-
1
-
-
0032050336
-
CAMPS:A Constraint-Based Architecture for Multi-Agent Planning and Scheduling
-
Apr.
-
K. Miyashita, “CAMPS:A Constraint-Based Architecture for Multi-Agent Planning and Scheduling,” J. Intelligent Manufacturing, vol. 9, no. 2, Apr. 1998, pp. 147-154.
-
(1998)
J. Intelligent Manufacturing
, vol.9
, Issue.2
, pp. 147-154
-
-
Miyashita, K.1
-
2
-
-
0000762544
-
Exploiting Problem Structure for Distributed Constraint Optimization
-
AAAI Press, Menlo Park, Calif.
-
J. Liu and K.P. Sycara, “Exploiting Problem Structure for Distributed Constraint Optimization,” Proc. 1st Int'l Conf. Multi-Agent Systems, AAAI Press, Menlo Park, Calif., 1995, pp. 246-253.
-
(1995)
Proc. 1st Int'l Conf. Multi-Agent Systems
, pp. 246-253
-
-
Liu, J.1
Sycara, K.P.2
-
3
-
-
0034205722
-
MetaMorph II: An Agent-Based Architecture for Distributed Intelligent Design and Manufacturing
-
June
-
W. Shen, F. Maturana, and D.H. Norrie, “MetaMorph II: An Agent-Based Architecture for Distributed Intelligent Design and Manufacturing,” J. Intelligent Manufacturing, vol. 11, no. 3, June 2000, pp. 237-251.
-
(2000)
J. Intelligent Manufacturing
, vol.11
, Issue.3
, pp. 237-251
-
-
Shen, W.1
Maturana, F.2
Norrie, D.H.3
-
4
-
-
0003573348
-
-
Taylor and Francis, London
-
W. Shen, D.H. Norrie, and J.P. Barthés, Multi-Agent Systems for Concurrent Intelligent Design and Manufacturing, Taylor and Francis, London, 2000.
-
(2000)
Multi-Agent Systems for Concurrent Intelligent Design and Manufacturing
-
-
Shen, W.1
Norrie, D.H.2
Barthés, J.P.3
-
5
-
-
0026103848
-
Resource Allocation in Distributed Factory Scheduling
-
K. Sycara et al., “Resource Allocation in Distributed Factory Scheduling,” IEEE Expert, vol. 6, no. 1, Feb. 1991, pp. 29-40.
-
(1991)
IEEE Expert
, vol.6
, Issue.1
, pp. 29-40
-
-
Sycara, K.1
-
6
-
-
0001794206
-
The Distributed Asynchronous Scheduler
-
M. Zweben and M.S. Fox, eds., Morgan Kaufmann, San Francisco
-
P. Burke and P. Prosser, “The Distributed Asynchronous Scheduler,” Intelligent Scheduling, M. Zweben and M.S. Fox, eds., Morgan Kaufmann, San Francisco, 1994, pp. 309-339.
-
(1994)
Intelligent Scheduling
, pp. 309-339
-
-
Burke, P.1
Prosser, P.2
-
7
-
-
0001811353
-
Logistics Management System (LMS): Integrating Decision Technologies for Dispatch Scheduling in Semiconductor Manufacturing
-
M. Zweben and M.S. Fox, eds., Morgan Kaufmann, San Francisco
-
K. Fordyce and G.G. Sullivan, “Logistics Management System (LMS): Integrating Decision Technologies for Dispatch Scheduling in Semiconductor Manufacturing,” Intelligent Scheduling, M. Zweben and M.S. Fox, eds., Morgan Kaufmann, San Francisco, 1994, pp. 473-516.
-
(1994)
Intelligent Scheduling
, pp. 473-516
-
-
Fordyce, K.1
Sullivan, G.G.2
-
8
-
-
0019180974
-
The Contract Net Protocol: High-Level Communication and Control in a Distributed Problem Solver
-
Dec.
-
R.G. Smith, “The Contract Net Protocol: High-Level Communication and Control in a Distributed Problem Solver,” IEEE Trans. Computers, vol. C-29, no. 12, Dec. 1980, pp. 1104-1113.
-
(1980)
IEEE Trans. Computers
, vol.C-29
, Issue.12
, pp. 1104-1113
-
-
Smith, R.G.1
-
9
-
-
84950937653
-
Integrated Shop Floor Control Using Autonomous Agents
-
July
-
G.Y.-J. Lin and J.J. Solberg, “Integrated Shop Floor Control Using Autonomous Agents,” IIE Trans.: Design and Manufacturing, vol. 24, no. 3, July 1992, pp. 57-71.
-
(1992)
IIE Trans.: Design and Manufacturing
, vol.24
, Issue.3
, pp. 57-71
-
-
Lin, G.Y.-J.1
Solberg, J.J.2
-
10
-
-
0002326640
-
ADDYMS:Architecture for Distributed Dynamic Manufacturing Scheduling
-
A. Famili, D.S. Nau, and S.H. Kim, eds., AAAI Press, Menlo Park, Calif.
-
J. Butler and H. Ohtsubo, “ADDYMS:Architecture for Distributed Dynamic Manufacturing Scheduling,” Artificial Intelligence Applications in Manufacturing, A. Famili, D.S. Nau, and S.H. Kim, eds., AAAI Press, Menlo Park, Calif., 1992, pp. 199-214.
-
(1992)
Artificial Intelligence Applications in Manufacturing
, pp. 199-214
-
-
Butler, J.1
Ohtsubo, H.2
-
11
-
-
0003960789
-
-
PhD thesis, Dept., Rensselaer Polytechnic Inst., Troy, N.Y.
-
A.D. Baker, Manufacturing Control with a Market-Driven Contract Net, PhD thesis, Dept., Rensselaer Polytechnic Inst., Troy, N.Y. 1991.
-
(1991)
Manufacturing Control with a Market-Driven Contract Net
-
-
Baker, A.D.1
-
12
-
-
0008649140
-
Evaluation of Contract Net-Based Heterarchical Scheduling for Flexible Manufacturing Systems
-
A. Saad et al., “Evaluation of Contract Net-Based Heterarchical Scheduling for Flexible Manufacturing Systems,” Working Notes IJCAI '95 Workshop Intelligent Manufacturing, 1995, pp. 310-321.
-
(1995)
Working Notes IJCAI '95 Workshop Intelligent Manufacturing
, pp. 310-321
-
-
Saad, A.1
-
13
-
-
0029510875
-
Application of Decentralized Cooperative Problem Solving in Dynamic Flexible Scheduling
-
SPIE, Bellingham, Wash., Aug.
-
Z. Guan et al., “Application of Decentralized Cooperative Problem Solving in Dynamic Flexible Scheduling,” Proc. SPIE, vol. 2620, SPIE, Bellingham, Wash., Aug. 1995, pp. 179-183.
-
(1995)
Proc. SPIE
, vol.2620
, pp. 179-183
-
-
Guan, Z.1
-
14
-
-
0032045595
-
A Dynamic Scheduling Holon for Manufacturing Orders
-
Apr.
-
P. Sousa and C. Ramos, “A Dynamic Scheduling Holon for Manufacturing Orders,” J. Intelligent Manufacturing, vol. 9, no. 2, Apr. 1997, pp. 107-112.
-
(1997)
J. Intelligent Manufacturing
, vol.9
, Issue.2
, pp. 107-112
-
-
Sousa, P.1
Ramos, C.2
-
15
-
-
0008656784
-
-
Purdue Univ., West Lafayette, Ind.
-
M.J. Shaw and A.B. Whinston, Distributed Planning in Cellular Flexible Manufacturing Systems, tech. report, Management Information Research Center, Purdue Univ., West Lafayette, Ind., 1983.
-
(1983)
Distributed Planning in Cellular Flexible Manufacturing Systems, tech. report, Management Information Research Center
-
-
Shaw, M.J.1
Whinston, A.B.2
-
16
-
-
0001538571
-
Manufacturing Experience with the Contract Net
-
M.N. Huhns, ed., Morgan Kaufmann, San Francisco
-
H.V.D. Parunak, “Manufacturing Experience with the Contract Net,” Distributed Artificial Intelligence, vol. 1, M.N. Huhns, ed., Morgan Kaufmann, San Francisco, 1987, pp. 285-310.
-
(1987)
Distributed Artificial Intelligence
, vol.1
, pp. 285-310
-
-
Parunak, H.V.D.1
-
17
-
-
0030673502
-
The AARIA Agent Architecture: An Example of Requirements-Driven Agent-Based System Design
-
H.V.D. Parunak, A.D. Baker, and S.J. Clark, “The AARIA Agent Architecture: An Example of Requirements-Driven Agent-Based System Design 482-483.
-
-
-
Parunak, H.V.D.1
Baker, A.D.2
Clark, S.J.3
-
18
-
-
0031069104
-
Using Multi-Agent Architecture in FMS for Dynamic Scheduling
-
Feb.
-
K. Kouiss, H. Pierreval, and N. Mebarki, “Using Multi-Agent Architecture in FMS for Dynamic Scheduling,” J. Intelligent Manufacturing, vol. 8, no. 1, Feb. 1997, pp. 41-47.
-
(1997)
J. Intelligent Manufacturing
, vol.8
, Issue.1
, pp. 41-47
-
-
Kouiss, K.1
Pierreval, H.2
Mebarki, N.3
-
20
-
-
0029453865
-
How to Schedule a Flow Shop Plant by Agents
-
Billerica, Mass.
-
T. Daouas, K. Ghedira, and J.P. Muller, “How to Schedule a Flow Shop Plant by Agents,” Applications of Artificial Intelligence in Eng., Computational Mechanics, Billerica, Mass., 1995, pp. 73-80.
-
(1995)
Applications of Artificial Intelligence in Eng., Computational Mechanics
, pp. 73-80
-
-
Daouas, T.1
Ghedira, K.2
Muller, J.P.3
|