메뉴 건너뛰기




Volumn 37, Issue 3, 2010, Pages 2599-2608

Applying the linear particle swarm optimization to a serial multi-echelon inventory model

Author keywords

Multi echelon inventory model; Particle swarm optimization; Quality unreliability; Uncertain delivery lead time

Indexed keywords

COMPETITIVE EDGES; DELIVERY LEAD TIME; FITTING PARAMETERS; GLOBAL SUPPLY CHAIN MANAGEMENT; JUST-IN-TIME; LINEAR PARTICLES; MODEL-BASED; MULTI-ECHELON INVENTORY; MULTI-ECHELON INVENTORY MODEL; MULTIECHELON; QUALITY UNRELIABILITY; TOTAL COSTS; UNCERTAIN DELIVERY LEAD TIME;

EID: 70449525240     PISSN: 09574174     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.eswa.2009.08.021     Document Type: Article
Times cited : (24)

References (16)
  • 1
    • 27144557504 scopus 로고    scopus 로고
    • A PSO and Tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application
    • Allahverdi A., and Al-Anzi F.S. A PSO and Tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application. Computers and Operations Research 33 (2006) 1056-1080
    • (2006) Computers and Operations Research , vol.33 , pp. 1056-1080
    • Allahverdi, A.1    Al-Anzi, F.S.2
  • 2
    • 84985846646 scopus 로고
    • A joint economic lot size model for purchaser and vender
    • Banerjee A. A joint economic lot size model for purchaser and vender. Decision Sciences 17 (1986) 292-311
    • (1986) Decision Sciences , vol.17 , pp. 292-311
    • Banerjee, A.1
  • 3
    • 0034179707 scopus 로고    scopus 로고
    • Optimal policies for multi-echelon inventory problems with batch ordering
    • Chen F. Optimal policies for multi-echelon inventory problems with batch ordering. Operations Research 48 (2000) 376-389
    • (2000) Operations Research , vol.48 , pp. 376-389
    • Chen, F.1
  • 4
    • 0242269917 scopus 로고    scopus 로고
    • A multi-echelon integrated JIT inventory model using the time buffer and emergency borrowing policies to deal with random delivery lead times
    • Chiu H.N., and Huang H.L. A multi-echelon integrated JIT inventory model using the time buffer and emergency borrowing policies to deal with random delivery lead times. International Journal of Production Research 41 (2003) 2911-2931
    • (2003) International Journal of Production Research , vol.41 , pp. 2911-2931
    • Chiu, H.N.1    Huang, H.L.2
  • 6
    • 0033666935 scopus 로고    scopus 로고
    • Comparing inertia weights and constriction factors in particle swarm optimization
    • Piscataway, NJ: IEEE Service Center
    • Eberhart, R., & Shi, Y. (2000). Comparing inertia weights and constriction factors in particle swarm optimization. In Proceedings of IEEE congress on evolutionary computation (pp. 84-88). Piscataway, NJ: IEEE Service Center.
    • (2000) Proceedings of IEEE congress on evolutionary computation , pp. 84-88
    • Eberhart, R.1    Shi, Y.2
  • 7
    • 0034870045 scopus 로고    scopus 로고
    • Tracking and optimizing dynamic systems with particle swarm
    • Eberhart R., and Shi Y. Tracking and optimizing dynamic systems with particle swarm. Evolutionary Computation 1 (2001) 94-100
    • (2001) Evolutionary Computation , vol.1 , pp. 94-100
    • Eberhart, R.1    Shi, Y.2
  • 8
    • 0017416997 scopus 로고
    • An integrated inventory model for a single-supplier single-customer problem
    • Goyal S.K. An integrated inventory model for a single-supplier single-customer problem. International Journal of Production Research 15 (1977) 107-111
    • (1977) International Journal of Production Research , vol.15 , pp. 107-111
    • Goyal, S.K.1
  • 9
    • 84985781712 scopus 로고
    • A joint economic lot size model for purchaser and vendor: A comment
    • Goyal S.K. A joint economic lot size model for purchaser and vendor: A comment. Decision Sciences 19 (1988) 236-241
    • (1988) Decision Sciences , vol.19 , pp. 236-241
    • Goyal, S.K.1
  • 11
    • 0031103642 scopus 로고    scopus 로고
    • Implementation of JIT purchasing: An integrated approach
    • Ha D., and Kim S.L. Implementation of JIT purchasing: An integrated approach. Production Planning and Control 8 (1997) 152-157
    • (1997) Production Planning and Control , vol.8 , pp. 152-157
    • Ha, D.1    Kim, S.L.2
  • 13
    • 10144234131 scopus 로고    scopus 로고
    • A joint economic lot size model for raw material ordering, manufacturing setup, and finished goods delivering
    • Lee W. A joint economic lot size model for raw material ordering, manufacturing setup, and finished goods delivering. The International Journal of Management Science 33 (2003) 163-174
    • (2003) The International Journal of Management Science , vol.33 , pp. 163-174
    • Lee, W.1
  • 14
    • 33750001703 scopus 로고    scopus 로고
    • Controlling general multi-echelon distribution supply chains with improved reorder decision policy utilizing real-time shared stock information
    • Seo Y. Controlling general multi-echelon distribution supply chains with improved reorder decision policy utilizing real-time shared stock information. Computer and Industry Engineering 51 (2006) 229-246
    • (2006) Computer and Industry Engineering , vol.51 , pp. 229-246
    • Seo, Y.1
  • 15
    • 84879015433 scopus 로고    scopus 로고
    • Parameter selection in particle swarm optimization
    • Shi Y., and Eberhart R. Parameter selection in particle swarm optimization. Evolutionary Programming (1998) 591-600
    • (1998) Evolutionary Programming , pp. 591-600
    • Shi, Y.1    Eberhart, R.2
  • 16
    • 0023207074 scopus 로고
    • Setting planned lead times in serial production systems with tardiness costs
    • Yano C. Setting planned lead times in serial production systems with tardiness costs. Management Science 33 (1987) 96-106
    • (1987) Management Science , vol.33 , pp. 96-106
    • Yano, C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.