메뉴 건너뛰기




Volumn 2012, Issue , 2012, Pages

Simplifying multiproject scheduling problem based on design structure matrix and its solution by an improved aiNet algorithm

Author keywords

[No Author keywords available]

Indexed keywords


EID: 84862271861     PISSN: 10260226     EISSN: 1607887X     Source Type: Journal    
DOI: 10.1155/2012/713740     Document Type: Article
Times cited : (13)

References (27)
  • 1
    • 40849142091 scopus 로고    scopus 로고
    • A genetic algorithm for the resource constrained multi-project scheduling problem
    • DOI 10.1016/j.ejor.2006.06.074, PII S0377221707005929
    • Gonalves J. F., Mendes J. J. M., Resende M. G. C., A genetic algorithm for the resource constrained multi-project scheduling problem European Journal of Operational Research 2008 189 3 1171 1190 (Pubitemid 351400562)
    • (2008) European Journal of Operational Research , vol.189 , Issue.3 , pp. 1171-1190
    • Goncalves, J.F.1    Mendes, J.J.M.2    Resende, M.G.C.3
  • 2
    • 0033311742 scopus 로고    scopus 로고
    • Multi-mode resource-constrained project scheduling problem with generalized precedence relations
    • DOI 10.1016/S0377-2217(99)00151-4
    • De Reyck B., Herroelen W., Multi-mode resource-constrained project scheduling problem with generalized precedence relations European Journal of Operational Research 1999 119 2 538 556 (Pubitemid 30518405)
    • (1999) European Journal of Operational Research , vol.119 , Issue.2 , pp. 538-556
    • De Reyck, B.1    Herroelen, W.2
  • 3
    • 0019342681 scopus 로고
    • Scheduling subject to resource constraints: Classification and complexity
    • Baewicz J., Lenstra J. K., Rinnooy Kan A. H. G., Scheduling subject to resource constraints: classification and complexity Discrete Applied Mathematics 1983 5 1 11 24
    • (1983) Discrete Applied Mathematics , vol.5 , Issue.1 , pp. 11-24
    • Baewicz, J.1    Lenstra, J.K.2    Rinnooy Kan, A.H.G.3
  • 4
    • 0018011301 scopus 로고
    • Multiple resource-constrained scheduling using branch and bound
    • Stinson J. P., Davis E. W., Khumawala B. M., Multiple resource-constrained scheduling using branch and bound AIIE Trans 1978 10 3 252 259
    • (1978) AIIE Trans , vol.10 , Issue.3 , pp. 252-259
    • Stinson, J.P.1    Davis, E.W.2    Khumawala, B.M.3
  • 5
    • 0023362513 scopus 로고
    • Project scheduling with resource constraints: A branch and bound approach
    • DOI 10.1016/0377-2217(87)90240-2
    • Christofides N., lvarez-Valdés R., Tamarit J. M., Project scheduling with resource constraints: a branch and bound approach European Journal of Operational Research 1987 29 3 262 273 (Pubitemid 17598425)
    • (1987) European Journal of Operational Research , vol.29 , Issue.3 , pp. 262-273
    • Christofides Nicos1    Alvarez-Valdes, R.2    Tamarit, J.M.3
  • 6
    • 0002907360 scopus 로고
    • A branch and bound procedure for the multiple resource-constrained project scheduling problem
    • Demeulemeester E. L., Herroelen W., A branch and bound procedure for the multiple resource-constrained project scheduling problem Management Science 1992 38 12 1803 1818
    • (1992) Management Science , vol.38 , Issue.12 , pp. 1803-1818
    • Demeulemeester, E.L.1    Herroelen, W.2
  • 8
    • 40249114872 scopus 로고    scopus 로고
    • Augmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problem
    • DOI 10.1016/j.cor.2007.02.016, PII S0305054807000585
    • Xu N., McKee S. A., Nozick L. K., Ufomata R., Augmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problem Computers and Operations Research 2008 35 10 3284 3297 (Pubitemid 351335147)
    • (2008) Computers and Operations Research , vol.35 , Issue.10 , pp. 3284-3297
    • Xu, N.1    McKee, S.A.2    Nozick, L.K.3    Ufomata, R.4
  • 9
    • 78751634245 scopus 로고    scopus 로고
    • An Artificial Immune Algorithm for the project scheduling problem under resource constraints
    • Mobini M., Mobini Z., Rabbani M., An Artificial Immune Algorithm for the project scheduling problem under resource constraints Applied Soft Computing Journal 2011 11 2 1975 1982
    • (2011) Applied Soft Computing Journal , vol.11 , Issue.2 , pp. 1975-1982
    • Mobini, M.1    Mobini, Z.2    Rabbani, M.3
  • 10
    • 79954620287 scopus 로고    scopus 로고
    • On the performance of bee algorithms for resource-constrained project scheduling problem
    • Ziarati K., Akbari R., Zeighami V., On the performance of bee algorithms for resource-constrained project scheduling problem Applied Soft Computing Journal 2011 11 4 3720 3733
    • (2011) Applied Soft Computing Journal , vol.11 , Issue.4 , pp. 3720-3733
    • Ziarati, K.1    Akbari, R.2    Zeighami, V.3
  • 11
    • 0032096812 scopus 로고    scopus 로고
    • Optimization analysis for design and planning of multi-project programs
    • PII S0377221797003342
    • Wiley V. D., Deckro R. F., Jackson J. A., Optimization analysis for design and planning of multi-project programs European Journal of Operational Research 1998 107 2 492 506 (Pubitemid 128407558)
    • (1998) European Journal of Operational Research , vol.107 , Issue.2 , pp. 492-506
    • Wiley, V.D.1    Deckro, R.F.2    Jackson Jr., J.A.3
  • 12
    • 0035599853 scopus 로고    scopus 로고
    • Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling
    • Lova A., Tormos P., Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling Annals of Operations Research 2001 102 263 286
    • (2001) Annals of Operations Research , vol.102 , pp. 263-286
    • Lova, A.1    Tormos, P.2
  • 13
    • 77953684240 scopus 로고    scopus 로고
    • Resource-constrained multi-project scheduling: Priority rule performance revisited
    • Browning T. R., Yassine A. A., Resource-constrained multi-project scheduling: priority rule performance revisited International Journal of Production Economics 2010 126 2 212 228
    • (2010) International Journal of Production Economics , vol.126 , Issue.2 , pp. 212-228
    • Browning, T.R.1    Yassine, A.A.2
  • 14
    • 13444278798 scopus 로고    scopus 로고
    • Hybrid genetic algorithm with adaptive abilities for resource-constrained multiple project scheduling
    • DOI 10.1016/j.compind.2004.06.006, PII S0166361504000971, Applications of Genetic Algorithms in Industry
    • Kim K., Yun Y., Yoon J., Gen M., Yamazaki G., Hybrid genetic algorithm with adaptive abilities for resource-constrained multiple project scheduling Computers in Industry 2005 56 2 143 160 (Pubitemid 40206233)
    • (2005) Computers in Industry , vol.56 , Issue.2 , pp. 143-160
    • Kim, K.1    Yun, Y.2    Yoon, J.3    Gen, M.4    Yamazaki, G.5
  • 17
    • 40249098866 scopus 로고    scopus 로고
    • Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities
    • DOI 10.1007/s10951-007-0021-0
    • Lambrechts O., Demeulemeester E., Herroelen W., Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities Journal of Scheduling 2008 11 2 121 136 (Pubitemid 351334744)
    • (2008) Journal of Scheduling , vol.11 , Issue.2 , pp. 121-136
    • Lambrechts, O.1    Demeulemeester, E.2    Herroelen, W.3
  • 19
    • 0022025928 scopus 로고
    • Multi-project scheduling: Analysis of project performance
    • Kurtulus I. S., Narula S. C., Multi-project scheduling: analysis of project performance IIE Transactions 1985 17 1 58 66
    • (1985) IIE Transactions , vol.17 , Issue.1 , pp. 58-66
    • Kurtulus, I.S.1    Narula, S.C.2
  • 20
    • 0019597497 scopus 로고
    • The design structure system: A method for managing the design of complex systems
    • Steward D. V., The design structure system: a method for managing the design of complex systems IEEE Transactions on Engineering Management 1981 28 3 71 74
    • (1981) IEEE Transactions on Engineering Management , vol.28 , Issue.3 , pp. 71-74
    • Steward, D.V.1
  • 21
    • 44949197847 scopus 로고    scopus 로고
    • An integrated information system for product design planning
    • Hung H. F., Kao H. P., Juang Y. S., An integrated information system for product design planning Expert Systems with Applications 2008 35 1-2 338 349
    • (2008) Expert Systems with Applications , vol.35 , Issue.12 , pp. 338-349
    • Hung, H.F.1    Kao, H.P.2    Juang, Y.S.3
  • 22
    • 77949536438 scopus 로고    scopus 로고
    • Research on design structure matrix and its applications in product development and innovation: An overview
    • Xiao R., Chen T., Research on design structure matrix and its applications in product development and innovation: an overview International Journal of Computer Applications in Technology 2010 37 3-4 218 229
    • (2010) International Journal of Computer Applications in Technology , vol.37 , Issue.34 , pp. 218-229
    • Xiao, R.1    Chen, T.2
  • 23
    • 79956154381 scopus 로고    scopus 로고
    • Research on product development iterations based on feedback control theory in a dynamic environment
    • Xiao R., Chen T., Ju C., Research on product development iterations based on feedback control theory in a dynamic environment International Journal of Innovative Computing, Information and Control 2011 7 5 2669 2688
    • (2011) International Journal of Innovative Computing, Information and Control , vol.7 , Issue.5 , pp. 2669-2688
    • Xiao, R.1    Chen, T.2    Ju, C.3
  • 24
    • 0034559432 scopus 로고    scopus 로고
    • Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
    • Hartmann S., Kolisch R., Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem European Journal of Operational Research 2000 127 2 394 407
    • (2000) European Journal of Operational Research , vol.127 , Issue.2 , pp. 394-407
    • Hartmann, S.1    Kolisch, R.2
  • 25
    • 44649128530 scopus 로고    scopus 로고
    • A two-stage-priority-rule-based algorithm for robust resource-constrained project scheduling
    • Chtourou H., Haouari M., A two-stage-priority-rule-based algorithm for robust resource-constrained project scheduling Computers and Industrial Engineering 2008 55 1 183 194
    • (2008) Computers and Industrial Engineering , vol.55 , Issue.1 , pp. 183-194
    • Chtourou, H.1    Haouari, M.2
  • 27
    • 0000698758 scopus 로고
    • Characterization and generation of a general class of resource constrained project scheduling problems
    • Kolisch R., Sprecher A., Drexl A., Characterization and generation of a general class of resource constrained project scheduling problems Management Science 1995 41 10 1693 1703
    • (1995) Management Science , vol.41 , Issue.10 , pp. 1693-1703
    • Kolisch, R.1    Sprecher, A.2    Drexl, A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.