-
1
-
-
0033225131
-
Overview of design and operational issues of kanban systems
-
Akturk, M. S., & Erhun, F. (1999). An overview of design and operational issues of Kanban systems. International Journal of Production Research, 37(17), 3859-3881. (Pubitemid 30531934)
-
(1999)
International Journal of Production Research
, vol.37
, Issue.17
, pp. 3859-3881
-
-
Akturk, M.S.1
Erhun, F.2
-
2
-
-
77951123423
-
Optimizing of work in progress (WIP) in Kanban controlled production lines
-
Al-Tahat, M. D. (2005). Optimizing of work in progress (WIP) in Kanban controlled production lines. Dirasat International Journal for Engineering Sciences, 32(2), 123-132.
-
(2005)
Dirasat International Journal for Engineering Sciences
, vol.32
, Issue.2
, pp. 123-132
-
-
Al-Tahat, M.D.1
-
3
-
-
39349111333
-
Tracking production rate of CONstantWork-In Process (CONWIP) controlled job shop
-
Al-Tahat, M. D., & Jalham, S. I. (2008). Tracking production rate of CONstantWork-In Process (CONWIP) controlled job shop. International Journal of Integrated Supply Management, 4(2), 230-245.
-
(2008)
International Journal of Integrated Supply Management
, vol.4
, Issue.2
, pp. 230-245
-
-
Al-Tahat, M.D.1
Jalham, S.I.2
-
5
-
-
84986958388
-
A review of the Kanban production control research literature
-
Berkley, B. J. (1992). A review of the Kanban production control research literature. Production and Operations Management, 1(4), 393-411.
-
(1992)
Production and Operations Management
, vol.1
, Issue.4
, pp. 393-411
-
-
Berkley, B.J.1
-
6
-
-
0034288465
-
The extended Kanban control system for production coordination of assembly manufacturing systems
-
Chaouiya, C., Liberopoulos, G., & Dallery, Y. (2000). The extended Kanban control system for production coordination of assembly manufacturing systems. IIE Transactions, 32, 999-1012.
-
(2000)
IIE Transactions
, vol.32
, pp. 999-1012
-
-
Chaouiya, C.1
Liberopoulos, G.2
Dallery, Y.3
-
7
-
-
3543095160
-
Meta-heuristics for a complex pushpull production system
-
Corry, P., & Kozan, E. (2004). Meta-heuristics for a complex pushpull production system. Journal of IntelligentManufacturing, 15, 381-393.
-
(2004)
Journal of IntelligentManufacturing
, vol.15
, pp. 381-393
-
-
Corry, P.1
Kozan, E.2
-
8
-
-
4043157064
-
Unified framework for describing and comparing the dynamics of pull control policies
-
Di Mascolo, M., & Frein, Y. (2004). Unified framework for describing and comparing the dynamics of pull control policies. Annals of Operations Research, 125, 21-45. Kluwer Academic Publishers, Manufactured in The Netherlands. (Pubitemid 39063650)
-
(2004)
Annals of Operations Research
, vol.125
, Issue.1-4
, pp. 21-45
-
-
Bollon, J.-M.1
Di Mascolo, M.2
Frein, Y.3
-
10
-
-
0033749924
-
An evolution approach to select a pull system among Kanban, Conwip and Hybrid
-
Gaury, E. G. A., Pierreval, H., & Kleijnen, J. P. C. (2000). An evolution approach to select a pull system among Kanban, Conwip and Hybrid. Journal of Intelligent Manufacturing, 11, 157-167.
-
(2000)
Journal of Intelligent Manufacturing
, vol.11
, pp. 157-167
-
-
Gaury, E.G.A.1
Pierreval, H.2
Kleijnen, J.P.C.3
-
11
-
-
84856598392
-
-
University of Missouri-Rolla, Rolla, Missouri 65409-0370
-
Grasman, E., Tava, L. O., & John, R. B. (2003). Setting base stock levels in multi product systems with setups and random yield. University of Missouri-Rolla, Rolla, Missouri 65409-0370.
-
(2003)
Setting Base Stock Levels in Multi Product Systems with Setups and Random Yield
-
-
Grasman, E.1
Tava, L.O.2
John, R.B.3
-
12
-
-
0030284535
-
Analysis of production control systems kanban and CONWIP
-
Gstettner, S., & Kuhn, H. (1996). Analysis of production control systems Kanban and CONWIP. International Journal of Production Research, 34(11), 3253-3273. (Pubitemid 126713458)
-
(1996)
International Journal of Production Research
, vol.34
, Issue.11
, pp. 3253-3273
-
-
Gstettner, S.1
Kuhn, H.2
-
14
-
-
0031103287
-
An algorithm to dynamically adjust the number of Kanbans in stochastic processing times and variable demand environment
-
Gupta, S. M., & Al-Turki, Y. A. Y. (1997). An algorithm to dynamically adjust the number of Kansans in a stochastic processing times and variable demand environment. Production Planning and Control, 8(2), 133-141. (Pubitemid 127652359)
-
(1997)
Production Planning and Control
, vol.8
, Issue.2
, pp. 133-141
-
-
Gupta, S.M.1
Al-Turki, Y.A.Y.2
-
15
-
-
3543124095
-
Flexible kanban system
-
DOI 10.1108/01443579910271700
-
Gupta, S. M., Al-Turki, Y. A. Y., & Perry, R. F. (1999). Flexible Kanban system. International Journal of Operations and Production Management, 19(10), 1065-1093. (Pubitemid 39025997)
-
(1999)
International Journal of Operations and Production Management
, vol.19
, Issue.10
, pp. 1065-1093
-
-
Gupta, S.M.1
Al-Turki, Y.A.Y.2
Perry, R.F.3
-
16
-
-
0034691895
-
Determination of the number of containers, production kanbans and withdrawal kanbans; and scheduling in kanban flowshops - Part 1
-
DOI 10.1080/00207540050031904
-
Hemamalini, B., & Rajendran, C. (2000). Determination of the number of containers, production Kanbans and withdrawal Kanbans; and scheduling in Kanban flowshops-part 1. International Journal of Production Research, 38(11), 2529-2548. (Pubitemid 35401840)
-
(2000)
International Journal of Production Research
, vol.38
, Issue.11
, pp. 2529-2548
-
-
Hemamalini, B.1
Rajendran, C.2
-
17
-
-
0000262401
-
Overview of Kanban systems
-
Huang, C.-C., & Kusiak, A. (1996). Overview of Kanban systems. International Journal of Computer Integrated Manufacturing, 9(3), 169-189. (Pubitemid 126683326)
-
(1996)
International Journal of Computer Integrated Manufacturing
, vol.9
, Issue.3
, pp. 169-189
-
-
Huang, C.-C.1
Kusiak, A.2
-
18
-
-
0036535781
-
A CONWIP model for FMS control
-
DOI 10.1023/A:1014532129642
-
Ip, W. H., Young, K. L., Huang, M., & Wang, D. (2002). A CONWIP model for FMS control. Journal of Intelligent Manufacturing, 13, 109-117. (Pubitemid 34325673)
-
(2002)
Journal of Intelligent Manufacturing
, vol.13
, Issue.2
, pp. 109-117
-
-
Ip, W.H.1
Yung, K.L.2
Huang, M.3
Wang, D.4
-
19
-
-
0032183325
-
Material Flow Control and Scheduling in a Disassembly Environment
-
PII S036083529800028X
-
Kizilkaya, E., & Gupta, S. M. (1998). Material flow control and scheduling in a disassembly environment. Computers and Industrial Engineering, 35(1-2), 93-96. (Pubitemid 128457095)
-
(1998)
Computers and Industrial Engineering
, vol.35
, Issue.1-4
, pp. 93-96
-
-
Kizilkaya, E.1
Gupta, S.M.2
-
20
-
-
13544262364
-
Analysis of assembly systems controlled with Kanbans
-
Matta, A., Dallery, Y., & Di Mascolo, M. (2004). Analysis of assembly systems controlled with Kanbans. European Journal of Operational Research, 166(2), 310-336.
-
(2004)
European Journal of Operational Research
, vol.166
, Issue.2
, pp. 310-336
-
-
Matta, A.1
Dallery, Y.2
Di Mascolo, M.3
-
21
-
-
0032665117
-
Stochastic colored Petri net (SCPN) models of traditional and flexible Kanban systems
-
Moore, K. E., & Gupta, S. E. (1999). Stochastic colored Petri net (SCPN) models of traditional and flexible Kanban systems. International Journal of Production Research, 37(9), 2135-2158.
-
(1999)
International Journal of Production Research
, vol.37
, Issue.9
, pp. 2135-2158
-
-
Moore, K.E.1
Gupta, S.E.2
-
23
-
-
0042221729
-
Throughput equivalencies in fork/join queuing networks with finite buffers and general service times
-
Paik, C. H., & Tcha, D. W. (1995). Throughput equivalencies in fork/join queuing networks with finite buffers and general service times. International Journal of Production Research, 33(3), 695-703.
-
(1995)
International Journal of Production Research
, vol.33
, Issue.3
, pp. 695-703
-
-
Paik, C.H.1
Tcha, D.W.2
-
24
-
-
0017557653
-
Toyota production system and kanban system. Materialization of just-in-time and respect-for-human system
-
Sugimori, Y., Kusunoki, K., Cho, F., & Uchikawa, S. (1977). Toyota production system and Kanban system materialization of just in-time and respect-for-human system. International Journal of Production Research, 15(6), 553-564. (Pubitemid 8573924)
-
(1977)
International Journal of Production Research
, vol.15
, Issue.6
, pp. 553-564
-
-
Sugimori, Y.1
Kusunoki, K.2
Cho, F.3
Uchikawa, S.4
-
25
-
-
0035883116
-
A mathematical programming model for production planning using CONWIP
-
Wen, Z., & Mingyuan, C. (2001). A mathematical programming model for production planning using CONWIP. International Journal of Production Research, 39(12), 2723-2734.
-
(2001)
International Journal of Production Research
, vol.39
, Issue.12
, pp. 2723-2734
-
-
Wen, Z.1
Mingyuan, C.2
-
26
-
-
0031120491
-
Neural network identification of critical factors in a dynamic just-in-time kanban environment
-
Wray, B. A., Rakes, T. R., & Rees, L. P. (1997). Neural network identification of critical factors in a dynamic just-in-time Kanban environment. Journal of Intelligent Manufacturing, 8, 83-96. (Pubitemid 127507752)
-
(1997)
Journal of Intelligent Manufacturing
, vol.8
, Issue.2
, pp. 83-96
-
-
Wray, B.A.1
Rakes, T.R.2
Rees, L.P.3
-
27
-
-
0037139690
-
On control strategies in a multi-stage production system
-
DOI 10.1080/00207540110098454
-
Zhao, X., Qiguo, G., & Jiancai, W. (2002). On control strategies in a multi-stage production system. International Journal of Production Research, 40(5), 1155-1171. (Pubitemid 34593792)
-
(2002)
International Journal of Production Research
, vol.40
, Issue.5
, pp. 1155-1171
-
-
Zhao, X.1
Gong, Q.2
Wang, J.3
|