메뉴 건너뛰기




Volumn 49, Issue 11, 2011, Pages 3319-3342

A hierarchical approach to FMS planning and control with simulation-based capacity anticipation

Author keywords

effective capacity anticipation; flexible manufacturing systems; FMS loading with alternative routing; hierarchical production planning; mathematical programming and simulation applications in FMS

Indexed keywords

CLOSED-LOOP STRUCTURES; DEMAND MIX; EFFECTIVE CAPACITY; FLEXIBLE PROCESS; FMS LOADING; HIERARCHICAL APPROACH; HIERARCHICAL PRODUCTION PLANNING; MANUFACTURING SYSTEM; PLANNING AND CONTROL; PRODUCTION PLANNING AND CONTROL; SIMULATION-BASED; THREE-LEVEL; WORK PIECES;

EID: 79952746014     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2010.482570     Document Type: Article
Times cited : (31)

References (42)
  • 3
    • 33144460387 scopus 로고    scopus 로고
    • Tractable nonlinear production planning models for semiconductor wafer fabrication facilities
    • DOI 10.1109/TSM.2005.863214
    • Asmundsson, J., Rardin, R., and Uzsoy, R., 2006. Tractable nonlinear production planning models for semiconductor wafer fabrication facilities. IEEE Transactions on Semiconductor Manufacturing, 19(1), 95-111. (Pubitemid 43269770)
    • (2006) IEEE Transactions on Semiconductor Manufacturing , vol.19 , Issue.1 , pp. 95-111
    • Asmundsson, J.1    Rardin, R.L.2    Uzsoy, R.3
  • 4
    • 0033328316 scopus 로고    scopus 로고
    • Generic model to solve tactical planning problems in flexible manufacturing systems
    • DOI 10.1023/A:1008182411581
    • Atlihan, M. K., Kayaligil, S., and Erkip, N., 1999. A generic model to solve tactical planning problems in flexible manufacturing systems. International Journal of Flexible Manufacturing Systems, 11(3), 215-243. (Pubitemid 30503696)
    • (1999) International Journal of Flexible Manufacturing Systems , vol.11 , Issue.3 , pp. 215-243
    • Atlihan, M.K.1    Kayaligil, S.2    Erkip, N.3
  • 5
    • 0023964013 scopus 로고
    • Batching and routing: Two functions in the operational planning of flexible manufacturing systems
    • Bastos, J. M., 1988. Batching and routing: Two functions in the operational planning of flexible manufacturing systems. European Journal of Operational Research, 33(3), 230-244.
    • (1988) European Journal of Operational Research , vol.33 , Issue.3 , pp. 230-244
    • Bastos, J.M.1
  • 6
    • 0030146089 scopus 로고    scopus 로고
    • Modelling, measurement and evaluation of sequencing flexibility in manufacturing systems
    • Benjaafar, S. and Ramakrishnan, R., 1996. Modelling, measurement and evaluation of sequencing flexibility in manufacturing systems. International Journal of Production Research, 34(5), 1195-1220.
    • (1996) International Journal of Production Research , vol.34 , Issue.5 , pp. 1195-1220
    • Benjaafar, S.1    Ramakrishnan, R.2
  • 9
    • 44649188498 scopus 로고    scopus 로고
    • A parametric fuzzy logic approach to dynamic part routing under full routing flexibility
    • Bilge, U., Firat, M., and Albey, E., 2008. A parametric fuzzy logic approach to dynamic part routing under full routing flexibility. Computers & Industrial Engineering, 55(1), 15-33.
    • (2008) Computers & Industrial Engineering , vol.55 , Issue.1 , pp. 15-33
    • Bilge, U.1    Firat, M.2    Albey, E.3
  • 10
    • 0032638699 scopus 로고    scopus 로고
    • Production planning using a hybrid simulation-analytical approach
    • Byrne, M. D. and Bakir, M. A., 1999. Production planning using a hybrid simulation-analytical approach. International Journal of Production Economics, 59 (1-3), 305-311.
    • (1999) International Journal of Production Economics , vol.59 , Issue.1-3 , pp. 305-311
    • Byrne, M.D.1    Bakir, M.A.2
  • 12
    • 77957063759 scopus 로고
    • Production planning model for a flexible manufacturing system
    • A. Raouf and M. Ben-Daya, eds, Netherlands: Elsevier, 157-171
    • Chandra, P., 1995. Production planning model for a flexible manufacturing system. In: A. Raouf and M. Ben-Daya, eds. Flexible manufacturing systems: recent developments. Netherlands: Elsevier, 157-171.
    • (1995) Flexible Manufacturing Systems: Recent Developments
    • Chandra, P.1
  • 13
    • 0006545347 scopus 로고
    • Building a short term production planning system for FMS: An integration viewpoint
    • Chung, S. H. and Chien, W. L., 1993. Building a short term production planning system for FMS: an integration viewpoint. Production Planning and Control, 4(2), 112-127.
    • (1993) Production Planning and Control , vol.4 , Issue.2 , pp. 112-127
    • Chung, S.H.1    Chien, W.L.2
  • 14
    • 0025595213 scopus 로고
    • A methodical approach to the flexiblemanufacturing-system batching, loading and tool configuration problems
    • Co, H. C., Biermann, J. S., and Chen, S. K., 1990. A methodical approach to the flexiblemanufacturing-system batching, loading and tool configuration problems. International Journal of Production Research, 28(12), 2171-2186.
    • (1990) International Journal of Production Research , vol.28 , Issue.12 , pp. 2171-2186
    • Co, H.C.1    Biermann, J.S.2    Chen, S.K.3
  • 15
    • 0031281696 scopus 로고    scopus 로고
    • Exact solution procedures for certain planning problems in flexible manufacturing systems
    • Denizel, M. and Erenguc, S. S., 1997. Exact solution procedures for certain planning problems in flexible manufacturing systems. Computers and Operations Research, 24(11), 1043-1055.
    • (1997) Computers and Operations Research , vol.24 , Issue.11 , pp. 1043-1055
    • Denizel, M.1    Erenguc, S.S.2
  • 16
    • 70449595592 scopus 로고    scopus 로고
    • Hierarchical production planning and scheduling in make to order environments: Reaching short and reliable delivery dates
    • Ebadian, M., et al., 2009. Hierarchical production planning and scheduling in make to order environments: reaching short and reliable delivery dates. International Journal of Production Research, 47(20), 5761-5789.
    • (2009) International Journal of Production Research , vol.47 , Issue.20 , pp. 5761-5789
    • Ebadian, M.1
  • 17
    • 0025843946 scopus 로고
    • Manufacturing capacity and its measurement. A critical evaluation
    • DOI 10.1016/0305-0548(91)90071-X
    • Elmaghraby, S., 1991. Manufacturing capacity and its measurement: a critical evaluation. Computers and Operations Research, 18(7), 615-627. (Pubitemid 21721965)
    • (1991) Computers and Operations Research , vol.18 , Issue.7 , pp. 615-627
    • Elmaghraby Salah, E.1
  • 19
    • 0022741221 scopus 로고
    • A tactical planning model for a job shop
    • Graves, S. C., 1986. A tactical planning model for a job shop. Operations Research, 34(4), 522-533.
    • (1986) Operations Research , vol.34 , Issue.4 , pp. 522-533
    • Graves, S.C.1
  • 21
    • 0032639332 scopus 로고    scopus 로고
    • Machine loading and part type selection in flexible manufacturing systems
    • Guerrero, F., 1999. Machine loading and part type selection in flexible manufacturing systems. International Journal of Production Research, 37(6), 1303-1317.
    • (1999) International Journal of Production Research , vol.37 , Issue.6 , pp. 1303-1317
    • Guerrero, F.1
  • 22
    • 0002957476 scopus 로고
    • Hierarchical integration of production planning and scheduling; studies in management sciences
    • M. A. Geisler, ed, New York: North Holland-American Elsevier
    • Hax, A. C. and Meal, H. C., 1975. Hierarchical integration of production planning and scheduling; studies in management sciences. In: M. A. Geisler, ed. Logistics. New York: North Holland-American Elsevier.
    • (1975) Logistics
    • Hax, A.C.1    Meal, H.C.2
  • 23
    • 0030150549 scopus 로고    scopus 로고
    • A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations
    • PII S0894650796032678
    • Hung, Y. F. and Leachman, R. C., 1996. A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations. IEEE Transactions on Semiconductor Manufacturing, 9(2), 257-269. (Pubitemid 126774120)
    • (1996) IEEE Transactions on Semiconductor Manufacturing , vol.9 , Issue.2 , pp. 257-269
    • Hung, Y.-F.1    Leachman, R.C.2
  • 24
    • 33144460286 scopus 로고    scopus 로고
    • West Lafayette: Laboratory for Extended Enterprises at Purdue, School of Industrial Engineering, Purdue University, Technical report
    • Hwang, S. and Uzsoy, R., 2005. A single stage multi product dynamic lot sizing model with WIP and congestion. West Lafayette: Laboratory for Extended Enterprises at Purdue, School of Industrial Engineering, Purdue University, Technical report.
    • (2005) A Single Stage Multi Product Dynamic Lot Sizing Model with WIP and Congestion
    • Hwang, S.1    Uzsoy, R.2
  • 25
    • 60749134984 scopus 로고    scopus 로고
    • An experimental study of an interative simulationoptimization algorithm for production planning
    • S. J. Mason, R. R. Hill, L. Monch, O. Rose, T. Jefferson and J. W. Fowler, eds
    • Irdem, D. F., Kacar, N. B., and Uzsoy, R., 2008. An experimental study of an interative simulationoptimization algorithm for production planning. In: S. J. Mason, R. R. Hill, L. Monch, O. Rose, T. Jefferson and J. W. Fowler, eds. Proceedings of the 2008 winter simulation conference, 2176-2184.
    • (2008) Proceedings of the 2008 Winter Simulation Conference , pp. 2176-2184
    • Irdem, D.F.1    Kacar, N.B.2    Uzsoy, R.3
  • 26
    • 0000153439 scopus 로고
    • Capacity loading and release planning with work-in-progress (WIP) and leadtimes
    • Karmarkar, U. S., 1989. Capacity loading and release planning with work-in-progress (WIP) and leadtimes. Journal of Manufacturing and Operations Management, 2, 105-123.
    • (1989) Journal of Manufacturing and Operations Management , vol.2 , pp. 105-123
    • Karmarkar, U.S.1
  • 27
    • 0035929278 scopus 로고    scopus 로고
    • Extended model for a hybrid production planning approach
    • DOI 10.1016/S0925-5273(00)00172-9, PII S0925527300001729
    • Kim, B. and Kim, S., 2001. Extended model for a hybrid production planning approach. International Journal of Production Economics, 73(2), 165-173. (Pubitemid 32903551)
    • (2001) International Journal of Production Economics , vol.73 , Issue.2 , pp. 165-173
    • Kim, B.1    Kim, S.2
  • 28
    • 0035917224 scopus 로고    scopus 로고
    • Comparing the effectiveness of workload balancing objectives in FMS loading
    • DOI 10.1080/00207540010002847
    • Kumar, N. and Shanker, K., 2001. Comparing the effectiveness of workload balancing objectives in FMS loading. International Journal of Production Research, 39(5), 843-871. (Pubitemid 35165647)
    • (2001) International Journal of Production Research , vol.39 , Issue.5 , pp. 843-871
    • Kumar, N.1    Shanker, K.2
  • 29
    • 0031380482 scopus 로고    scopus 로고
    • Multi-period part selection and loading problems in flexible manufacturing systems
    • Lee, D. H., et al., 1997. Multi-period part selection and loading problems in flexible manufacturing systems. Computers & Industrial Engineering, 33 (3/4), 541-544.
    • (1997) Computers & Industrial Engineering , vol.33 , Issue.3-4 , pp. 541-544
    • Lee, D.H.1
  • 30
    • 0032121744 scopus 로고    scopus 로고
    • Part type selection, machine loading and part type volume determination problems in FMS planning
    • Nayak, G. K. and Acharya, D., 1998. Part type selection, machine loading and part type volume determination problems in FMS planning. International Journal of Production Research, 36(7), 1801-1824. (Pubitemid 128553226)
    • (1998) International Journal of Production Research , vol.36 , Issue.7 , pp. 1801-1824
    • Nayak, G.K.1    Acharya, D.2
  • 32
    • 34250195301 scopus 로고    scopus 로고
    • Production planning with load dependent lead times: An update of research
    • Pahl, J., Voss, S., and Woodruff, D. L., 2007. Production planning with load dependent lead times: an update of research. Annals of Operations Research, 153(1), 297-345.
    • (2007) Annals of Operations Research , vol.153 , Issue.1 , pp. 297-345
    • Pahl, J.1    Voss, S.2    Woodruff, D.L.3
  • 33
    • 17444392764 scopus 로고    scopus 로고
    • Hierarchical supply chain planning using artificial neural networks to anticipate base-level outcomes
    • DOI 10.1007/s00291-004-0170-x
    • Rohde, J., 2004. Hierarchical supply chain planning using artificial neural networks to anticipate base-level outcomes. OR Spectrum, 26(4), 471-492. (Pubitemid 40549754)
    • (2004) OR Spectrum , vol.26 , Issue.4 , pp. 471-492
    • Rohde, J.1
  • 35
    • 0032212715 scopus 로고    scopus 로고
    • Simultaneous loading, routing, and assembly plan selection in a flexible assembly system
    • DOI 10.1016/S0895-7177(98)00142-3, PII S0895717798001423
    • Sawik, T., 1998. Simultaneous loading, routing, and assembly plan selection in a flexible assembly system. International Journal of Production Research, 28(9), 19-29. (Pubitemid 28547858)
    • (1998) Mathematical and Computer Modelling , vol.28 , Issue.9 , pp. 19-29
    • Sawik, T.1
  • 36
    • 0345306112 scopus 로고    scopus 로고
    • Loading and Scheduling of a flexible assembly system by mixed integer programming
    • Sawik, T., 2004. Loading and Scheduling of a flexible assembly system by mixed integer programming. European Journal of Operational Research, 154(1), 1-19.
    • (2004) European Journal of Operational Research , vol.154 , Issue.1 , pp. 1-19
    • Sawik, T.1
  • 37
    • 30844458381 scopus 로고    scopus 로고
    • Hierarchical approach to production scheduling in make-to-order assembly
    • DOI 10.1080/00207540500340969, PII H87558171013180
    • Sawik, T., 2006. Hierarchical approach to production scheduling in make-to-order assembly. International Journal of Production Research, 44(4), 801-830. (Pubitemid 43102619)
    • (2006) International Journal of Production Research , vol.44 , Issue.4 , pp. 801-830
    • Sawik, T.1
  • 38
    • 0003039463 scopus 로고
    • Hierarchical structures in organisations: A conceptual framework
    • Schneeweiss, C., 1995. Hierarchical structures in organisations: a conceptual framework. European Journal of Operational Research, 86(1), 4-31.
    • (1995) European Journal of Operational Research , vol.86 , Issue.1 , pp. 4-31
    • Schneeweiss, C.1
  • 39
    • 33748747284 scopus 로고    scopus 로고
    • The effect of updating lead times on the performance of hierarchical planning systems
    • DOI 10.1016/j.ijpe.2005.04.005, PII S0925527305001490
    • Selcuk, B., Fransoo, J. C., and Kok, A. G. D., 2006. The effect of updating lead times on the performance of hierarchical planning systems. International Journal of Production Economics, 104(2), 427-440. (Pubitemid 44403073)
    • (2006) International Journal of Production Economics , vol.104 , Issue.2 , pp. 427-440
    • Selcuk, B.1    Fransoo, J.C.2    De Kok, A.G.3
  • 40
    • 0028517614 scopus 로고
    • A hierarchical model for control of flexible manufacturing systems
    • Sodhi, M., Askin, R. G., and Sen, S., 1994. A hierarchical model for control of flexible manufacturing systems. Journal of the Operational Research Society, 45(10), 1185-1196.
    • (1994) Journal of the Operational Research Society , vol.45 , Issue.10 , pp. 1185-1196
    • Sodhi, M.1    Askin, R.G.2    Sen, S.3
  • 41
    • 0020718128 scopus 로고
    • Formulation and solution of nonlinear integer production planning problems for flexible manufacturing systems
    • Stecke, K. E., 1983. Formulation and solution of nonlinear integer production planning problems for flexible manufacturing systems. Management Science, 29(3), 273-288.
    • (1983) Management Science , vol.29 , Issue.3 , pp. 273-288
    • Stecke, K.E.1
  • 42
    • 31744447420 scopus 로고    scopus 로고
    • Hybrid system dynamic - Discrete event simulation-based architecture for hierarchical production planning
    • DOI 10.1080/00207540500142472
    • Venkateswaran, J. and Son, Y. J., 2005. Hybrid system dynamic discrete event simulation-based architecture for hierarchical production planning. International Journal of Production Research, 43(20), 4397-4429. (Pubitemid 43175240)
    • (2005) International Journal of Production Research , vol.43 , Issue.20 , pp. 4397-4429
    • Venkateswaran, J.1    Son, Y.-J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.