메뉴 건너뛰기




Volumn 17, Issue 1, 2002, Pages 88-94

Distributed Manufacturing Scheduling Using Intelligent Agents

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTATIONAL COMPLEXITY; GENETIC ALGORITHMS; HEURISTIC METHODS; JOB ANALYSIS; MANUFACTURING DATA PROCESSING; MULTI AGENT SYSTEMS; OPTIMIZATION; PLANNING; RESOURCE ALLOCATION; SCHEDULING;

EID: 0036200385     PISSN: 15411672     EISSN: None     Source Type: Journal    
DOI: 10.1109/5254.988492     Document Type: Article
Times cited : (234)

References (21)
  • 1
    • 0032050336 scopus 로고    scopus 로고
    • CAMPS:A Constraint-Based Architecture for Multi-Agent Planning and Scheduling
    • Apr.
    • K. Miyashita, “CAMPS:A Constraint-Based Architecture for Multi-Agent Planning and Scheduling,” J. Intelligent Manufacturing, vol. 9, no. 2, Apr. 1998, pp. 147-154.
    • (1998) J. Intelligent Manufacturing , vol.9 , Issue.2 , pp. 147-154
    • Miyashita, K.1
  • 2
    • 0000762544 scopus 로고
    • Exploiting Problem Structure for Distributed Constraint Optimization
    • AAAI Press, Menlo Park, Calif.
    • J. Liu and K.P. Sycara, “Exploiting Problem Structure for Distributed Constraint Optimization,” Proc. 1st Int'l Conf. Multi-Agent Systems, AAAI Press, Menlo Park, Calif., 1995, pp. 246-253.
    • (1995) Proc. 1st Int'l Conf. Multi-Agent Systems , pp. 246-253
    • Liu, J.1    Sycara, K.P.2
  • 3
    • 0034205722 scopus 로고    scopus 로고
    • MetaMorph II: An Agent-Based Architecture for Distributed Intelligent Design and Manufacturing
    • June
    • W. Shen, F. Maturana, and D.H. Norrie, “MetaMorph II: An Agent-Based Architecture for Distributed Intelligent Design and Manufacturing,” J. Intelligent Manufacturing, vol. 11, no. 3, June 2000, pp. 237-251.
    • (2000) J. Intelligent Manufacturing , vol.11 , Issue.3 , pp. 237-251
    • Shen, W.1    Maturana, F.2    Norrie, D.H.3
  • 5
    • 0026103848 scopus 로고
    • Resource Allocation in Distributed Factory Scheduling
    • K. Sycara et al., “Resource Allocation in Distributed Factory Scheduling,” IEEE Expert, vol. 6, no. 1, Feb. 1991, pp. 29-40.
    • (1991) IEEE Expert , vol.6 , Issue.1 , pp. 29-40
    • Sycara, K.1
  • 6
    • 0001794206 scopus 로고
    • The Distributed Asynchronous Scheduler
    • M. Zweben and M.S. Fox, eds., Morgan Kaufmann, San Francisco
    • P. Burke and P. Prosser, “The Distributed Asynchronous Scheduler,” Intelligent Scheduling, M. Zweben and M.S. Fox, eds., Morgan Kaufmann, San Francisco, 1994, pp. 309-339.
    • (1994) Intelligent Scheduling , pp. 309-339
    • Burke, P.1    Prosser, P.2
  • 7
    • 0001811353 scopus 로고
    • Logistics Management System (LMS): Integrating Decision Technologies for Dispatch Scheduling in Semiconductor Manufacturing
    • M. Zweben and M.S. Fox, eds., Morgan Kaufmann, San Francisco
    • K. Fordyce and G.G. Sullivan, “Logistics Management System (LMS): Integrating Decision Technologies for Dispatch Scheduling in Semiconductor Manufacturing,” Intelligent Scheduling, M. Zweben and M.S. Fox, eds., Morgan Kaufmann, San Francisco, 1994, pp. 473-516.
    • (1994) Intelligent Scheduling , pp. 473-516
    • Fordyce, K.1    Sullivan, G.G.2
  • 8
    • 0019180974 scopus 로고
    • The Contract Net Protocol: High-Level Communication and Control in a Distributed Problem Solver
    • Dec.
    • R.G. Smith, “The Contract Net Protocol: High-Level Communication and Control in a Distributed Problem Solver,” IEEE Trans. Computers, vol. C-29, no. 12, Dec. 1980, pp. 1104-1113.
    • (1980) IEEE Trans. Computers , vol.C-29 , Issue.12 , pp. 1104-1113
    • Smith, R.G.1
  • 9
    • 84950937653 scopus 로고
    • Integrated Shop Floor Control Using Autonomous Agents
    • July
    • G.Y.-J. Lin and J.J. Solberg, “Integrated Shop Floor Control Using Autonomous Agents,” IIE Trans.: Design and Manufacturing, vol. 24, no. 3, July 1992, pp. 57-71.
    • (1992) IIE Trans.: Design and Manufacturing , vol.24 , Issue.3 , pp. 57-71
    • Lin, G.Y.-J.1    Solberg, J.J.2
  • 10
    • 0002326640 scopus 로고
    • ADDYMS:Architecture for Distributed Dynamic Manufacturing Scheduling
    • A. Famili, D.S. Nau, and S.H. Kim, eds., AAAI Press, Menlo Park, Calif.
    • J. Butler and H. Ohtsubo, “ADDYMS:Architecture for Distributed Dynamic Manufacturing Scheduling,” Artificial Intelligence Applications in Manufacturing, A. Famili, D.S. Nau, and S.H. Kim, eds., AAAI Press, Menlo Park, Calif., 1992, pp. 199-214.
    • (1992) Artificial Intelligence Applications in Manufacturing , pp. 199-214
    • Butler, J.1    Ohtsubo, H.2
  • 12
    • 0008649140 scopus 로고
    • Evaluation of Contract Net-Based Heterarchical Scheduling for Flexible Manufacturing Systems
    • A. Saad et al., “Evaluation of Contract Net-Based Heterarchical Scheduling for Flexible Manufacturing Systems,” Working Notes IJCAI '95 Workshop Intelligent Manufacturing, 1995, pp. 310-321.
    • (1995) Working Notes IJCAI '95 Workshop Intelligent Manufacturing , pp. 310-321
    • Saad, A.1
  • 13
    • 0029510875 scopus 로고
    • Application of Decentralized Cooperative Problem Solving in Dynamic Flexible Scheduling
    • SPIE, Bellingham, Wash., Aug.
    • Z. Guan et al., “Application of Decentralized Cooperative Problem Solving in Dynamic Flexible Scheduling,” Proc. SPIE, vol. 2620, SPIE, Bellingham, Wash., Aug. 1995, pp. 179-183.
    • (1995) Proc. SPIE , vol.2620 , pp. 179-183
    • Guan, Z.1
  • 14
    • 0032045595 scopus 로고    scopus 로고
    • A Dynamic Scheduling Holon for Manufacturing Orders
    • Apr.
    • P. Sousa and C. Ramos, “A Dynamic Scheduling Holon for Manufacturing Orders,” J. Intelligent Manufacturing, vol. 9, no. 2, Apr. 1997, pp. 107-112.
    • (1997) J. Intelligent Manufacturing , vol.9 , Issue.2 , pp. 107-112
    • Sousa, P.1    Ramos, C.2
  • 16
    • 0001538571 scopus 로고
    • Manufacturing Experience with the Contract Net
    • M.N. Huhns, ed., Morgan Kaufmann, San Francisco
    • H.V.D. Parunak, “Manufacturing Experience with the Contract Net,” Distributed Artificial Intelligence, vol. 1, M.N. Huhns, ed., Morgan Kaufmann, San Francisco, 1987, pp. 285-310.
    • (1987) Distributed Artificial Intelligence , vol.1 , pp. 285-310
    • Parunak, H.V.D.1
  • 17
    • 0030673502 scopus 로고    scopus 로고
    • The AARIA Agent Architecture: An Example of Requirements-Driven Agent-Based System Design
    • H.V.D. Parunak, A.D. Baker, and S.J. Clark, “The AARIA Agent Architecture: An Example of Requirements-Driven Agent-Based System Design 482-483.
    • Parunak, H.V.D.1    Baker, A.D.2    Clark, S.J.3
  • 18
    • 0031069104 scopus 로고    scopus 로고
    • Using Multi-Agent Architecture in FMS for Dynamic Scheduling
    • Feb.
    • K. Kouiss, H. Pierreval, and N. Mebarki, “Using Multi-Agent Architecture in FMS for Dynamic Scheduling,” J. Intelligent Manufacturing, vol. 8, no. 1, Feb. 1997, pp. 41-47.
    • (1997) J. Intelligent Manufacturing , vol.8 , Issue.1 , pp. 41-47
    • Kouiss, K.1    Pierreval, H.2    Mebarki, N.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.