메뉴 건너뛰기




Volumn 50, Issue 2, 2012, Pages 409-424

Multi-agent job shop scheduling system based on co-operative approach of idle time minimisation

Author keywords

combinatorial optimisation; distributed multi agent system; job shop scheduling

Indexed keywords

COMPUTATIONAL RESULTS; DISPATCHING RULES; DISTRIBUTED APPROACHES; DISTRIBUTED MULTIAGENT SYSTEMS; IDLE TIME; ILLUSTRATIVE EXAMPLES; JOB-SHOP SCHEDULING; MULTI-AGENT SCHEDULING; ON DYNAMICS; RESOURCE AGENTS; STATIC AND DYNAMIC; SUB-PROBLEMS; SUPERVISOR AGENTS;

EID: 84859976532     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2010.539276     Document Type: Article
Times cited : (34)

References (32)
  • 1
    • 3142729923 scopus 로고    scopus 로고
    • Teams of autonomous agents for job-shop scheduling problems: An experimental study
    • Aydin, ME, and, Fogarty, TC. 2004. Teams of autonomous agents for job-shop scheduling problems: An experimental study. Journal of Intelligent Manufacturing, 15 (4): 455-462.
    • (2004) Journal of Intelligent Manufacturing , vol.15 , Issue.4 , pp. 455-462
    • Aydin, M.E.1    Fogarty, T.C.2
  • 2
    • 0034325416 scopus 로고    scopus 로고
    • Dynamic job-shop scheduling using reinforcement learning agents
    • Aydin, ME, and, Oztemel, E. 2000. Dynamic job-shop scheduling using reinforcement learning agents. Robotics and Autonomous Systems, 33 (2-3): 169-178.
    • (2000) Robotics and Autonomous Systems , vol.33 , Issue.23 , pp. 169-178
    • Aydin, M.E.1    Oztemel, E.2
  • 3
    • 0037139688 scopus 로고    scopus 로고
    • Auction-based distributed scheduling in a dynamic job shop environment
    • Dewan, P, and, Joshi, S. 2002. Auction-based distributed scheduling in a dynamic job shop environment. International Journal of Production Research, 40 (5): 1173-1191.
    • (2002) International Journal of Production Research , vol.40 , Issue.5 , pp. 1173-1191
    • Dewan, P.1    Joshi, S.2
  • 5
    • 33750736617 scopus 로고    scopus 로고
    • A comparative study of a new heuristic based on adaptive memory programming and simulated annealing: The case of job shop scheduling
    • El-Bouri, A, Azisi, N, and, Zolfaghari, S. 2007. A comparative study of a new heuristic based on adaptive memory programming and simulated annealing: The case of job shop scheduling. European Journal of Operational Research, 177 (3): 1894-1910.
    • (2007) European Journal of Operational Research , vol.177 , Issue.3 , pp. 1894-1910
    • El-Bouri, A.1    Azisi, N.2    Zolfaghari, S.3
  • 6
    • 0141458080 scopus 로고    scopus 로고
    • Benchmarking and robust multi-agent-based production planning and control
    • Frey, D. 2003. Benchmarking and robust multi-agent-based production planning and control. Engineering Applications of Artificial Intelligence, 16: 307-320.
    • (2003) Engineering Applications of Artificial Intelligence , vol.16 , pp. 307-320
    • Frey, D.1
  • 7
    • 70449657251 scopus 로고    scopus 로고
    • Scheduling job shop associated with multiple routings with genetic and ant colony heuristics
    • Girish, BS, and, Jawahar, N. 2009. Scheduling job shop associated with multiple routings with genetic and ant colony heuristics. International Journal of Production Research, 47 (14): 3891-3917.
    • (2009) International Journal of Production Research , vol.47 , Issue.14 , pp. 3891-3917
    • Girish, B.S.1    Jawahar, N.2
  • 8
    • 0035399781 scopus 로고    scopus 로고
    • The hybrid heuristic genetic algorithm for job shop scheduling
    • Hong, Z, Yuncheng, F, and, Limin, H. 2001. The hybrid heuristic genetic algorithm for job shop scheduling. Computers & Industrial Engineering, 40 (3): 191-200.
    • (2001) Computers & Industrial Engineering , vol.40 , Issue.3 , pp. 191-200
    • Hong, Z.1    Yuncheng, F.2    Limin, H.3
  • 9
    • 34548613299 scopus 로고    scopus 로고
    • Ant colony optimisation combined with taboo search for the job shop scheduling problem
    • Huang, K-L, and, Liao, C-J. 2008. Ant colony optimisation combined with taboo search for the job shop scheduling problem. Computers and Operations Research, 35 (4): 1030-1046.
    • (2008) Computers and Operations Research , vol.35 , Issue.4 , pp. 1030-1046
    • Huang, K.-L.1    Liao, C.-J.2
  • 10
    • 0033102020 scopus 로고    scopus 로고
    • Deterministic job-shop scheduling: Past, present and future
    • Jain, AS, and, Meeran, S. 1999. Deterministic job-shop scheduling: Past, present and future. European Journal of Operational Research, 113 (2): 390-434.
    • (1999) European Journal of Operational Research , vol.113 , Issue.2 , pp. 390-434
    • Jain, A.S.1    Meeran, S.2
  • 11
    • 34548692311 scopus 로고    scopus 로고
    • A comparison of dispatching rules and genetic algorithms for job shop schedules of standard hydraulic cylinders
    • Kim, I, Watada, J, and, Shigaki, T. 2007. A comparison of dispatching rules and genetic algorithms for job shop schedules of standard hydraulic cylinders. Soft Computing, 12: 121-128.
    • (2007) Soft Computing , vol.12 , pp. 121-128
    • Kim, I.1    Watada, J.2    Shigaki, T.3
  • 13
    • 84860011507 scopus 로고    scopus 로고
    • Heuristique coopérative base dagents pour lordonnancement datelier cheminement multiple
    • 10-12 June 2009, Tarbes, France
    • Kouider, A. and Bouzouia, B., 2009. Heuristique coopérative base dagents pour lordonnancement datelier cheminement multiple. 8ème Congrès International de Génie Industriel CIGI 2009, 10-12 June 2009, Tarbes, France.
    • (2009) 8ème Congrès International de Génie Industriel CIGI 2009
    • Kouider, A.1    Bouzouia, B.2
  • 15
    • 36248975240 scopus 로고    scopus 로고
    • Multi-agent systems applications in manufacturing systems and supply chain management: A review paper
    • Lee, J-H, and, Kim, C-O. 2008. Multi-agent systems applications in manufacturing systems and supply chain management: A review paper. International Journal of Production Research, 46 (1): 233-265.
    • (2008) International Journal of Production Research , vol.46 , Issue.1 , pp. 233-265
    • Lee, J.-H.1    Kim, C.-O.2
  • 17
    • 10844252155 scopus 로고    scopus 로고
    • Metaheuristics for minimising the makespan of the dynamic shop scheduling problem
    • Liu, SQ, Ong, HL, and, Ng, KM. 2005. Metaheuristics for minimising the makespan of the dynamic shop scheduling problem. Advances in Engineering Software, 36 (3): 199-205.
    • (2005) Advances in Engineering Software , vol.36 , Issue.3 , pp. 199-205
    • Liu, S.Q.1    Ong, H.L.2    Ng, K.M.3
  • 19
    • 0032663605 scopus 로고    scopus 로고
    • MetaMorph: An adaptive agent-based architecture for intelligent manufacturing
    • Maturana, F, Shen, W, and, Norrie, DH. 1999. MetaMorph: An adaptive agent-based architecture for intelligent manufacturing. International Journal of Production Research, 37 (10): 2159-2173.
    • (1999) International Journal of Production Research , vol.37 , Issue.10 , pp. 2159-2173
    • Maturana, F.1    Shen, W.2    Norrie, D.H.3
  • 20
    • 0033894498 scopus 로고    scopus 로고
    • A tabu search method guided by shifting bottleneck for the job shop scheduling problem
    • Pezzella, F, and, Merelli, E. 2000. A tabu search method guided by shifting bottleneck for the job shop scheduling problem. European Journal of Operational Research, 120 (2): 297-310.
    • (2000) European Journal of Operational Research , vol.120 , Issue.2 , pp. 297-310
    • Pezzella, F.1    Merelli, E.2
  • 22
    • 55149108060 scopus 로고    scopus 로고
    • A filter-and-fan approach to the job shop scheduling problem
    • Rego, C, and, Duarte, R. 2009. A filter-and-fan approach to the job shop scheduling problem. European Journal of Operational Research, 194 (3): 650-662.
    • (2009) European Journal of Operational Research , vol.194 , Issue.3 , pp. 650-662
    • Rego, C.1    Duarte, R.2
  • 25
    • 0036200385 scopus 로고    scopus 로고
    • Distributed manufacturing scheduling using intelligent agents
    • Shen, W. 2002. Distributed manufacturing scheduling using intelligent agents. IEEE Intelligent Systems and Their Applications, 17 (1): 88-94.
    • (2002) IEEE Intelligent Systems and Their Applications , vol.17 , Issue.1 , pp. 88-94
    • Shen, W.1
  • 26
    • 0034655062 scopus 로고    scopus 로고
    • Performance of decomposition procedures for job shop scheduling problems with bottleneck machines
    • Uzsoy, R, and, Wang, C-S. 2000. Performance of decomposition procedures for job shop scheduling problems with bottleneck machines. International Journal of Production Research, 38 (6): 1271-1286.
    • (2000) International Journal of Production Research , vol.38 , Issue.6 , pp. 1271-1286
    • Uzsoy, R.1    Wang, C.-S.2
  • 27
    • 39749143379 scopus 로고    scopus 로고
    • Scheduling a dynamic job shop production system with sequence-dependent setups: An experimental study
    • Vinoda, V. and Sridharan, R., 2008a. Scheduling a dynamic job shop production system with sequence-dependent setups: An experimental study. Robotics and Computer-Integrated Manufacturing, 24 (3), 435-449.
    • (2008) Robotics and Computer-Integrated Manufacturing , vol.24 , Issue.3 , pp. 435-449
    • Vinoda, V.1    Sridharan, R.2
  • 28
    • 39049173098 scopus 로고    scopus 로고
    • Dynamic job-shop scheduling with sequence-dependent setup times: Simulation modeling and analysis
    • Vinoda, V, and, Sridharan, R. 2008b. Dynamic job-shop scheduling with sequence-dependent setup times: Simulation modeling and analysis. International Journal of Advanced Manufacturing Technology, v36: 355-372.
    • (2008) International Journal of Advanced Manufacturing Technology , vol.36 V , pp. 355-372
    • Vinoda, V.1    Sridharan, R.2
  • 29
    • 33746794581 scopus 로고    scopus 로고
    • Integrated process planning and scheduling/rescheduling - An agent-based approach
    • Wong, TN. 2006. Integrated process planning and scheduling/rescheduling- an agent-based approach. International Journal of Production Research, 44 (18-19): 3627-3655.
    • (2006) International Journal of Production Research , vol.44 , Issue.1819 , pp. 3627-3655
    • Wong, T.N.1
  • 30
    • 36249018423 scopus 로고    scopus 로고
    • Ant colony intelligence in multi-agent dynamic manufacturing scheduling
    • Xiang, W, and, Lee, HP. 2008. Ant colony intelligence in multi-agent dynamic manufacturing scheduling. Engineering Applications of Artificial Intelligence, 21 (1): 73-85.
    • (2008) Engineering Applications of Artificial Intelligence , vol.21 , Issue.1 , pp. 73-85
    • Xiang, W.1    Lee, H.P.2
  • 32
    • 70449637498 scopus 로고    scopus 로고
    • Performance of an ant colony optimisation algorithm in dynamic job shop scheduling problems
    • Zhou, R, Nee, AYC, and, Lee, HP. 2009. Performance of an ant colony optimisation algorithm in dynamic job shop scheduling problems. International Journal of Production Research, 47 (11): 2009-2920.
    • (2009) International Journal of Production Research , vol.47 , Issue.11 , pp. 2009-2920
    • Zhou, R.1    Nee, A.Y.C.2    Lee, H.P.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.