메뉴 건너뛰기




Volumn 30, Issue 4, 2003, Pages 483-490

An optimal production run time with imperfect production processes and allowable shortages

Author keywords

Imperfect production process; Inventory; Optimal lot sizing; Shortages

Indexed keywords

COSTS; PRODUCTION CONTROL;

EID: 0037375114     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0305-0548(01)00091-0     Document Type: Article
Times cited : (151)

References (25)
  • 1
    • 0024063983 scopus 로고
    • An integrated cost model for joint optimization of process control and maintenance
    • Tagaras G. An integrated cost model for joint optimization of process control and maintenance. Journal of the Operational Research Society 1988;39:757-66.
    • (1988) Journal of the Operational Research Society , vol.39 , pp. 757-766
    • Tagaras, G.1
  • 2
    • 0024037430 scopus 로고
    • Optimality of zero-inventory policies for unreliable production facility
    • Bielecki T, Kumar PR. Optimality of zero-inventory policies for unreliable production facility. Operations Research 1988;36:532-41.
    • (1988) Operations Research , vol.36 , pp. 532-541
    • Bielecki, T.1    Kumar, P.R.2
  • 3
    • 0002058236 scopus 로고
    • The analysis of a production line with unreliable machine and random processing times
    • Hong Y, Glassey CR, Seong D. The analysis of a production line with unreliable machine and random processing times. IIE Transactions 1992;24:77-83.
    • (1992) IIE Transactions , vol.24 , pp. 77-83
    • Hong, Y.1    Glassey, C.R.2    Seong, D.3
  • 5
    • 0026927270 scopus 로고
    • Production batching with machine breakdowns and safety stocks
    • Groenevelt H, Pintelon L, Seidmann A. Production batching with machine breakdowns and safety stocks. Operations Research 1992;40:959-71.
    • (1992) Operations Research , vol.40 , pp. 959-971
    • Groenevelt, H.1    Pintelon, L.2    Seidmann, A.3
  • 6
    • 0030835106 scopus 로고    scopus 로고
    • Bounds for production lot sizing with machine breakdowns
    • Chung KJ. Bounds for production lot sizing with machine breakdowns. Computers and Industrial Engineering 1997;32:139-44.
    • (1997) Computers and Industrial Engineering , vol.32 , pp. 139-144
    • Chung, K.J.1
  • 7
    • 0032764917 scopus 로고    scopus 로고
    • Analysis of a production-inventory system with machine breakdowns and shutdowns
    • Liu B, Cao J. Analysis of a production-inventory system with machine breakdowns and shutdowns. Computers and Operations Research 1999;26:73-91.
    • (1999) Computers and Operations Research , vol.26 , pp. 73-91
    • Liu, B.1    Cao, J.2
  • 8
    • 0031141332 scopus 로고    scopus 로고
    • A extended EMQ model for a failure prone machine with general lifetime distribution
    • Kim CH, Hong Y. A extended EMQ model for a failure prone machine with general lifetime distribution. International Journal of Production Economics 1997;49:215-23.
    • (1997) International Journal of Production Economics , vol.49 , pp. 215-223
    • Kim, C.H.1    Hong, Y.2
  • 9
    • 0032683886 scopus 로고    scopus 로고
    • Optimal preventive maintenance in a production inventory system
    • Das TK, Sarkar S. Optimal preventive maintenance in a production inventory system. IIE Transactions 1999;31: 537-51.
    • (1999) IIE Transactions , vol.31 , pp. 537-551
    • Das, T.K.1    Sarkar, S.2
  • 10
    • 0025405053 scopus 로고
    • Optimal maintenance policies for single-server queuing system subject to breakdowns
    • Federgruen A, So KC. Optimal maintenance policies for single-server queuing system subject to breakdowns. Operations Research 1990;38:330-43.
    • (1990) Operations Research , vol.38 , pp. 330-343
    • Federgruen, A.1    So, K.C.2
  • 11
    • 0027927229 scopus 로고
    • Production-inventory systems with unreliable machines
    • Berg M, Posner MJM, Zhao H. Production-inventory systems with unreliable machines. Operations Research 1994;42:111-8.
    • (1994) Operations Research , vol.42 , pp. 111-118
    • Berg, M.1    Posner, M.J.M.2    Zhao, H.3
  • 12
    • 0022613610 scopus 로고
    • Optimal lot sizing, process quality improvement and setup cost reduction
    • Porteus EL. Optimal lot sizing, process quality improvement and setup cost reduction. Operations Research 1986;34:137-44.
    • (1986) Operations Research , vol.34 , pp. 137-144
    • Porteus, E.L.1
  • 13
    • 0022676316 scopus 로고
    • Economic production cycle with imperfect production processes
    • Rosenblatt MJ, Lee HL. Economic production cycle with imperfect production processes. IIE Transactions 1986;18:48-55.
    • (1986) IIE Transactions , vol.18 , pp. 48-55
    • Rosenblatt, M.J.1    Lee, H.L.2
  • 14
    • 0023412314 scopus 로고
    • Simultaneous determination of production cycle and inspection schedules in a production system
    • Lee HL, Rosenblatt MJ. Simultaneous determination of production cycle and inspection schedules in a production system. Management Science 1987;33:1125-36.
    • (1987) Management Science , vol.33 , pp. 1125-1136
    • Lee, H.L.1    Rosenblatt, M.J.2
  • 15
    • 0026220964 scopus 로고
    • Joint determination of production cycle and inspection intervals in a deteriorating production system
    • Lee JS, Park KS. Joint determination of production cycle and inspection intervals in a deteriorating production system. Journal of the Operational Research Society 1991;42:775-83.
    • (1991) Journal of the Operational Research Society , vol.42 , pp. 775-783
    • Lee, J.S.1    Park, K.S.2
  • 16
    • 0028396227 scopus 로고
    • The effects of inspection errors to the imperfect EMQ model
    • Liou MJ, Tseng ST, Lin TM. The effects of inspection errors to the imperfect EMQ model. IIE Transactions 1994;26:42-51.
    • (1994) IIE Transactions , vol.26 , pp. 42-51
    • Liou, M.J.1    Tseng, S.T.2    Lin, T.M.3
  • 17
    • 0030218654 scopus 로고    scopus 로고
    • Optimal preventive maintenance policy for deteriorating production systems
    • Tseng ST. Optimal preventive maintenance policy for deteriorating production systems. IIE Transactions 1996;28:687-94.
    • (1996) IIE Transactions , vol.28 , pp. 687-694
    • Tseng, S.T.1
  • 18
    • 0030284744 scopus 로고    scopus 로고
    • Optimal demand rate, lot sizing, and process reliability improvement decisions
    • Lee WJ, Kim D, Cabot V. Optimal demand rate, lot sizing, and process reliability improvement decisions. IIE Transactions 1996;28:941-52.
    • (1996) IIE Transactions , vol.28 , pp. 941-952
    • Lee, W.J.1    Kim, D.2    Cabot, V.3
  • 19
    • 0032021393 scopus 로고    scopus 로고
    • Optimal lot sizing and inspection policy for EMQ model with imperfect inspections
    • Makis V. Optimal lot sizing and inspection policy for EMQ model with imperfect inspections. Naval Research Logistics Quarterly 1998;45:165-86.
    • (1998) Naval Research Logistics Quarterly , vol.45 , pp. 165-186
    • Makis, V.1
  • 20
    • 0032627437 scopus 로고    scopus 로고
    • Integrated production maintenance and quality model for imperfect processes
    • Ben-Daya M. Integrated production maintenance and quality model for imperfect processes. IIE Transactions 1999;31:491-501.
    • (1999) IIE Transactions , vol.31 , pp. 491-501
    • Ben-Daya, M.1
  • 21
    • 0032761507 scopus 로고    scopus 로고
    • An optimal production run length in deteriorating production processes
    • Kim CH, Hong Y. An optimal production run length in deteriorating production processes. International Journal of Production Economics 1999;58:183-9.
    • (1999) International Journal of Production Economics , vol.58 , pp. 183-189
    • Kim, C.H.1    Hong, Y.2
  • 22
    • 0026205897 scopus 로고
    • EPQ with process capability and quality assurance considerations
    • Cheng TCE. EPQ with process capability and quality assurance considerations. Journal of the Operational Research Society 1991;42:713-20.
    • (1991) Journal of the Operational Research Society , vol.42 , pp. 713-720
    • Cheng, T.C.E.1
  • 23
    • 0026116409 scopus 로고
    • An economic order quantity model with demand-dependent unit production cost and imperfect production processes
    • Cheng TCE. An economic order quantity model with demand-dependent unit production cost and imperfect production processes. IIE Transactions 1991;23:23-8.
    • (1991) IIE Transactions , vol.23 , pp. 23-28
    • Cheng, T.C.E.1
  • 24
    • 0028698197 scopus 로고
    • Economic production lot size model with variable production rate and imperfect quality
    • Khouja M, Mehrez A. Economic production lot size model with variable production rate and imperfect quality. Journal of the Operational Research Society 1994;45:1405-17.
    • (1994) Journal of the Operational Research Society , vol.45 , pp. 1405-1417
    • Khouja, M.1    Mehrez, A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.