메뉴 건너뛰기




Volumn 12, Issue 4, 2012, Pages 1279-1287

A particle swarm optimization algorithm for solving unbalanced supply chain planning problems

Author keywords

Particle swarm optimization; Production and distribution planning; Quantity discount; Unbalanced supply chain

Indexed keywords

CHAINS; SUPPLY CHAINS;

EID: 84857108299     PISSN: 15684946     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.asoc.2011.12.006     Document Type: Article
Times cited : (42)

References (59)
  • 1
    • 25144504271 scopus 로고    scopus 로고
    • Supply chain management
    • A. Alam Supply chain management J. Strategy Manage. 13 1996 80 86
    • (1996) J. Strategy Manage. , vol.13 , pp. 80-86
    • Alam, A.1
  • 2
    • 30744456799 scopus 로고    scopus 로고
    • Supply chain network design: Partner selection and production/ distribution planning using a systematic model
    • DOI 10.1057/palgrave.jors.2601949, PII 2601949
    • D.Y. Sha, and Z.H. Che Supply chain network design: partner selection and production/distribution planning using a systematic model J. Oper. Res. Soc. 57 1 2006 52 62 (Pubitemid 43090859)
    • (2006) Journal of the Operational Research Society , vol.57 , Issue.1 , pp. 52-62
    • Sha, D.Y.1    Che, Z.H.2
  • 3
    • 17444380863 scopus 로고    scopus 로고
    • Virtual integration with a multi-criteria partner selection model for the multi-echelon manufacturing system
    • D.Y. Sha, and Z.H. Che Virtual integration with a multi-criteria partner selection model for the multi-echelon manufacturing system Int. J. Adv. Manuf. Technol. 25 7-8 2005 739 802
    • (2005) Int. J. Adv. Manuf. Technol. , vol.25 , Issue.78 , pp. 739-802
    • Sha, D.Y.1    Che, Z.H.2
  • 4
    • 36148953939 scopus 로고    scopus 로고
    • Comprehensive and configurable metrics for supplier selection
    • DOI 10.1016/j.ijpe.2006.04.020, PII S0925527306001241, Scheduling in Batch-Processing Industries and Supply Shains
    • S.H. Huang, and H. Keskar Comprehensive and configurable metrics for supplier selection Int. J. Prod. Econ. 105 2007 510 523 (Pubitemid 44827615)
    • (2007) International Journal of Production Economics , vol.105 , Issue.2 , pp. 510-523
    • Huang, S.H.1    Keskar, H.2
  • 5
    • 33751394395 scopus 로고    scopus 로고
    • An integrated model for supplier selection decisions in configuration changes
    • DOI 10.1016/j.eswa.2006.02.015, PII S0957417406000893
    • H.S. Wang, and Z.H. Che An integrated model for supplier selection decisions in configuration changes Expert Syst. Appl. 32 4 2007 1132 1140 (Pubitemid 44821802)
    • (2007) Expert Systems with Applications , vol.32 , Issue.4 , pp. 1132-1140
    • Wang, H.S.1    Che, Z.H.2
  • 6
    • 44649100737 scopus 로고    scopus 로고
    • Supplier selection and supply quantity allocation of common and non-common parts with multiple criteria under multiple products
    • Z.H. Che, and H.S. Wang Supplier selection and supply quantity allocation of common and non-common parts with multiple criteria under multiple products Comput. Ind. Eng. 55 1 2008 110 133
    • (2008) Comput. Ind. Eng. , vol.55 , Issue.1 , pp. 110-133
    • Che, Z.H.1    Wang, H.S.2
  • 7
    • 70349260985 scopus 로고    scopus 로고
    • Optimizing whole supply chain benefit versus buyer's benefit through supplier selection
    • J.G. Kheljani, S.H. Ghodsypour, and C. O'Brien Optimizing whole supply chain benefit versus buyer's benefit through supplier selection Int. J. Prod. Econ. 121 2009 432 493
    • (2009) Int. J. Prod. Econ. , vol.121 , pp. 432-493
    • Kheljani, J.G.1    Ghodsypour, S.H.2    O'Brien, C.3
  • 8
    • 70649087042 scopus 로고    scopus 로고
    • Selecting sourcing partners for a make-to-order supply chain
    • J. Yue, Y. Xia, and T. Tran Selecting sourcing partners for a make-to-order supply chain Omega 38 2010 136 144
    • (2010) Omega , vol.38 , pp. 136-144
    • Yue, J.1    Xia, Y.2    Tran, T.3
  • 9
    • 50249122486 scopus 로고    scopus 로고
    • Fuzzy multi-objective production/distribution planning decisions with multi-product and multi-time period in a supply chain
    • T.F. Liang Fuzzy multi-objective production/distribution planning decisions with multi-product and multi-time period in a supply chain Comput. Ind. Eng. 55 3 2008 676 694
    • (2008) Comput. Ind. Eng. , vol.55 , Issue.3 , pp. 676-694
    • Liang, T.F.1
  • 10
    • 1942436286 scopus 로고    scopus 로고
    • Multi-objective optimization of multi-echelon supply chain networks with uncertain product demands and prices
    • C.L. Chen, and W.C. Lee Multi-objective optimization of multi-echelon supply chain networks with uncertain product demands and prices Comput. Chem. Eng. 28 6-7 2004 1131 1144
    • (2004) Comput. Chem. Eng. , vol.28 , Issue.67 , pp. 1131-1144
    • Chen, C.L.1    Lee, W.C.2
  • 11
    • 0036642582 scopus 로고    scopus 로고
    • A combined model of network design and production/distribution planning for a supply network
    • DOI 10.1016/S0360-8352(02)00074-8, PII S0360835202000748
    • Y.J. Jang, S.Y. Jang, B.M. Chang, and J. Park A combined model of network design and production/distribution planning for a supply network Comput. Ind. Eng. 43 1-2 2002 263 281 (Pubitemid 34551912)
    • (2002) Computers and Industrial Engineering , vol.43 , Issue.1-2 , pp. 263-281
    • Jang, Y.-J.1    Jang, S.-Y.2    Chang, B.-M.3    Park, J.4
  • 12
    • 0042091890 scopus 로고    scopus 로고
    • Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs
    • DOI 10.1016/0377-2217(94)00339-4
    • J.J. Liu, and P. Yang Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs Eur. J. Oper. Res. 91 3 1996 517 527 (Pubitemid 126393163)
    • (1996) European Journal of Operational Research , vol.91 , Issue.3 , pp. 517-527
    • Liu, J.J.1    Yang, P.2
  • 13
    • 0037375114 scopus 로고    scopus 로고
    • An optimal productions run time with imperfect production process and allowable shortages
    • K.J. Chung, and K.L. Hou An optimal productions run time with imperfect production process and allowable shortages Comput. Oper. Res. 30 4 2003 483 490
    • (2003) Comput. Oper. Res. , vol.30 , Issue.4 , pp. 483-490
    • Chung, K.J.1    Hou, K.L.2
  • 15
    • 37849188280 scopus 로고    scopus 로고
    • An imperfect production process in a volume flexible inventory model
    • DOI 10.1016/j.ijpe.2006.05.005, PII S0925527306001290, Scheduling in Batch-Processing Industries and Supply Shains
    • S.S. Sana, S.K. Goyal, and K. Chaudhuri An imperfect production process in a volume flexible inventory model Int. J. Prod. Econ. 105 2 2007 548 559 (Pubitemid 44827618)
    • (2007) International Journal of Production Economics , vol.105 , Issue.2 , pp. 548-559
    • Sana, S.S.1    Goyal, S.K.2    Chaudhuri, K.3
  • 16
    • 0005536597 scopus 로고
    • The optimum reject allowance problem
    • R.E. Levitan The optimum reject allowance problem Manage. Sci. 6 1960 172 186
    • (1960) Manage. Sci. , vol.6 , pp. 172-186
    • Levitan, R.E.1
  • 17
    • 0041907478 scopus 로고
    • Markovian decision models for reject allowance problems
    • M. Klein Markovian decision models for reject allowance problems Manage. Sci. 12 1966 349 358
    • (1966) Manage. Sci. , vol.12 , pp. 349-358
    • Klein, M.1
  • 18
    • 0042408670 scopus 로고
    • Bayes Markovian decision models for a multi-period reject allowance problem
    • L.S. White Bayes Markovian decision models for a multi-period reject allowance problem Oper. Res. 15 1967 857 865
    • (1967) Oper. Res. , vol.15 , pp. 857-865
    • White, L.S.1
  • 19
    • 0022680968 scopus 로고
    • A comparative study of continuous and periodic inspection policies in deteriorating production systems
    • H.L. Lee, and M.J. Rosenblatt A comparative study of continuous and periodic inspection policies in deteriorating production systems IIE Trans. 18 1986 2 9
    • (1986) IIE Trans. , vol.18 , pp. 2-9
    • Lee, H.L.1    Rosenblatt, M.J.2
  • 20
    • 0022613610 scopus 로고
    • Optimal lot sizing, process quality improvement, and setup cost reduction
    • R.L. Porteus Optimal lot sizing, process quality improvement, and setup cost reduction Oper. Res. 34 5 1986 137 144
    • (1986) Oper. Res. , vol.34 , Issue.5 , pp. 137-144
    • Porteus, R.L.1
  • 21
    • 33751509315 scopus 로고    scopus 로고
    • Supplier selection with multiple criteria in volume discount environments
    • DOI 10.1016/j.omega.2005.09.002, PII S0305048305001180
    • W. Xia, and Z. Wu Supplier selection with multiple criteria in volume discount environments Omega 35 5 2007 494 504 (Pubitemid 44835388)
    • (2007) Omega , vol.35 , Issue.5 , pp. 494-504
    • Xia, W.1    Wu, Z.2
  • 22
    • 67349276391 scopus 로고    scopus 로고
    • Economic selection of process mean for single-vendor single-buyer supply chain
    • M.A. Darwish Economic selection of process mean for single-vendor single-buyer supply chain Eur. J. Oper. Res. 199 1 2009 162 169
    • (2009) Eur. J. Oper. Res. , vol.199 , Issue.1 , pp. 162-169
    • Darwish, M.A.1
  • 23
    • 69249203763 scopus 로고    scopus 로고
    • Price discount based on early order commitment in a single manufacturer-multiple retailer supply chain
    • J. Xie, D. Zhou, J.C. Wei, and X. Zhao Price discount based on early order commitment in a single manufacturer-multiple retailer supply chain Eur. J. Oper. Res. 200 2 2010 368 376
    • (2010) Eur. J. Oper. Res. , vol.200 , Issue.2 , pp. 368-376
    • Xie, J.1    Zhou, D.2    Wei, J.C.3    Zhao, X.4
  • 24
    • 0021439741 scopus 로고
    • A quantity discount pricing model to increase vendor profits
    • J.P. Monahan A quantity discount pricing model to increase vendor profits Manage. Sci. 30 1984 720 726
    • (1984) Manage. Sci. , vol.30 , pp. 720-726
    • Monahan, J.P.1
  • 25
    • 33750472991 scopus 로고    scopus 로고
    • An optimization approach for supply chain management models with quantity discount policy
    • J.F. Tsai An optimization approach for supply chain management models with quantity discount policy Eur. J. Oper. Res. 177 2007 982 994
    • (2007) Eur. J. Oper. Res. , vol.177 , pp. 982-994
    • Tsai, J.F.1
  • 27
    • 0009013657 scopus 로고
    • Optimal purchase and transportation cost lot sizing for a single item
    • R.M. Russell, and L.J. Krajewski Optimal purchase and transportation cost lot sizing for a single item Decis. Sci. 22 1991 940 952
    • (1991) Decis. Sci. , vol.22 , pp. 940-952
    • Russell, R.M.1    Krajewski, L.J.2
  • 28
    • 33845622042 scopus 로고    scopus 로고
    • An improved PSO algorithm for solving non-convex NLP/MINLP problems with equality constraints
    • L. Yiqing, Y. Xigang, and L. Yougijian An improved PSO algorithm for solving non-convex NLP/MINLP problems with equality constraints Comput. Chem. Eng. 31 3 2006 153 162
    • (2006) Comput. Chem. Eng. , vol.31 , Issue.3 , pp. 153-162
    • Yiqing, L.1    Xigang, Y.2    Yougijian, L.3
  • 29
    • 79151481737 scopus 로고    scopus 로고
    • Agent oriented petroleum supply chain coordination: Co-evolutionary particle swarm optimization based approach
    • A.K. Sinha, H.K. Aditya, M.K. Tiwari, and F.T.S. Chan Agent oriented petroleum supply chain coordination: Co-evolutionary particle swarm optimization based approach Expert Syst. Appl. 38 2011 6132 6145
    • (2011) Expert Syst. Appl. , vol.38 , pp. 6132-6145
    • Sinha, A.K.1    Aditya, H.K.2    Tiwari, M.K.3    Chan, F.T.S.4
  • 31
    • 70449525240 scopus 로고    scopus 로고
    • Applying the linear particle swarm optimization to a serial multi-echelon inventory model
    • M.F. Yang, and Y. Lin Applying the linear particle swarm optimization to a serial multi-echelon inventory model Expert Syst. Appl. 37 2010 2599 2608
    • (2010) Expert Syst. Appl. , vol.37 , pp. 2599-2608
    • Yang, M.F.1    Lin, Y.2
  • 32
    • 77951111988 scopus 로고    scopus 로고
    • Using fuzzy analytic hierarchy process and particle swarm optimisation for balanced and defective supply chain problems considering WEEE/RoHS directives
    • Z.H. Che Using fuzzy analytic hierarchy process and particle swarm optimisation for balanced and defective supply chain problems considering WEEE/RoHS directives Int. J. Prod. Res. 48 2010 3355 3381
    • (2010) Int. J. Prod. Res. , vol.48 , pp. 3355-3381
    • Che, Z.H.1
  • 33
    • 0001913404 scopus 로고
    • International supply chain management
    • J.B. Houlihan International supply chain management Int. J. Phys. D: Mater. Manage. 15 1 1985 22 38
    • (1985) Int. J. Phys. D: Mater. Manage. , vol.15 , Issue.1 , pp. 22-38
    • Houlihan, J.B.1
  • 34
    • 0001913403 scopus 로고
    • Using inventory for competitive advantage through supply chain management
    • T.C. Jones, and D.W. Riley Using inventory for competitive advantage through supply chain management Int. J. Phys. D: Mater. 15 5 1985 16 26
    • (1985) Int. J. Phys. D: Mater. , vol.15 , Issue.5 , pp. 16-26
    • Jones, T.C.1    Riley, D.W.2
  • 35
    • 34748857408 scopus 로고    scopus 로고
    • Responsive supply chain: A competitive strategy in a networked economy
    • A. Gunasekaran, K.H. Lai, and E.T.C. Cheng Responsive supply chain: a competitive strategy in a networked economy Omega 36 4 2008 549 564
    • (2008) Omega , vol.36 , Issue.4 , pp. 549-564
    • Gunasekaran, A.1    Lai, K.H.2    Cheng, E.T.C.3
  • 36
    • 63649103917 scopus 로고    scopus 로고
    • Effect of Inventory control on bullwhip in supply chain planning for multiple companies
    • H. Tominaga, T. Nishi, and M. Konshi Effect of Inventory control on bullwhip in supply chain planning for multiple companies Int. J. Innov. Comput. Inf. Contro. 4 3 2008 513 530
    • (2008) Int. J. Innov. Comput. Inf. Contro. , vol.4 , Issue.3 , pp. 513-530
    • Tominaga, H.1    Nishi, T.2    Konshi, M.3
  • 37
    • 63449099226 scopus 로고    scopus 로고
    • Disruption coordination of closed-loop supply chain network (1) - Models and theorems
    • L. Zhao, L. Qu, and M. Liu Disruption coordination of closed-loop supply chain network (1) - models and theorems Int. J. Innov. Comput. Inf. Contro. 4 11 2008 2955 2964
    • (2008) Int. J. Innov. Comput. Inf. Contro. , vol.4 , Issue.11 , pp. 2955-2964
    • Zhao, L.1    Qu, L.2    Liu, M.3
  • 38
    • 18144409832 scopus 로고    scopus 로고
    • The impact of supply chain relationship quality on quality performance
    • DOI 10.1016/j.ijpe.2004.05.008, PII S0925527304002956, Quality in Supply Chain Management and Logistics
    • B. Fynes, S. Burca, and C. Voss The impact of supply chain relationship quality on quality performance Int. J. Prod. Eng. 96 2005 339 354 (Pubitemid 40612730)
    • (2005) International Journal of Production Economics , vol.96 , Issue.3 , pp. 339-354
    • Fynes, B.1    Voss, C.2    De Burca, S.3
  • 39
    • 0032164289 scopus 로고    scopus 로고
    • Demand chain management in a global enterprise - Information management view
    • P. Korhonen, K. Huttunen, and E. Eloranta Demand chain management in global enterprise-information management view Prod. Plan. Control. 9 1998 526 531 (Pubitemid 128624343)
    • (1998) Production Planning and Control , vol.9 , Issue.6 , pp. 526-531
    • Korhonen, P.1    Huttunen, K.2    Eloranta, E.3
  • 40
    • 0032777406 scopus 로고    scopus 로고
    • Systems design framework for the extended enterprise
    • M. Davis, and D. O'Sullivan Systems design framework for the extended enterprise Prod. Plan. Control. 10 1999 3 18
    • (1999) Prod. Plan. Control. , vol.10 , pp. 3-18
    • Davis, M.1    O'Sullivan, D.2
  • 41
    • 0034513462 scopus 로고    scopus 로고
    • Integrated value chains and their implications from a business and technology standpoint
    • DOI 10.1016/S0167-9236(00)00081-6
    • M. Papazoglou, P. Ribbers, and A. Tsalgatidou Integrated value chains and their applications from a business and technology standpoint Decis. Support Syst. 29 2000 323 342 (Pubitemid 32034313)
    • (2000) Decision Support Systems , vol.29 , Issue.4 , pp. 323-342
    • Papazoglou, M.P.1    Ribbers, P.2    Tsalgatidou, A.3
  • 42
    • 0036807023 scopus 로고    scopus 로고
    • Fuzzy analytical approach to partnership selection in formation of virtual enterprises
    • L. Mikhailov Fuzzy analytical approach to partnership selection in formation of virtual enterprises Omega 30 5 2002 393 401
    • (2002) Omega , vol.30 , Issue.5 , pp. 393-401
    • Mikhailov, L.1
  • 43
    • 34247483009 scopus 로고    scopus 로고
    • Vendor selection in outsourcing
    • DOI 10.1016/j.cor.2006.01.009, PII S030505480600030X
    • V. Wadhwa, and A.R. Ravindran Vendor selection in outsourcing Comput. Oper. Res. 34 2007 3725 3737 (Pubitemid 46661042)
    • (2007) Computers and Operations Research , vol.34 , Issue.12 , pp. 3725-3737
    • Wadhwa, V.1    Ravindran, A.R.2
  • 44
    • 40849102642 scopus 로고    scopus 로고
    • A multi-phase model for product part change problems
    • DOI 10.1080/00207540600999144, PII 771146236
    • H.S. Wang, and Z.H. Che A multi-phase model for product part change problems Int. J. Prod. Res. 46 2008 2797 2825 (Pubitemid 351394253)
    • (2008) International Journal of Production Research , vol.46 , Issue.10 , pp. 2797-2825
    • Wang, H.S.1    Che, Z.H.2
  • 45
    • 58349093848 scopus 로고    scopus 로고
    • Developing fuzzy decision support system on supplier selection strategy
    • Y.H. Chen, and T.C. Wang Developing fuzzy decision support system on supplier selection strategy J. Manage. Syst. 12 2005 117 131
    • (2005) J. Manage. Syst. , vol.12 , pp. 117-131
    • Chen, Y.H.1    Wang, T.C.2
  • 46
    • 33750358829 scopus 로고    scopus 로고
    • A multi-objective supplier selection model under stochastic demand conditions
    • DOI 10.1016/j.ijpe.2006.03.001, PII S0925527306000715
    • Z. Liao, and J. Rittscher A multi-objective supplier selection model under stochastic demand conditions Int. J. Prod. Econ. 105 2007 150 159 (Pubitemid 44636203)
    • (2007) International Journal of Production Economics , vol.105 , Issue.1 , pp. 150-159
    • Liao, Z.1    Rittscher, J.2
  • 47
    • 58349096256 scopus 로고    scopus 로고
    • A three-phase integrated model for product configuration change problems
    • H.S. Wang, Z.H. Che, and M.J. Wang A three-phase integrated model for product configuration change problems Expert Syst. Appl. 36 2009 5491 5509
    • (2009) Expert Syst. Appl. , vol.36 , pp. 5491-5509
    • Wang, H.S.1    Che, Z.H.2    Wang, M.J.3
  • 48
    • 0030190601 scopus 로고    scopus 로고
    • A classification of literature on determining the lot size under quantity discounts
    • DOI 10.1016/0377-2217(95)00315-0
    • W.C. Benton, and S. Park A classification of literature on determining the lot size under quantity discounts Eur. J. Oper. Res. 92 1996 219 238 (Pubitemid 126372229)
    • (1996) European Journal of Operational Research , vol.92 , Issue.2 , pp. 219-238
    • Benton, W.C.1    Park, S.2
  • 49
    • 27844469769 scopus 로고    scopus 로고
    • Quantity discount versus lead time-dependent discount in an inter-organizational supply chain
    • DOI 10.1080/00207540500117995
    • D. Sirias, and S. Mehra Quantity discount versus lead time-dependent discount in an inter-organizational supply chain Int. J. Prod. Res. 43 16 2005 3481 3496 (Pubitemid 41648315)
    • (2005) International Journal of Production Research , vol.43 , Issue.16 , pp. 3481-3496
    • Sirias, D.1    Mehra, S.2
  • 50
    • 29344451419 scopus 로고    scopus 로고
    • Supply chain coordination with quantity discount policy
    • DOI 10.1016/j.ijpe.2005.05.008, PII S0925527305001349
    • J. Li, and L. Liu Supply chain coordination with quantity discount policy Int. J. Prod. Econ. 101 1 2006 89 98 (Pubitemid 43003694)
    • (2006) International Journal of Production Economics , vol.101 , pp. 89-98
    • Li, J.1    Liu, L.2
  • 53
    • 31944448941 scopus 로고    scopus 로고
    • A study of particle swarm optimization particle trajectories
    • DOI 10.1016/j.ins.2005.02.003, PII S0020025505000630
    • F. van den Bergh, and A.P. Engelbrecht A study of particle swarm optimization particle trajectories Inform. Sci. 176 8 2006 937 971 (Pubitemid 43190068)
    • (2006) Information Sciences , vol.176 , Issue.8 , pp. 937-971
    • Van Den Bergh, F.1    Engelbrecht, A.P.2
  • 55
    • 72949094752 scopus 로고    scopus 로고
    • Grey particle swarm algorithm for multi-objective optimization problems
    • F.H. Yu, H.B. Liu, and J.B. Dai Grey particle swarm algorithm for multi-objective optimization problems J. Comput Appl. 26 2006 2950 2952
    • (2006) J. Comput Appl. , vol.26 , pp. 2950-2952
    • Yu, F.H.1    Liu, H.B.2    Dai, J.B.3
  • 56
    • 0036464756 scopus 로고    scopus 로고
    • The particle swarm-explosion, stability, and convergence in a multidimensional complex space
    • DOI 10.1109/4235.985692, PII S1089778X02022099
    • M. Clerc, and J. Kennedy The particle swarm: explosion, stability, and convergence in a multi-dimensional complex space IEEE Trans. Evol. Comput. 6 2002 58 73 (Pubitemid 34404564)
    • (2002) IEEE Transactions on Evolutionary Computation , vol.6 , Issue.1 , pp. 58-73
    • Clerc, M.1    Kennedy, J.2
  • 57
    • 8844224953 scopus 로고    scopus 로고
    • A particle swarm optimizer with passive congregation
    • DOI 10.1016/j.biosystems.2004.08.003, PII S030326470400139X
    • S. He, Q.H. Wu, J.Y. Wen, J.R. Saunders, and R.C. Paton A particle swarm optimizer with passive congregation Biosystem 78 2004 135 147 (Pubitemid 39536138)
    • (2004) BioSystems , vol.78 , Issue.1-3 , pp. 135-147
    • He, S.1    Wu, Q.H.2    Wen, J.Y.3    Saunders, J.R.4    Paton, R.C.5
  • 58
    • 33644662825 scopus 로고    scopus 로고
    • Study of the application of PSO algorithms for nonlinear problems
    • S.T. Wang, and Z.J. Wang Study of the application of PSO algorithms for nonlinear problems J. Huazhong Univ. Sci. Technol. 33 2005 4 7
    • (2005) J. Huazhong Univ. Sci. Technol. , vol.33 , pp. 4-7
    • Wang, S.T.1    Wang, Z.J.2
  • 59
    • 30044437026 scopus 로고    scopus 로고
    • Estimation of model parameters using composite particle swarm optimization
    • H.J. Yu, L.P. Zhang, D.Z. Chen, X.F. Song, and S.X. Hu Estimation of model parameters using composite particle swarm optimization J. Chem. Eng. Chin. Univ. 19 2005 675 680
    • (2005) J. Chem. Eng. Chin. Univ. , vol.19 , pp. 675-680
    • Yu, H.J.1    Zhang, L.P.2    Chen, D.Z.3    Song, X.F.4    Hu, S.X.5


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.