Proceedings of the IEEE international conference on systems, man and cybernetics, vol. 3, 6-9 October Hammamet, Tunisia, 6, 01-07.
-
(2002)
IEEE International Conference on Systems, Man and Cybernetics
, vol.3
, Issue.6
, pp. 01-07
-
-
Glade, M.1
Longere, J.Y.2
Lyonnet, P.3
-
22
-
-
13544269251
-
A hybrid genetic algorithm for the job shop scheduling problem
-
Gonçalves, J.F., Mendes, J.J.M., and Resende, M.G.C., 2005. A hybrid genetic algorithm for the job shop scheduling problem. European Journal of Operational Research, 167 (1), 73-95.
-
(2005)
European Journal of Operational Research
, vol.167
, Issue.1
, pp. 73-95
-
-
Gonçalves, J.F.1
Mendes, J.J.M.2
Resende, M.G.C.3
-
23
-
-
55349142509
-
Scheduling preventive maintenance on a single CNC machine
-
Gurel, S. and Selim Akturk, M., 2008. Scheduling preventive maintenance on a single CNC machine. International Journal of Production Research, 46 (24), 6797-6821.
-
(2008)
International Journal of Production Research
, vol.46
, Issue.24
, pp. 6797-6821
-
-
Gurel, S.1
Selim Akturk, M.2
-
24
-
-
78049424879
-
Lower bounds and multiobjective evolutionary optimization for combined maintenance and production scheduling in job shop
-
16-17 September, Lisbon, Portugal
-
Harrath, Y., Chebel-Morello, B., and Zerhouni, N., 2003. Lower bounds and multiobjective evolutionary optimization for combined maintenance and production scheduling in job shop. In: Proceedings of the 9th IEEE international conference on emerging technologies and factory automation, ETFA'03, 16-17 September, Lisbon, Portugal, 2, 95-100.
-
(2003)
Proceedings of the 9th IEEE International Conference on Emerging Technologies and Factory Automation, ETFA'03
, vol.2
, pp. 95-100
-
-
Harrath, Y.1
Chebel-Morello, B.2
Zerhouni, N.3
-
25
-
-
79957528679
-
Scheduling with machine availability: An integrated approach
-
26-28 May, Porto, Portugal
-
Kaabi, J., Varnier, C., and Zerhouni, N., 2003. Scheduling with machine availability: An integrated approach. In: Proceedings of the international conference on industrial engineering and production management, IEPM'03, 26-28 May, Porto, Portugal.
-
(2003)
Proceedings of the International Conference on Industrial Engineering and Production Management, IEPM'03
-
-
Kaabi, J.1
Varnier, C.2
Zerhouni, N.3
-
26
-
-
0037201140
-
Pareto-optimality approach for flexible job-shop scheduling problems: Hybridisation of evolutionary algorithms and fuzzy logic
-
Kacem, I., Hammadi, S., and Borne, P., 2002. Pareto-optimality approach for flexible job-shop scheduling problems: Hybridisation of evolutionary algorithms and fuzzy logic. Journal of Mathematics and Computers in Simulation, 60 (3-5), 245-276.
-
(2002)
Journal of Mathematics and Computers in Simulation
, vol.60
, Issue.3-5
, pp. 245-276
-
-
Kacem, I.1
Hammadi, S.2
Borne, P.3
-
27
-
-
0036466573
-
Two-machine flow shops with limited machine availability
-
DOI 10.1016/S0377-2217(01)00083-2, PII S0377221701000832
-
Kubiak, W., et al., 2002. Two-machine flow shops with limited machine availability. European Journal of Operational Research: Discrete Optimization, 136 (3), 528-540. (Pubitemid 33094119)
-
(2002)
European Journal of Operational Research
, vol.136
, Issue.3
, pp. 528-540
-
-
Kubiak, W.1
Blazewicz, J.2
Formanowicz, P.3
Breit, J.4
Schmidt, G.5
-
28
-
-
34548580996
-
Integrated production scheduling and preventive maintenance planning for a single machine under a cumulative damage failure process
-
DOI 10.1002/nav.20232
-
Kuo, Y. and Chang, Z.A., 2007. Integrated production scheduling and preventive maintenance planning for a single machine under a cumulative damage failure process. Naval Research Logistics, 54 (6), 602-614. (Pubitemid 47395706)
-
(2007)
Naval Research Logistics
, vol.54
, Issue.6
, pp. 602-614
-
-
Kuo, Y.1
Chang, Z.-A.2
-
29
-
-
27144431814
-
An Introduction to Multiobjective Metaheuristics for Scheduling and Timetabling
-
Metaheuristics for Multiobjective Optimisation
-
Landa Silva, J.D., Burke, E., and Petrovic, S., 2004. An introduction to multiobjective metaheuristics for scheduling and timetabling. In: Metaheuristics for multiobjective optimisation (Lecture notes in economics and mathematical systems vol. 535). Berlin: Springer, 91-132. (Pubitemid 38203478)
-
(2004)
LECTURE NOTES in ECONOMICS and MATHEMATICAL SYSTEMS
, Issue.535
, pp. 91-132
-
-
Silva, J.D.L.1
Burke, E.K.2
Petrovic, S.3
-
30
-
-
0003994089
-
-
Graduate School of Administration, Carregie-Mellon University, Pittsburgh, PA, USA
-
Lawrence, S., 1984. Resource constrained project scheduling: An experimental investigation of heuristic scheduling techniques. Graduate School of Administration, Carregie-Mellon University, Pittsburgh, PA, USA.
-
(1984)
Resource Constrained Project Scheduling: An Experimental Investigation of Heuristic Scheduling Techniques
-
-
Lawrence, S.1
-
32
-
-
0035900864
-
Single-machine scheduling with maintenance and repair ratemodifying activities
-
Lee, C.Y. and Lin, C.S., 2001. Single-machine scheduling with maintenance and repair ratemodifying activities. European Journal of Operational Research: Theory and Methodology, 135 (3), 493-513.
-
(2001)
European Journal of Operational Research: Theory and Methodology
, vol.135
, Issue.3
, pp. 493-513
-
-
Lee, C.Y.1
Lin, C.S.2
-
33
-
-
70349682579
-
Optimization of age replacement policy using reliability based heuristic model
-
Mahdavi, M. and Mahdavi, M., 2009. Optimization of age replacement policy using reliability based heuristic model. Journal of Scientific & Industrial Research, 68 (8), 668-673.
-
(2009)
Journal of Scientific & Industrial Research
, vol.68
, Issue.8
, pp. 668-673
-
-
Mahdavi, M.1
Mahdavi, M.2
-
34
-
-
0742319169
-
An efficient genetic algorithm for job shop scheduling with tardiness objectives
-
Mattfeld, D.C. and Bierwirth, C., 2004. An efficient genetic algorithm for job shop scheduling with tardiness objectives. European Journal of Operational Research, 155 (3), 616-630.
-
(2004)
European Journal of Operational Research
, vol.155
, Issue.3
, pp. 616-630
-
-
Mattfeld, D.C.1
Bierwirth, C.2
-
36
-
-
67649922887
-
Scheduling sequence-dependent setup time job shops with preventive maintenance
-
Naderi, B., Zandieh, M., and Fatemi Ghomi, S.M.T., 2009. Scheduling sequence-dependent setup time job shops with preventive maintenance. International Journal of Advanced Manufacturing Technology, 43 (1-2), 170-181.
-
(2009)
International Journal of Advanced Manufacturing Technology
, vol.43
, Issue.1-2
, pp. 170-181
-
-
Naderi, B.1
Zandieh, M.2
Fatemi Ghomi, S.M.T.3
-
37
-
-
0020699921
-
A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem
-
DOI 10.1016/0305-0483(83)90088-9
-
Nawaz, M., Enscore Jr., E., and Ham, I., 1983. A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem. Omega, The International Journal of Management Science, 11 (1), 91-95. (Pubitemid 13193807)
-
(1983)
Omega
, vol.11
, Issue.1
, pp. 91-95
-
-
Nawaz, M.1
Enscore Jr., E.E.2
Ham, I.3
-
38
-
-
33645260871
-
A case study of a multiobjective elitist recombinative genetic algorithm with coevolutionary sharing
-
In: P Angeline, ed Piscataway, NJ: IEEE Press
-
Neef, M., Thierens, D., and Arciszewski, H., 1999. A case study of a multiobjective elitist recombinative genetic algorithm with coevolutionary sharing. In: P Angeline, ed. Proceedings of the international congress on evolutionary computation. Piscataway, NJ: IEEE Press, 796-803.
-
(1999)
Proceedings of the International Congress on Evolutionary Computation
, pp. 796-803
-
-
Neef, M.1
Thierens, D.2
Arciszewski, H.3
-
40
-
-
9644307981
-
Implementation and benefits of introducing a computerised maintenance management system into a textile manufacturing company
-
O'Donoghue, C.D. and Prendergast, J.G., 2004. Implementation and benefits of introducing a computerised maintenance management system into a textile manufacturing company. Journal of Materials Processing Technology, 153-154, 226-232.
-
(2004)
Journal of Materials Processing Technology
, vol.153-154
, pp. 226-232
-
-
O'Donoghue, C.D.1
Prendergast, J.G.2
-
41
-
-
0035470170
-
Comparative evaluation of genetic algorithms for job-shop scheduling
-
DOI 10.1080/095372801750397680
-
Ponnambalam, S.G., Aravindan, P., and Sreenivasa Rao, P., 2001. Comparative evaluation of genetic algorithms for job-shop scheduling. Production Planning & Control, 12 (12), 560-574. (Pubitemid 35395059)
-
(2001)
Production Planning and Control
, vol.12
, Issue.6
, pp. 560-574
-
-
Ponnambalam, S.G.1
Aravindan, P.2
Sreenivasa Rao, P.3
-
42
-
-
34047122539
-
Considering scheduling and preventive maintenance in the flowshop sequencing problem
-
DOI 10.1016/j.cor.2005.12.007, PII S0305054805004041
-
Ruiz, R., Garcia-Diaz, C., and Maroto, C., 2007. Considering scheduling and preventive maintenance in the flowshop sequencing problem. Computers & Operations Research, 34 (11), 3314-330. (Pubitemid 46517859)
-
(2007)
Computers and Operations Research
, vol.34
, Issue.11
, pp. 3314-3330
-
-
Ruiz, R.1
Garcia-Diaz, C.2
Maroto, C.3
-
43
-
-
13444291361
-
Genetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine
-
DOI 10.1016/j.compind.2004.06.005, PII S0166361504000983, Applications of Genetic Algorithms in Industry
-
Sortrakul, N., Nachtmann, H.L., and Cassady, C.R., 2005. Genetic algorithms for integrated preventive maintenance planning and production scheduling for single machine. Computers in Industry, 56 (2), 161-168. (Pubitemid 40206234)
-
(2005)
Computers in Industry
, vol.56
, Issue.2
, pp. 161-168
-
-
Sortrakul, N.1
Nachtmann, H.L.2
Cassady, C.R.3
-
44
-
-
33947227221
-
Genetic algorithms for total weighted expected tardiness integrated preventive maintenance planning and production scheduling for a single machine
-
DOI 10.1108/13552510710735113
-
Sortrakul, N. and Cassady, C.R., 2007. Genetic algorithms for total weighted expected tardiness integrated preventive maintenance planning and production scheduling for a single machine. Journal of Quality in Maintenance Engineering, 13 (1), 49-61. (Pubitemid 46432522)
-
(2007)
Journal of Quality in Maintenance Engineering
, vol.13
, Issue.1
, pp. 49-61
-
-
Sortrakul, N.1
Cassady, C.R.2
-
45
-
-
0037118559
-
A survey of maintenance policies of deteriorating systems
-
DOI 10.1016/S0377-2217(01)00197-7, PII S0377221701001977
-
Wang, H., 2002. A survey of maintenance policies of deteriorating systems. European Journal of Operational Research, 139 (3), 469-489. (Pubitemid 34249626)
-
(2002)
European Journal of Operational Research
, vol.139
, Issue.3
, pp. 469-489
-
-
Wang, H.1
-
46
-
-
47049090055
-
A condition-based order-replacement policy for a single-unit system
-
Wang, L., Chu, J., and Mao, W., 2008. A condition-based order-replacement policy for a single-unit system. Applied Mathematical Modelling, 32 (11), 2274-2289.
-
(2008)
Applied Mathematical Modelling
, vol.32
, Issue.11
, pp. 2274-2289
-
-
Wang, L.1
Chu, J.2
Mao, W.3
-
47
-
-
33746267197
-
Heuristics for two-machine flowshop scheduling with setup times and an availability constraint
-
DOI 10.1016/j.cor.2005.05.003, PII S0305054805001516
-
Wang, X. and Cheng, T.C.E., 2007. Heuristics for two-machine flowshop scheduling with setup times and an availability constraint. Computers & Operations Research, 34 (1), 152-162. (Pubitemid 44093846)
-
(2007)
Computers and Operations Research
, vol.34
, Issue.1
, pp. 152-162
-
-
Wang, X.1
Edwin Cheng, T.C.2
-
48
-
-
0005495754
-
Highway maintenance scheduling using genetic algorithm with microscopic traffic simulation
-
13-17 January, Washington, DC, paper no. 02-2174
-
Wang, Y., Cheu, R.L., and Fwa, T.F., 2002. Highway maintenance scheduling using genetic algorithm with microscopic traffic simulation. In: Proceedings of the 81st annual meeting of the Transportation Research Board (TRB), 13-17 January, Washington, DC, paper no. 02-2174.
-
(2002)
Proceedings of the 81st Annual Meeting of the Transportation Research Board (TRB
-
-
Wang, Y.1
Cheu, R.L.2
Fwa, T.F.3
-
49
-
-
0031163852
-
A dynamic policy for grouping maintenance activities
-
PII S0377221797003190
-
Wildeman, R.E., Dekker, R., and Smit, A.C.J.M., 1997. A dynamic policy for grouping maintenance activities. European Journal of Operational Research, 99 (3), 530-551. (Pubitemid 127416269)
-
(1997)
European Journal of Operational Research
, vol.99
, Issue.3
, pp. 530-551
-
-
Wildeman, R.E.1
Dekker, R.2
Smit, A.C.J.M.3
-
51
-
-
1942457588
-
Genetic algorithms for job-shop scheduling problems
-
18-19 March, London, UK
-
Yamada, T. and Nakano, R., 1997. Genetic algorithms for job-shop scheduling problems. In: Proceedings of modern heuristic for decision support, 18-19 March, London, UK, 67-81.
-
(1997)
Proceedings of Modern Heuristic for Decision Support
, pp. 67-81
-
-
Yamada, T.1
Nakano, R.2
-
52
-
-
34250219585
-
A very fast TS/SA algorithm for the job shop scheduling problem
-
DOI 10.1016/j.cor.2006.02.024, PII S0305054806000670
-
Zhang, C.Y., et al., 2008. A very fast TS/SA algorithm for the job shop scheduling problem. Computers & Operations Research, 35 (1), 282-294. (Pubitemid 46899361)
-
(2008)
Computers and Operations Research
, vol.35
, Issue.1
, pp. 282-294
-
-
Zhang, C.Y.1
Li, P.2
Rao, Y.3
Guan, Z.4
-
53
-
-
38749084131
-
Minimizing the makespan for the MPM job-shop with availability constraints
-
DOI 10.1016/j.ijpe.2007.01.014, PII S092552730700134X
-
Zribi, N., El Kamel, A., and Borne, P., 2008. Minimizing the makespan for the MPM job-shop with availability constraints. International Journal of Production Economics, 112 (1), 151-160. (Pubitemid 351179597)
-
(2008)
International Journal of Production Economics
, vol.112
, Issue.1
, pp. 151-160
-
-
Zribi, N.1
El Kamel, A.2
Borne, P.3
|