-
1
-
-
79952746014
-
A hierarchical approach to FMS planning and control with simulation-based capacity anticipation
-
DOI: 10.1080/00207543.2010.482570
-
Albey, E. and Bilge, U., 2010. A hierarchical approach to FMS planning and control with simulation-based capacity anticipation. International Journal of Production Research, DOI: 10.1080/00207543.2010.482570.
-
(2010)
International Journal of Production Research
-
-
Albey, E.1
Bilge, U.2
-
2
-
-
77955582592
-
The effect of routing flexibility on a flexible system of integrated manufacturing
-
Ali, M. and Wadhwa, S., 2010. The effect of routing flexibility on a flexible system of integrated manufacturing. International Journal of Production Research, 48 (19), 5691-5709.
-
(2010)
International Journal of Production Research
, vol.48
, Issue.19
, pp. 5691-5709
-
-
Ali, M.1
Wadhwa, S.2
-
3
-
-
4344715046
-
Framework for the control of automated material-handling systems
-
Babiceanu, R.F., Chen, F.F., and Struges, R.H., 2004. Framework for the control of automated material-handling systems. International Journal of Production Research, 42 (17), 3551-3564.
-
(2004)
International Journal of Production Research
, vol.42
, Issue.17
, pp. 3551-3564
-
-
Babiceanu, R.F.1
Chen, F.F.2
Struges, R.H.3
-
4
-
-
77953646625
-
Scheduling of machines and automated guided vehicles in FMS using differential evolution
-
Babu, A.G., et al., 2010. Scheduling of machines and automated guided vehicles in FMS using differential evolution. International Journal of Production Research, 48 (16), 4683-4699.
-
(2010)
International Journal of Production Research
, vol.48
, Issue.16
, pp. 4683-4699
-
-
Babu, A.G.1
-
6
-
-
0033207947
-
Toward the integration of flexible manufacturing system scheduling
-
Balogun, O.O. and Popplewell, K., 1999. Toward the integration of flexible manufacturing system scheduling. International Journal of Production Research, 37 (15), 3399-3428.
-
(1999)
International Journal of Production Research
, vol.37
, Issue.15
, pp. 3399-3428
-
-
Balogun, O.O.1
Popplewell, K.2
-
7
-
-
0000424475
-
Classification of flexible manufacturing systems
-
Browne, J., et al., 1984. Classification of flexible manufacturing systems. FMS magazine, 2 (2), 114-117.
-
(1984)
FMS magazine
, vol.2
, Issue.2
, pp. 114-117
-
-
Browne, J.1
-
8
-
-
32644482372
-
Performance-based dynamic scheduling model for flexible manufacturing systems
-
Buyurgan, N. and Mendoza, A., 2006. Performance-based dynamic scheduling model for flexible manufacturing systems. International Journal of Production Research, 44 (7), 1273-1295.
-
(2006)
International Journal of Production Research
, vol.44
, Issue.7
, pp. 1273-1295
-
-
Buyurgan, N.1
Mendoza, A.2
-
9
-
-
0037274883
-
Effects of dispatching and routing decisions on the performance of a flexible manufacturing system
-
Chan, F.T.S., 2003. Effects of dispatching and routing decisions on the performance of a flexible manufacturing system. International Journal of Advanced Manufacturing Technology, 21, 328-338.
-
(2003)
International Journal of Advanced Manufacturing Technology
, vol.21
, pp. 328-338
-
-
Chan, F.T.S.1
-
10
-
-
7044233479
-
Impact of operation flexibility and dispatching rules on the performance of a flexible manufacturing system
-
Chan, F.T.S., 2004. Impact of operation flexibility and dispatching rules on the performance of a flexible manufacturing system. International Journal of Advanced Manufacturing Technology, 24 (2), 447-459.
-
(2004)
International Journal of Advanced Manufacturing Technology
, vol.24
, Issue.2
, pp. 447-459
-
-
Chan, F.T.S.1
-
11
-
-
32644454569
-
Increase in flexibility: Productive or counterproductive? A study on the physical and operating characteristics of a flexible manufacturing system
-
Chan, F.T.S., Bhagwat, R., and Wadhwa, S., 2006. Increase in flexibility: productive or counterproductive? A study on the physical and operating characteristics of a flexible manufacturing system. International Journal of Production Research, 44 (7), 1431-1445.
-
(2006)
International Journal of Production Research
, vol.44
, Issue.7
, pp. 1431-1445
-
-
Chan, F.T.S.1
Bhagwat, R.2
Wadhwa, S.3
-
12
-
-
36248933733
-
Comparative performance analysis of a flexible manufacturing system (fms): A review-period-based control
-
Chan, F.T.S., Bhagwat, R., and Wadhwa, S., 2008. Comparative performance analysis of a flexible manufacturing system (FMS): a review-period-based control. International Journal of Production Research, 46 (1), 1-24.
-
(2008)
International Journal of Production Research
, vol.46
, Issue.1
, pp. 1-24
-
-
Chan, F.T.S.1
Bhagwat, R.2
Wadhwa, S.3
-
13
-
-
0036069575
-
The state of the art in simulation study on fms scheduling: A comprehensive survey
-
Chan, F.T.S., Chan, H.K., and Lau, H.C.W., 2002. The state of the art in simulation study on FMS scheduling: A comprehensive survey. International Journal of Advanced Manufacturing Technology, 19 (11), 830-849.
-
(2002)
International Journal of Advanced Manufacturing Technology
, vol.19
, Issue.11
, pp. 830-849
-
-
Chan, F.T.S.1
Chan, H.K.2
Lau, H.C.W.3
-
14
-
-
0026254174
-
Effects of loading and routing decisions on performances of flexible manufacturing systems
-
Chen, I.J. and Chung, C.H., 1991. Effects of loading and routing decisions on performances of flexible manufacturing systems. International Journal of Production Research, 29 (11), 2209-2225.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.11
, pp. 2209-2225
-
-
Chen, I.J.1
Chung, C.H.2
-
15
-
-
0142216504
-
Real-time scheduling with deadlock avoidance in flexible manufacturing systems
-
ElMekkawy, T.Y. and ElMaraghy, H.A., 2003. Real-time scheduling with deadlock avoidance in flexible manufacturing systems. International Journal of Advanced Manufacturing Technology, 22 (2), 259-270.
-
(2003)
International Journal of Advanced Manufacturing Technology
, vol.22
, Issue.2
, pp. 259-270
-
-
ElMekkawy, T.Y.1
ElMaraghy, H.A.2
-
16
-
-
0035149233
-
Performance analysis of a batch production system with limited flexibility
-
Garavelli, A.C., 2001. Performance analysis of a batch production system with limited flexibility. International Journal of Production Economics, 69 (1), 39-48.
-
(2001)
International Journal of Production Economics
, vol.69
, Issue.1
, pp. 39-48
-
-
Garavelli, A.C.1
-
17
-
-
0035521426
-
Generating experimental data for computational testing with machine scheduling applications
-
Hall, N.G. and Posner, M.E., 2001. Generating experimental data for computational testing with machine scheduling applications. Operations Research, 49 (7), 854-865.
-
(2001)
Operations Research
, vol.49
, Issue.7
, pp. 854-865
-
-
Hall, N.G.1
Posner, M.E.2
-
18
-
-
0028401319
-
Flexible process plans: Their value in flexible automation systems
-
Hutchinson, G.K. and Pflughoeft, K.A., 1994. Flexible process plans: their value in flexible automation systems. International Journal of Production Research, 32 (3), 707-719.
-
(1994)
International Journal of Production Research
, vol.32
, Issue.3
, pp. 707-719
-
-
Hutchinson, G.K.1
Pflughoeft, K.A.2
-
19
-
-
0002337285
-
A methodology for fitting and validating metamodels in simulation
-
Kleijnen, J.P.C. and Sargent, R.G., 2000. A methodology for fitting and validating metamodels in simulation. European Journal of Operational Research, 120 (1), 14-29.
-
(2000)
European Journal of Operational Research
, vol.120
, Issue.1
, pp. 14-29
-
-
Kleijnen, J.P.C.1
Sargent, R.G.2
-
21
-
-
33748694681
-
Using data continualization and expansion to improve small data set learning accuracy for early flexible manufacturing system (fms) scheduling
-
Li, D.C., Wu, C., and Chang, F.M., 2006. Using data continualization and expansion to improve small data set learning accuracy for early flexible manufacturing system (FMS) scheduling. International Journal of Production Research, 44 (21), 4491-4509.
-
(2006)
International Journal of Production Research
, vol.44
, Issue.21
, pp. 4491-4509
-
-
Li, D.C.1
Wu, C.2
Chang, F.M.3
-
22
-
-
0027541129
-
A new classification scheme for flexible manufacturing systems
-
MacCarthy, B.L. and Liu, J., 1993. A new classification scheme for flexible Manufacturing systems. International Journal of Production Research, 31 (2), 299-309.
-
(1993)
International Journal of Production Research
, vol.31
, Issue.2
, pp. 299-309
-
-
MacCarthy, B.L.1
Liu, J.2
-
24
-
-
74549114223
-
Scheduling flexible manufacturing cells using tabu search
-
Pitts Jr, R.A. and Ventura, J.A., 2009. Scheduling flexible manufacturing cells using Tabu Search. International Journal of Production Research, 47 (24), 6907-6928.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.24
, pp. 6907-6928
-
-
Pitts Jr., R.A.1
Ventura, J.A.2
-
25
-
-
84990578231
-
Scheduling with sequencing flexibility
-
Rachamadugu, R. and Schriber, T.J., 1993. Scheduling with sequencing flexibility. Decision Sciences, 24, 315-341.
-
(1993)
Decision Sciences
, vol.24
, pp. 315-341
-
-
Rachamadugu, R.1
Schriber, T.J.2
-
26
-
-
55349107273
-
An ism approach for modelling the enablers of flexible manufacturing system: The case for india
-
Raj, T., Shankar, R., and Suhaib, M., 2008. An ISM approach for modelling the enablers of flexible manufacturing system: The case for India. International Journal of Production Research, 46 (24), 6883-6912.
-
(2008)
International Journal of Production Research
, vol.46
, Issue.24
, pp. 6883-6912
-
-
Raj, T.1
Shankar, R.2
Suhaib, M.3
-
27
-
-
29444438437
-
Dynamic job shop scheduling: A survey of simulation research. Omega
-
Ramasesh, R., 1990. Dynamic job shop scheduling: a survey of simulation research. Omega, International Journal of Management Science, 18 (1), 43-57.
-
(1990)
International Journal of Management Science
, vol.18
, Issue.1
, pp. 43-57
-
-
Ramasesh, R.1
-
28
-
-
1442285828
-
Dynamic rescheduling that simultaneously considers efficiency and stability
-
Rangsaritratsamee, R., Ferrell Jr, W.G., and Kurz, M.B., 2004. Dynamic rescheduling that simultaneously considers efficiency and stability. Computers and Industrial Engineering, 46 (1), 1-15.
-
(2004)
Computers and Industrial Engineering
, vol.46
, Issue.1
, pp. 1-15
-
-
Rangsaritratsamee, R.1
Ferrell Jr., W.G.2
Kurz, M.B.3
-
29
-
-
58449125596
-
Evidence in management and organizational science: Assembling the field's full weight of scientific knowledge through syntheses
-
Rousseau, D.M., Manning, J., and Denyer, D., 2008. Evidence in management and organizational science: assembling the field's full weight of scientific knowledge through syntheses. The Academy of Management Annals, 2 (1), 475-515.
-
(2008)
The Academy of Management Annals
, vol.2
, Issue.1
, pp. 475-515
-
-
Rousseau, D.M.1
Manning, J.2
Denyer, D.3
-
30
-
-
78650601922
-
Agent-supported simulation environment for intelligent manufacturing and warehouse management systems
-
Ruiz, N., et al., 2011. Agent-supported simulation environment for intelligent manufacturing and warehouse management systems. International Journal of Production Research, 49 (5), 1469-1482.
-
(2011)
International Journal of Production Research
, vol.49
, Issue.5
, pp. 1469-1482
-
-
Ruiz, N.1
-
31
-
-
0032000897
-
A study of scheduling rules of flexible manufacturing systems: A simulation approach
-
Sabuncuoglu, I., 1998. A Study of scheduling rules of flexible manufacturing systems: a simulation approach. International Journal of Production Research, 36 (2), 527-546.
-
(1998)
International Journal of Production Research
, vol.36
, Issue.2
, pp. 527-546
-
-
Sabuncuoglu, I.1
-
32
-
-
0035195362
-
Real-time manipulation of alternative routings in flexible manufacturing systems: A simulation study
-
Saygin, C., Chen, F.F., and Singh, J., 2001. Real-time manipulation of alternative routings in flexible manufacturing systems: a simulation study. International Journal of Advanced Manufacturing Technology, 18, 755-763.
-
(2001)
International Journal of Advanced Manufacturing Technology
, vol.18
, pp. 755-763
-
-
Saygin, C.1
Chen, F.F.2
Singh, J.3
-
34
-
-
34248539177
-
Flexibility in manufacturing: A survey
-
Sethi, A.K. and Sethi, S.P., 1990. Flexibility in manufacturing: a survey. International Journal of Flexible Manufacturing Systems, 2 (4), 289-328.
-
(1990)
International Journal of Flexible Manufacturing Systems
, vol.2
, Issue.4
, pp. 289-328
-
-
Sethi, A.K.1
Sethi, S.P.2
-
35
-
-
0022060472
-
A loading and dispatching problem in a random flexible manufacturing system
-
Shanker, K. and Tzen, Y., 1985. A loading and dispatching problem in a random flexible manufacturing system. International Journal of Production Research, 23 (3), 579-595.
-
(1985)
International Journal of Production Research
, vol.23
, Issue.3
, pp. 579-595
-
-
Shanker, K.1
Tzen, Y.2
-
36
-
-
78349282659
-
Methods for activating the decision-making process that is used for controlling flexible manufacturing systems
-
Shnits, B., 2010. Methods for activating the decision-making process that is used for controlling flexible manufacturing systems. International Journal of Production Research, 48 (24), 7437-7462.
-
(2010)
International Journal of Production Research
, vol.48
, Issue.24
, pp. 7437-7462
-
-
Shnits, B.1
-
37
-
-
4344584596
-
Multicriteria dynamic scheduling methodology for controlling a flexible manufacturing system
-
Shnits, B., Rubinovitz, J., and Sinreich, D., 2004. Multicriteria dynamic scheduling methodology for controlling a flexible manufacturing system. International Journal of Production Research, 42 (17), 3457-3472.
-
(2004)
International Journal of Production Research
, vol.42
, Issue.17
, pp. 3457-3472
-
-
Shnits, B.1
Rubinovitz, J.2
Sinreich, D.3
-
38
-
-
1342287300
-
Auction-based distributed scheduling and control scheme for flexible manufacturing systems
-
Siwamogsatham, T. and Saygin, C., 2004. Auction-based distributed scheduling and control scheme for flexible manufacturing systems. International Journal of Production Research, 42 (3), 547-572.
-
(2004)
International Journal of Production Research
, vol.42
, Issue.3
, pp. 547-572
-
-
Siwamogsatham, T.1
Saygin, C.2
-
39
-
-
33646394085
-
A fuzzy logic modeling of dynamic scheduling in fms
-
Srinoi, P., Shayan, E., and Ghotb, F., 2006. A fuzzy logic modeling of dynamic scheduling in FMS. International Journal of Production Research, 44 (11), 2183-2203.
-
(2006)
International Journal of Production Research
, vol.44
, Issue.11
, pp. 2183-2203
-
-
Srinoi, P.1
Shayan, E.2
Ghotb, F.3
-
40
-
-
34250111322
-
Design, planning, scheduling and control problems in flexible manufacturing systems
-
Stecke, K.E., 1985. Design, planning, scheduling and control problems in flexible manufacturing systems. Annals of Operations Research, 3 (1), 3-12.
-
(1985)
Annals of Operations Research
, vol.3
, Issue.1
, pp. 3-12
-
-
Stecke, K.E.1
-
41
-
-
0141888108
-
Towards a methodology for developing evidence-informed management knowledge by means of systematic review
-
Tranfield, D., Denyer, D., and Smart, P., 2003. Towards a methodology for developing evidence-informed management knowledge by means of systematic review. British Journal of Management, 14 (2), 207-222.
-
(2003)
British Journal of Management
, vol.14
, Issue.2
, pp. 207-222
-
-
Tranfield, D.1
Denyer, D.2
Smart, P.3
-
42
-
-
33847075096
-
Due date and cost-based fms loading, scheduling and tool management
-
Turkcan, A., Akturk, M.S., and Storer, R.H., 2007. Due date and cost-based FMS loading, scheduling and tool management. International Journal of Production Research, 45 (5), 1183-1213.
-
(2007)
International Journal of Production Research
, vol.45
, Issue.5
, pp. 1183-1213
-
-
Turkcan, A.1
Akturk, M.S.2
Storer, R.H.3
-
43
-
-
31744447420
-
Hybrid system dynamic discrete event simulation-based architecture for hierarchical production planning
-
Venkateswaran, J. and Son, Y.J., 2005. Hybrid system dynamic discrete event simulation-based architecture for hierarchical production planning. International Journal of Production Research, 43 (20), 4397-4429.
-
(2005)
International Journal of Production Research
, vol.43
, Issue.20
, pp. 4397-4429
-
-
Venkateswaran, J.1
Son, Y.J.2
-
45
-
-
27844521741
-
Flexibility-enabled lead-time reduction in flexible systems
-
Wadhwa, S., Rao, K.S., and Chan, F.T.S., 2005. Flexibility-enabled lead-time reduction in flexible systems. International Journal of Production Research, 43 (15), 3131-3162.
-
(2005)
International Journal of Production Research
, vol.43
, Issue.15
, pp. 3131-3162
-
-
Wadhwa, S.1
Rao, K.S.2
Chan, F.T.S.3
-
46
-
-
27944484417
-
Measuring machine and product mix flexibilities of a manufacturing system
-
Wahab, M.I.M., 2005. Measuring machine and product mix flexibilities of a manufacturing system. International Journal of Production Research, 43 (18), 3773-3786.
-
(2005)
International Journal of Production Research
, vol.43
, Issue.18
, pp. 3773-3786
-
-
Wahab, M.I.M.1
-
47
-
-
0028406902
-
Metamodels in manufacturing: A review
-
Yu, B. and Popplewell, K., 1994. Metamodels in manufacturing: A review. International Journal of Production Research, 32 (4), 787-796.
-
(1994)
International Journal of Production Research
, vol.32
, Issue.4
, pp. 787-796
-
-
Yu, B.1
Popplewell, K.2
|