메뉴 건너뛰기




Volumn 20, Issue 4, 2009, Pages 421-429

Evolving CBR and data segmentation by SOM for flow time prediction in semiconductor manufacturing factory

Author keywords

Case based reasoning; Due date assignment; Flow time prediction; Genetic algorithms; Self organizing map

Indexed keywords

CBR; DATA SEGMENTATION; DUE-DATE ASSIGNMENT; FLOW TIME PREDICTION; FLOW TIME PREDICTIONS; FLOW-TIME; HYBRID APPROACH; INPUT VARIABLES; PRODUCTION PROCESS; SEMICONDUCTOR MANUFACTURING; SHOP FLOOR; SIMULATED DATA; SIMULATION MODEL; WAFER FAB;

EID: 67749106612     PISSN: 09565515     EISSN: 15728145     Source Type: Journal    
DOI: 10.1007/s10845-008-0116-2     Document Type: Article
Times cited : (12)

References (37)
  • 1
    • 0022767891 scopus 로고
    • A multivariate approach to estimating the completion time for PERT networks
    • K.P. Anklesaria Z. Drezner 1986 A multivariate approach to estimating the completion time for PERT networks Journal of the Operational Research Society 37 8 811 815
    • (1986) Journal of the Operational Research Society , vol.37 , Issue.8 , pp. 811-815
    • Anklesaria, K.P.1    Drezner, Z.2
  • 4
    • 0037381038 scopus 로고    scopus 로고
    • Support vector machines experts for time series forecasting
    • L. Cao 2003 Support vector machines experts for time series forecasting Neurocomputing 51 321 339
    • (2003) Neurocomputing , vol.51 , pp. 321-339
    • Cao, L.1
  • 6
    • 0037546939 scopus 로고    scopus 로고
    • A neural networks approach for due date assignment in a wafer fabrication factory
    • P.C. Chang J.C. Hsieh 2003 A neural networks approach for due date assignment in a wafer fabrication factory International Journal of Industrial Engineering 10 55 61
    • (2003) International Journal of Industrial Engineering , vol.10 , pp. 55-61
    • Chang, P.C.1    Hsieh, J.C.2
  • 7
    • 67749133834 scopus 로고    scopus 로고
    • A case-based reasoning approach for due-date assignment in a wafer fabrication factory
    • P.C. Chang J.C. Hsieh T.W. Liao 2001 A case-based reasoning approach for due-date assignment in a wafer fabrication factory Lecture Notes in Computer Science 2080 648 659
    • (2001) Lecture Notes in Computer Science , vol.2080 , pp. 648-659
    • Chang, P.C.1    Hsieh, J.C.2    Liao, T.W.3
  • 8
    • 23044463387 scopus 로고    scopus 로고
    • Evolving fuzzy rules for due-date assignment problem in semiconductor manufacturing factory
    • P.C. Chang J.C. Hsieh T.W. Liao 2005 Evolving fuzzy rules for due-date assignment problem in semiconductor manufacturing factory Journal of Intelligent Manufacturing 16 5 549 557
    • (2005) Journal of Intelligent Manufacturing , vol.16 , Issue.5 , pp. 549-557
    • Chang, P.C.1    Hsieh, J.C.2    Liao, T.W.3
  • 9
    • 16244381765 scopus 로고    scopus 로고
    • A hybrid system combining self-organizing maps with case-based reasoning in wholesaler's new-release book forecasting
    • P.C. Chang C.Y. Lai 2005 A hybrid system combining self-organizing maps with case-based reasoning in wholesaler's new-release book forecasting Expert Systems with Applications 29 1 183 192
    • (2005) Expert Systems with Applications , vol.29 , Issue.1 , pp. 183-192
    • Chang, P.C.1    Lai, C.Y.2
  • 10
    • 30344446393 scopus 로고    scopus 로고
    • Combing SOM and fuzzy rule base for flow time prediction in semiconductor manufacturing factory
    • P.C. Chang T.W. Liao 2006 Combing SOM and fuzzy rule base for flow time prediction in semiconductor manufacturing factory Applied Soft Computing 6 2 198 206
    • (2006) Applied Soft Computing , vol.6 , Issue.2 , pp. 198-206
    • Chang, P.C.1    Liao, T.W.2
  • 11
    • 36249015854 scopus 로고    scopus 로고
    • A fuzzy neural network for the flow time estimation in a semiconductor manufacturing factory
    • P.C. Chang Y.W. Wang C.J. Ting 2008 A fuzzy neural network for the flow time estimation in a semiconductor manufacturing factory International Journal of Production Research 46 4 1017 1029
    • (2008) International Journal of Production Research , vol.46 , Issue.4 , pp. 1017-1029
    • Chang, P.C.1    Wang, Y.W.2    Ting, C.J.3
  • 12
    • 33750566327 scopus 로고    scopus 로고
    • A hybrid SOM-BPN approach to lot output time prediction in a wafer fab
    • DOI 10.1007/s11063-006-9027-4
    • T. Chen 2006 A hybrid SOM-BPN approach to lot output time prediction in a wafer fab Neural Processing Letters 24 3 271 288 (Pubitemid 44673847)
    • (2006) Neural Processing Letters , vol.24 , Issue.3 , pp. 271-288
    • Chen, T.1
  • 13
    • 33846817362 scopus 로고    scopus 로고
    • An intelligent hybrid system for wafer lot output time prediction
    • T. Chen 2007 An intelligent hybrid system for wafer lot output time prediction Advanced Engineering Informatics 21 55 65
    • (2007) Advanced Engineering Informatics , vol.21 , pp. 55-65
    • Chen, T.1
  • 15
    • 59549090593 scopus 로고    scopus 로고
    • A fuzzy-neural approach with BPN post-classification for job completion time prediction in a semiconductor fabrication plant
    • T. Chen 2007 A fuzzy-neural approach with BPN post-classification for job completion time prediction in a semiconductor fabrication plant Advances in Soft Computing 41 580 589
    • (2007) Advances in Soft Computing , vol.41 , pp. 580-589
    • Chen, T.1
  • 16
    • 0035563133 scopus 로고    scopus 로고
    • Case-based reasoning system and artificial neural networks: A review
    • D. Chen P. Burrell 2001 Case-based reasoning system and artificial neural networks: A review Neural Computing & Applications 10 264 276
    • (2001) Neural Computing & Applications , vol.10 , pp. 264-276
    • Chen, D.1    Burrell, P.2
  • 17
    • 0037699752 scopus 로고
    • Survey of scheduling research involving due-date determination decisions
    • T.C. Cheng E. Gupta 1985 Survey of scheduling research involving due-date determination decisions European Journal of Operational Research 36 11 1017 1026
    • (1985) European Journal of Operational Research , vol.36 , Issue.11 , pp. 1017-1026
    • Cheng, T.C.1    Gupta, E.2
  • 18
    • 33745210168 scopus 로고    scopus 로고
    • A hybrid approach of neural networks and grey modeling for adaptive electricity load forecasting
    • C.C Chiang M.C. Ho J.A. Chen 2006 A hybrid approach of neural networks and grey modeling for adaptive electricity load forecasting Neural Computing & Applications 15 3-4 328 338
    • (2006) Neural Computing & Applications , vol.15 , Issue.34 , pp. 328-338
    • Chiang, C.C.1    Ho, M.C.2    Chen, J.A.3
  • 19
    • 0041732089 scopus 로고    scopus 로고
    • A case-based expert support system for due date assignment in a wafer fabrication factory
    • C.C. Chiu P.C. Chang N.H. Chiu 2003 A case-based expert support system for due date assignment in a wafer fabrication factory Journal of Intelligent Manufacturing 14 287 296
    • (2003) Journal of Intelligent Manufacturing , vol.14 , pp. 287-296
    • Chiu, C.C.1    Chang, P.C.2    Chiu, N.H.3
  • 23
    • 0037191007 scopus 로고    scopus 로고
    • Short-term load forecasting based on artificial neural networks parallel implementation
    • K. Kalaitzakis G.S. Stavrakakis E.M. Anagnostakis 2002 Short-term load forecasting based on artificial neural networks parallel implementation Electric Power Systems Research 63 3 185 196
    • (2002) Electric Power Systems Research , vol.63 , Issue.3 , pp. 185-196
    • Kalaitzakis, K.1    Stavrakakis, G.S.2    Anagnostakis, E.M.3
  • 24
    • 0036027191 scopus 로고    scopus 로고
    • Forecasting financial time series using neural network and fuzzy system-based techniques
    • V. Kodogiannis A. Lolis 2002 Forecasting financial time series using neural network and fuzzy system-based techniques Neural Computing & Applications 11 2 90 102
    • (2002) Neural Computing & Applications , vol.11 , Issue.2 , pp. 90-102
    • Kodogiannis, V.1    Lolis, A.2
  • 25
    • 33746475212 scopus 로고    scopus 로고
    • Time-series modeling of fishery landings using ARIMA models and fuzzy expected intervals software
    • T. Koutroumanidis L. Iliadis G.K. Sylaios 2006 Time-series modeling of fishery landings using ARIMA models and fuzzy expected intervals software Environmental Modelling and Software 21 12 1711 1721
    • (2006) Environmental Modelling and Software , vol.21 , Issue.12 , pp. 1711-1721
    • Koutroumanidis, T.1    Iliadis, L.2    Sylaios, G.K.3
  • 26
    • 33644984844 scopus 로고    scopus 로고
    • A self-adaptive neural fuzzy network with group-based symbiotic evolution and its prediction applications
    • C.J. Lin Y.J. Xu 2006 A self-adaptive neural fuzzy network with group-based symbiotic evolution and its prediction applications Fuzzy Sets and Systems 157 8 1036 1056
    • (2006) Fuzzy Sets and Systems , vol.157 , Issue.8 , pp. 1036-1056
    • Lin, C.J.1    Xu, Y.J.2
  • 27
    • 0032852347 scopus 로고    scopus 로고
    • Time-series forecasting through wavelets transformation and a mixture of expert models
    • R.L. Milidiú R.J. Machado R.P. Rentería 1999 Time-series forecasting through wavelets transformation and a mixture of expert models Neurocomputing 28 1-3 145 156
    • (1999) Neurocomputing , vol.28 , Issue.13 , pp. 145-156
    • Milidiú, R.L.1    Machado, R.J.2    Rentería, R.P.3
  • 28
    • 0031078573 scopus 로고    scopus 로고
    • Cost-based due date assignment with the use of classical and neural network approaches
    • P.R. Philipoom L. Wiegmann L.P. Rees 1997 Cost-based due date assignment with the use of classical and neural network approaches Naval Research Logistics 44 21 46
    • (1997) Naval Research Logistics , vol.44 , pp. 21-46
    • Philipoom, P.R.1    Wiegmann, L.2    Rees, L.P.3
  • 29
    • 0032749972 scopus 로고
    • Theory and methodology financial credit-risk evaluation with neural and euralfuzzy systems
    • S. Piramuthu 1991 Theory and methodology financial credit-risk evaluation with neural and euralfuzzy systems European Journal of Operational Research 112 310 332
    • (1991) European Journal of Operational Research , vol.112 , pp. 310-332
    • Piramuthu, S.1
  • 30
    • 0033891504 scopus 로고    scopus 로고
    • Project duration in stochastic networks by the PERT-Path technique
    • P. Pontrandolfo 2000 Project duration in stochastic networks by the PERT-Path technique International Journal of Project Management 18 215 222
    • (2000) International Journal of Project Management , vol.18 , pp. 215-222
    • Pontrandolfo, P.1
  • 33
    • 2342652840 scopus 로고    scopus 로고
    • Combinatorial time series forecasting based on clustering algorithms and neural networks
    • A. Sfetsos C. Siriopoulos 2004 Combinatorial time series forecasting based on clustering algorithms and neural networks Neural Computing & Applications 13 56 64
    • (2004) Neural Computing & Applications , vol.13 , pp. 56-64
    • Sfetsos, A.1    Siriopoulos, C.2
  • 36
    • 0018454859 scopus 로고
    • A simulation study of predictable due-dates
    • J.K. Weeks 1979 A simulation study of predictable due-dates Management Science 25 363 373
    • (1979) Management Science , vol.25 , pp. 363-373
    • Weeks, J.K.1
  • 37
    • 0023558979 scopus 로고
    • Stochastic lead-times in two-level assembly systems
    • C.A. Yano 1987 Stochastic lead-times in two-level assembly systems IIE Transactions 19 4 371 378
    • (1987) IIE Transactions , vol.19 , Issue.4 , pp. 371-378
    • Yano, C.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.