메뉴 건너뛰기




Volumn 51, Issue 5-8, 2010, Pages 829-840

Minimizing the makespan and the system unavailability in parallel machine scheduling problem: A similarity-based genetic algorithm

Author keywords

Bi objective scheduling; Evolutionary algorithm; Preventive maintenance; Reliability; Unavailability

Indexed keywords

BI-OBJECTIVE SCHEDULING; ELITISM STRATEGY; JOINT PRODUCTION; MAINTENANCE ACTIVITY; MAINTENANCE INTERVALS; MAINTENANCE PROBLEM; MAKESPAN; PARALLEL MACHINE-SCHEDULING PROBLEMS; RELIABILITY MODEL; SIMILARITY MODELS; TEST INSTANCES; UNAVAILABILITY;

EID: 78650170970     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-010-2666-7     Document Type: Article
Times cited : (25)

References (34)
  • 1
    • 1842451621 scopus 로고    scopus 로고
    • On-line maintenance job scheduling and assignment to resources in distributed systems by heuristic-based optimization
    • 10.1023/B:JIMS.0000018029.60981.e6
    • KP Adzapka KH Adjallah F Yalaoui 2004 On-line maintenance job scheduling and assignment to resources in distributed systems by heuristic-based optimization J Intell Manuf 15 131 140 10.1023/B:JIMS.0000018029.60981.e6
    • (2004) J Intell Manuf , vol.15 , pp. 131-140
    • Adzapka, K.P.1    Adjallah, K.H.2    Yalaoui, F.3
  • 2
    • 33947276768 scopus 로고    scopus 로고
    • An integrated production and preventive maintenance planning model
    • DOI 10.1016/j.ejor.2006.06.032, PII S0377221706004693
    • EH Aghezzaf MA Jamali D Ait-Kadi 2007 An integrated production and preventive maintenance planning model Eur J Oper Res 181 2 679 685 1131.90334 10.1016/j.ejor.2006.06.032 (Pubitemid 46420747)
    • (2007) European Journal of Operational Research , vol.181 , Issue.2 , pp. 679-685
    • Aghezzaf, E.H.1    Jamali, M.A.2    Ait-Kadi, D.3
  • 5
    • 67749116576 scopus 로고    scopus 로고
    • Bi-objective optimization algorithms for joint production and maintenance scheduling: Application to the parallel machine problem
    • 10.1007/s10845-008-0113-5 10.1007/s10845-008-0113-5
    • A Berrichi L Amodeo F Yalaoui E Châtelet M Mezghiche 2008 Bi-objective optimization algorithms for joint production and maintenance scheduling: application to the parallel machine problem J Intell Manuf 20 389 400 10.1007/s10845-008-0113-5 10.1007/s10845-008-0113-5
    • (2008) J Intell Manuf , vol.20 , pp. 389-400
    • Berrichi, A.1    Amodeo, L.2    Yalaoui, F.3    Châtelet, E.4    Mezghiche, M.5
  • 6
    • 0038813446 scopus 로고    scopus 로고
    • Minimizing job tardiness using integrated preventive maintenance planning and production scheduling
    • 10.1080/07408170304416
    • CR Cassady E Kutanoglu 2003 Minimizing job tardiness using integrated preventive maintenance planning and production scheduling IEEE Trans 35 6 503 513 10.1080/07408170304416
    • (2003) IEEE Trans , vol.35 , Issue.6 , pp. 503-513
    • Cassady, C.R.1    Kutanoglu, E.2
  • 7
    • 22444439337 scopus 로고    scopus 로고
    • Integrating preventive maintenance planning and production scheduling for a single machine
    • DOI 10.1109/TR.2005.845967
    • CR Cassady E Kutanoglu 2005 Integrating preventive maintenance planning and production scheduling for a single machine IEEE Trans Reliab 54 2 304 309 10.1109/TR.2005.845967 (Pubitemid 41005032)
    • (2005) IEEE Transactions on Reliability , vol.54 , Issue.2 , pp. 304-309
    • Cassady, C.R.1    Kutanoglu, E.2
  • 8
    • 53749093234 scopus 로고    scopus 로고
    • The development of a sub-population genetic algorithm II (SPGA II) for multi-objective combinatorial problems
    • 10.1016/j.asoc.2008.04.002 2518196
    • PC Chang SH Chen 2009 The development of a sub-population genetic algorithm II (SPGA II) for multi-objective combinatorial problems Applied Soft Computing 9 173 181 10.1016/j.asoc.2008.04.002 2518196
    • (2009) Applied Soft Computing , vol.9 , pp. 173-181
    • Chang, P.C.1    Chen, S.H.2
  • 9
    • 1642603342 scopus 로고    scopus 로고
    • Analysis of a production/inventory system with randomly failing production unit submitted to regular preventive maintenance
    • 1107.90337 10.1016/S0377-2217(03)00254-6 2044858
    • A Chelbi D Ait-Kadi 2004 Analysis of a production/inventory system with randomly failing production unit submitted to regular preventive maintenance Eur J Oper Res 156 3 712 718 1107.90337 10.1016/S0377-2217(03)00254-6 2044858
    • (2004) Eur J Oper Res , vol.156 , Issue.3 , pp. 712-718
    • Chelbi, A.1    Ait-Kadi, D.2
  • 11
    • 35248897594 scopus 로고    scopus 로고
    • The measure of Pareto optima, applications to the multi-objective metaheuristics
    • 10.1007/3-540-36970-8-37
    • M Fleischer 2003 The measure of Pareto optima, applications to the multi-objective metaheuristics Lect Notes Comput Sci, Springer (EMO'03) 2632 519 533 10.1007/3-540-36970-8-37
    • (2003) Lect Notes Comput Sci, Springer (EMO'03) , vol.2632 , pp. 519-533
    • Fleischer, M.1
  • 13
    • 15344350551 scopus 로고    scopus 로고
    • Maintenance scheduling and production control of multiple-machine manufacturing systems
    • DOI 10.1016/j.cie.2004.12.007, PII S0360835204001858, Selected Papers from the 30th International Conference on Computers and Industrial Engineering
    • A Gharbi JP Kenne 2005 Maintenance scheduling and production control of multiple-machine manufacturing systems Comput Ind Eng 48 4 693 707 10.1016/j.cie.2004.12.007 (Pubitemid 40391491)
    • (2005) Computers and Industrial Engineering , vol.48 , Issue.4 , pp. 693-707
    • Gharbi, A.1    Kenne, J.-P.2
  • 14
    • 0033102020 scopus 로고    scopus 로고
    • Deterministic job-shop scheduling: Past, present and future
    • 0938.90028 10.1016/S0377-2217(98)00113-1
    • AS Jain S Meeran 1999 Deterministic job-shop scheduling: past, present and future Eur J Oper Res 113 2 390 434 0938.90028 10.1016/S0377-2217(98)00113-1
    • (1999) Eur J Oper Res , vol.113 , Issue.2 , pp. 390-434
    • Jain, A.S.1    Meeran, S.2
  • 15
  • 17
    • 33750995575 scopus 로고    scopus 로고
    • Age-dependent production planning and maintenance strategies in unreliable manufacturing systems with lost sale
    • DOI 10.1016/j.ejor.2006.01.029, PII S0377221706000695
    • JP Kenne A Gharbi M Beit 2007 Age-dependent production planning and maintenance strategies in unreliable manufacturing systems with lost sale Eur J Oper Res 178 2 408 420 1107.90012 10.1016/j.ejor.2006.01.029 (Pubitemid 44750478)
    • (2007) European Journal of Operational Research , vol.178 , Issue.2 , pp. 408-420
    • Kenne, J.-P.1    Gharbi, A.2    Beit, M.3
  • 18
    • 0000541519 scopus 로고    scopus 로고
    • Machine scheduling with an availability constraint
    • 0870.90071 10.1007/BF00121681
    • C-Y Lee 1996 Machine scheduling with an availability constraint J Glob Optim 9 395 416 0870.90071 10.1007/BF00121681
    • (1996) J Glob Optim , vol.9 , pp. 395-416
    • Lee, C.-Y.1
  • 19
    • 0034159705 scopus 로고    scopus 로고
    • Scheduling jobs and maintenance activities on parallel machines
    • DOI 10.1002/(SICI)1520-6750(200003)47:2<145::AID-NAV5>3.0.CO;2-3
    • CY Lee ZL Chen 2000 Scheduling jobs and maintenance activities on parallel machines Nav Res Logist 47 2 145 165 0973.90034 10.1002/(SICI)1520- 6750(200003)47:2<145::AID-NAV5>3.0.CO;2-3 1739551 (Pubitemid 30563276)
    • (2000) Naval Research Logistics , vol.47 , Issue.2 , pp. 145-165
    • Lee, C.-Y.1    Chen, Z.-L.2
  • 20
    • 0000700371 scopus 로고
    • Maintenance policies for stochastically failing equipment: A survey
    • 10.1287/mnsc.11.5.493 174385
    • JJ McCall 1965 Maintenance policies for stochastically failing equipment: a survey Manage Sci 11 493 524 10.1287/mnsc.11.5.493 174385
    • (1965) Manage Sci , vol.11 , pp. 493-524
    • McCall, J.J.1
  • 22
    • 0030575689 scopus 로고    scopus 로고
    • Imperfect maintenance
    • 0953.90506
    • H Pham HZ Wang 1996 Imperfect maintenance Eur J Oper Res 94 3 425 438 0953.90506
    • (1996) Eur J Oper Res , vol.94 , Issue.3 , pp. 425-438
    • Pham, H.1    Wang, H.Z.2
  • 25
    • 0033446820 scopus 로고    scopus 로고
    • Scheduling the maintenance on single machine
    • 1054.90550
    • X Qi T Chen F Tu 1999 Scheduling the maintenance on single machine J Oper Res Soc 50 10 1071 1078 1054.90550
    • (1999) J Oper Res Soc , vol.50 , Issue.10 , pp. 1071-1078
    • Qi, X.1    Chen, T.2    Tu, F.3
  • 26
    • 34047122539 scopus 로고    scopus 로고
    • Considering scheduling and preventive maintenance in the flowshop sequencing problem
    • DOI 10.1016/j.cor.2005.12.007, PII S0305054805004041
    • R Ruiz JC García-Diaz C Maroto 2007 Considering scheduling and preventive maintenance in the flow-shop sequencing problem Comput Oper Res 34 11 3314 3330 1128.90031 10.1016/j.cor.2005.12.007 (Pubitemid 46517859)
    • (2007) Computers and Operations Research , vol.34 , Issue.11 , pp. 3314-3330
    • Ruiz, R.1    Carlos Garcia-Diaz, J.2    Maroto, C.3
  • 27
    • 0343963100 scopus 로고    scopus 로고
    • Scheduling with limited machine availability
    • DOI 10.1016/S0377-2217(98)00367-1
    • G Schmidt 2000 Scheduling with limited machine availability Eur J Oper Res 121 1 15 0959.90023 10.1016/S0377-2217(98)00367-1 (Pubitemid 30546340)
    • (2000) European Journal of Operational Research , vol.121 , Issue.1 , pp. 1-15
    • Schmidt, G.1
  • 28
    • 0019546385 scopus 로고
    • Optimal maintenance models for systems subject to failure-a review
    • 0453.90034 10.1002/nav.3800280104 610718
    • YS Sherif ML Smith 1981 Optimal maintenance models for systems subject to failure-a review Nav Res Logist 28 1 47 74 0453.90034 10.1002/nav.3800280104 610718
    • (1981) Nav Res Logist , vol.28 , Issue.1 , pp. 47-74
    • Sherif, Y.S.1    Smith, M.L.2
  • 30
    • 0037118559 scopus 로고    scopus 로고
    • A survey of maintenance policies of deteriorating systems
    • DOI 10.1016/S0377-2217(01)00197-7, PII S0377221701001977
    • HZ Wang 2002 A survey of maintenance policies of deteriorating systems Eur J Oper Res 139 3 469 489 0995.90020 10.1016/S0377-2217(01)00197-7 (Pubitemid 34249626)
    • (2002) European Journal of Operational Research , vol.139 , Issue.3 , pp. 469-489
    • Wang, H.1
  • 31
    • 0033198250 scopus 로고    scopus 로고
    • Integrating maintenance and production decisions in a hierarchical production planning environment
    • DOI 10.1016/S0305-0548(99)00022-2, PII S0305054899000222
    • L Weinstein CH Chung 1999 Integrated maintenance and production decisions in hierarchical production planning environment Comput Oper Res 26 1059 1074 0938.90023 10.1016/S0305-0548(99)00022-2 (Pubitemid 29346433)
    • (1999) Computers and Operations Research , vol.26 , Issue.10-11 , pp. 1059-1074
    • Weinstein, L.1    Chung, C.-H.2
  • 32
    • 34548655710 scopus 로고    scopus 로고
    • Parallel machine scheduling with almost periodic maintenance and non-preemptive jobs to minimize makespan
    • DOI 10.1016/j.cor.2006.08.015, PII S0305054806002036
    • D Xu K Sun H Li 2008 Parallel machine scheduling with almost periodic non-preemptive maintenance and jobs to minimize makespan Comput Oper Res 35 1344 1349 1171.90411 10.1016/j.cor.2006.08.015 2578061 (Pubitemid 47404774)
    • (2008) Computers and Operations Research , vol.35 , Issue.4 , pp. 1344-1349
    • Xu, D.H.1    Sun, K.B.2    Li, H.X.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.