메뉴 건너뛰기




Volumn 45, Issue 5, 2007, Pages 1183-1213

Due date and cost-based FMS loading, scheduling and tool management

Author keywords

Flexible manufacturing systems; Loading; Scheduling; Tool management

Indexed keywords

ALGORITHMS; COMPUTER CONTROL; DECISION MAKING; LOADING; MACHINING; NUMERICAL ANALYSIS; SCHEDULING;

EID: 33847075096     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540600559955     Document Type: Article
Times cited : (29)

References (23)
  • 1
    • 0030263614 scopus 로고    scopus 로고
    • Tool allocation and machining conditions optimization for CNC machines
    • Akturk, M.S. and Avci, S., Tool allocation and machining conditions optimization for CNC machines. Eur. J. Oper. Res., 1996, 94, 335-348.
    • (1996) Eur. J. Oper. Res , vol.94 , pp. 335-348
    • Akturk, M.S.1    Avci, S.2
  • 2
    • 0035883113 scopus 로고    scopus 로고
    • Integrated scheduling and tool management in flexible manufacturing systems
    • Akturk, M.S. and Ozkan, S., Integrated scheduling and tool management in flexible manufacturing systems. Int. J. Prod. Res., 2001, 39, 2697-2722.
    • (2001) Int. J. Prod. Res , vol.39 , pp. 2697-2722
    • Akturk, M.S.1    Ozkan, S.2
  • 3
    • 0028466353 scopus 로고
    • A comparative study of FMS tool allocation and part type selection approaches for a varying part type mix
    • Amoako-Gyampah, K., A comparative study of FMS tool allocation and part type selection approaches for a varying part type mix. Int. J. Flex. Manuf. Sys., 1994, 6, 179-207.
    • (1994) Int. J. Flex. Manuf. Sys , vol.6 , pp. 179-207
    • Amoako-Gyampah, K.1
  • 4
    • 0037694027 scopus 로고    scopus 로고
    • A problem space algorithm for single machine weighted tardiness problems
    • Avci, S., Akturk, M.S. and Storer, R.H., A problem space algorithm for single machine weighted tardiness problems. IIE Transactions, 2003, 35, 479-486.
    • (2003) IIE Transactions , vol.35 , pp. 479-486
    • Avci, S.1    Akturk, M.S.2    Storer, R.H.3
  • 5
    • 1442313020 scopus 로고    scopus 로고
    • Heuristic optimization system for the determination of index positions on CNC magazines with the consideration of cutting tool duplication
    • Baykasoglu, A. and Dereli, T., Heuristic optimization system for the determination of index positions on CNC magazines with the consideration of cutting tool duplication. Int. J. Prod. Res., 2004, 42, 1281-1303.
    • (2004) Int. J. Prod. Res , vol.42 , pp. 1281-1303
    • Baykasoglu, A.1    Dereli, T.2
  • 6
    • 0028467474 scopus 로고
    • An interactive procedure for bi-criteria production scheduling
    • Bernardo, J.J. and Lin, K.-S., An interactive procedure for bi-criteria production scheduling. Comput. Oper. Res., 1994, 21, 677-688.
    • (1994) Comput. Oper. Res , vol.21 , pp. 677-688
    • Bernardo, J.J.1    Lin, K.-S.2
  • 7
    • 0033210704 scopus 로고    scopus 로고
    • Heuristic and exact algorithms for scheduling aircraft landings
    • Ernst, A.T., Krishnamoorthy, M. and Storer, R.H., Heuristic and exact algorithms for scheduling aircraft landings. Networks, 1999, 34, 229-241.
    • (1999) Networks , vol.34 , pp. 229-241
    • Ernst, A.T.1    Krishnamoorthy, M.2    Storer, R.H.3
  • 8
    • 0037050387 scopus 로고    scopus 로고
    • Heuristic procedures for the parallel machine problem with tool switches
    • Fathi, Y. and Barnette, K.W., Heuristic procedures for the parallel machine problem with tool switches. Int. J. Prod. Res., 2002, 40, 151-164.
    • (2002) Int. J. Prod. Res , vol.40 , pp. 151-164
    • Fathi, Y.1    Barnette, K.W.2
  • 10
    • 0027591340 scopus 로고
    • A synthesis of decision models for tool management in automated manufacturing
    • Gray, A.E., Seidman, A. and Stecke, K.E., A synthesis of decision models for tool management in automated manufacturing. Manag. Sci., 1993, 39, 549-567.
    • (1993) Manag. Sci , vol.39 , pp. 549-567
    • Gray, A.E.1    Seidman, A.2    Stecke, K.E.3
  • 11
    • 0035482386 scopus 로고    scopus 로고
    • A review of different approaches to the FMS loading problem
    • Grieco, A., Semeraro, Q. and Tolio, T., A review of different approaches to the FMS loading problem. Int. J. Flex. Manuf. Sys., 2001, 13, 361-384.
    • (2001) Int. J. Flex. Manuf. Sys , vol.13 , pp. 361-384
    • Grieco, A.1    Semeraro, Q.2    Tolio, T.3
  • 14
    • 0030190236 scopus 로고    scopus 로고
    • Priority-based tool allocation in a flexible manufacturing system
    • Mukhopadhyay, S.K. and Sahu, S.K., Priority-based tool allocation in a flexible manufacturing system. Int. J. Prod. Res., 1996, 34, 1995-2018.
    • (1996) Int. J. Prod. Res , vol.34 , pp. 1995-2018
    • Mukhopadhyay, S.K.1    Sahu, S.K.2
  • 15
    • 0035461016 scopus 로고    scopus 로고
    • Melt scheduling to trade off material waste and shipping performance
    • Naphade, K.S., Wu, S.D., Storer, R.H. and Doshi, B.J., Melt scheduling to trade off material waste and shipping performance. Oper. Res., 2001, 49, 629-645.
    • (2001) Oper. Res , vol.49 , pp. 629-645
    • Naphade, K.S.1    Wu, S.D.2    Storer, R.H.3    Doshi, B.J.4
  • 16
    • 0001827599 scopus 로고
    • Classification and review of FMS scheduling approaches
    • Rachamadugu, R. and Stecke, K.E., Classification and review of FMS scheduling approaches. Prod. Plan. Con., 1994, 5, 2-20.
    • (1994) Prod. Plan. Con , vol.5 , pp. 2-20
    • Rachamadugu, R.1    Stecke, K.E.2
  • 17
    • 0031275801 scopus 로고    scopus 로고
    • Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter
    • Roh, H.-K. and Kim, Y.-D., Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter. Int. J. Prod. Res., 1997, 35, 2989-3003.
    • (1997) Int. J. Prod. Res , vol.35 , pp. 2989-3003
    • Roh, H.-K.1    Kim, Y.-D.2
  • 18
    • 0023384747 scopus 로고
    • The machine loading and tool allocation problem in a flexible manufacturing system
    • Sarin, S.C. and Chen, C.S., The machine loading and tool allocation problem in a flexible manufacturing system. Int. J. Prod. Res., 1987, 25, 1081-1094.
    • (1987) Int. J. Prod. Res , vol.25 , pp. 1081-1094
    • Sarin, S.C.1    Chen, C.S.2
  • 19
    • 0035254367 scopus 로고    scopus 로고
    • Heuristics for determining economic processing rates in a flexible manufacturing system
    • Sodhi, M.S., Lamond, B.F., Gautier, A. and Noël, M., Heuristics for determining economic processing rates in a flexible manufacturing system. Eur. J. Oper. Res., 2001, 129, 105-115.
    • (2001) Eur. J. Oper. Res , vol.129 , pp. 105-115
    • Sodhi, M.S.1    Lamond, B.F.2    Gautier, A.3    Noël, M.4
  • 20
    • 34250111322 scopus 로고
    • Design, planning, scheduling and control problems of flexible manufacturing systems
    • Stecke, K.E., Design, planning, scheduling and control problems of flexible manufacturing systems. Ann. Oper. Res., 1985, 3, 3-12.
    • (1985) Ann. Oper. Res , vol.3 , pp. 3-12
    • Stecke, K.E.1
  • 21
    • 0026930899 scopus 로고
    • New search spaces for sequencing problems with application to job shop scheduling
    • Storer, R.H., Wu, S.D. and Vaccari, R., New search spaces for sequencing problems with application to job shop scheduling. Manag. Sci., 1992, 38, 1495-1509.
    • (1992) Manag. Sci , vol.38 , pp. 1495-1509
    • Storer, R.H.1    Wu, S.D.2    Vaccari, R.3
  • 22
    • 0024070715 scopus 로고
    • Models arising from a flexible manufacturing machine, Part I: Minimization of the number of tool switches
    • Tang, C.S. and Denardo, E.V., Models arising from a flexible manufacturing machine, Part I: minimization of the number of tool switches. Oper. Res., 1988, 36, 767-777.
    • (1988) Oper. Res , vol.36 , pp. 767-777
    • Tang, C.S.1    Denardo, E.V.2
  • 23
    • 0242269881 scopus 로고    scopus 로고
    • Nonidentical parallel CNC machine scheduling
    • Turkcan, A., Akturk, M.S. and Storer, R.H., Nonidentical parallel CNC machine scheduling. Int. J. Prod. Res., 2003, 41, 2143-2168.
    • (2003) Int. J. Prod. Res , vol.41 , pp. 2143-2168
    • Turkcan, A.1    Akturk, M.S.2    Storer, R.H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.