Determination of the number of containers, production kanbans and withdrawal kanbans; and scheduling in kanban flowshops - Part 1

Author keywords

[No Author keywords available]

Indexed keywords

MATERIALS HANDLING; OPTIMIZATION; PROBLEM SOLVING; SCHEDULING;

EID: 0034691895     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540050031904     Document Type: Article
Times cited : (8)

References (37)
  • 1
    • 0031529082 scopus 로고    scopus 로고
    • Analysis of local decision rules in a dual-kanban flow shop
    • Ardalan, A., 1997, Analysis of local decision rules in a dual-kanban flow shop. Decision Sciences, 28, 195-211.
    • (1997) Decision Sciences , vol.28 , pp. 195-211
    • Ardalan, A.1
  • 2
    • 0030242538 scopus 로고    scopus 로고
    • The impact of restricting the flow of inventory in serial production systems
    • Atwater, J. B. and Chakravorty, S. S., 1996, The impact of restricting the flow of inventory in serial production systems. International Journal of Production Research, 34, 2657-2669.
    • (1996) International Journal of Production Research , vol.34 , pp. 2657-2669
    • Atwater, J.B.1    Chakravorty, S.S.2
  • 3
    • 0001088045 scopus 로고
    • A simulation study of sequencing rules in a kanban-controlled flow shop
    • Berkley, B. J. and Kiran, A. S., 1991, A simulation study of sequencing rules in a kanban-controlled flow shop. Decision Sciences, 21, 660-669.
    • (1991) Decision Sciences , vol.21 , pp. 660-669
    • Berkley, B.J.1    Kiran, A.S.2
  • 4
    • 84986958388 scopus 로고
    • A review of the kanban production control research literature
    • Berkley, B. J., 1992, A review of the kanban production control research literature. Production and Operations Management, 1, 393-411.
    • (1992) Production and Operations Management , vol.1 , pp. 393-411
    • Berkley, B.J.1
  • 5
    • 84990578213 scopus 로고
    • Simulation tests of FCFS and SPT sequencing in kanban systems
    • Berkley, B. J., 1993, Simulation tests of FCFS and SPT sequencing in kanban systems. Decision Sciences, 24, 218-227.
    • (1993) Decision Sciences , vol.24 , pp. 218-227
    • Berkley, B.J.1
  • 6
    • 0030401255 scopus 로고    scopus 로고
    • A simulation study of container size in two-card kanban system
    • Berkley, B. J., 1996, A simulation study of container size in two-card kanban system. International Journal of Production Research, 34, 3417-3445.
    • (1996) International Journal of Production Research , vol.34 , pp. 3417-3445
    • Berkley, B.J.1
  • 7
    • 0014807274 scopus 로고
    • A heuristic algorithm for the «-job, m-machine sequencing problem
    • Campbell, H. A., Dudek, R. A. and Smith, M. L., 1970, A heuristic algorithm for the «-job, m-machine sequencing problem. Management Science, 16, B630-B637
    • (1970) Management Science , vol.16 , pp. B630-B637
    • Campbell, H.A.1    Dudek, R.A.2    Smith, M.L.3
  • 10
    • 0030134958 scopus 로고    scopus 로고
    • A survey of machine scheduling problems with blocking and no-wait in process
    • Hall, N. G. and Sriskandarajah, C., 1996, A survey of machine scheduling problems with blocking and no-wait in process. Operations Research, 44, 510-525.
    • (1996) Operations Research , vol.44 , pp. 510-525
    • Hall, N.G.1    Sriskandarajah, C.2
  • 11
    • 0029264383 scopus 로고
    • Flowshop sequencing with mean flowtime objective
    • Ho, J. C., 1995, Flowshop sequencing with mean flowtime objective. European Journal of Operational Research, 81, 571-578.
    • (1995) European Journal of Operational Research , vol.81 , pp. 571-578
    • Ho, J.C.1
  • 12
    • 0029632605 scopus 로고
    • Modified simulated annealing algorithms for the flow shop sequencing problems
    • Ishibuchi, H., Misaki, S and Tanaka, H., 1995, Modified simulated annealing algorithms for the flow shop sequencing problems. European Journal of Operational Research, 81, 388-398.
    • (1995) European Journal of Operational Research , vol.81 , pp. 388-398
    • Ishibuchi, H.1    Misaki, S.2    Tanaka, H.3
  • 14
  • 15
    • 0001057408 scopus 로고
    • Flowshop sequencing problems with limited buffer storage
    • Leisten, R., 1990, Flowshop sequencing problems with limited buffer storage. International Journal of Production Research, 28, 2085-2100.
    • (1990) International Journal of Production Research , vol.28 , pp. 2085-2100
    • Leisten, R.1
  • 16
    • 0027663578 scopus 로고
    • Two-machine group scheduling problem with blocking and anticipatory setups
    • Logendran, R. and Sriskandarajah, C., 1993, Two-machine group scheduling problem with blocking and anticipatory setups. European Journal of Operational Research, 69, 467-481.
    • (1993) European Journal of Operational Research , vol.69 , pp. 467-481
    • Logendran, R.1    Sriskandarajah, C.2
  • 21
    • 0020699921 scopus 로고
    • A heuristic algorithm for the m-machine, n-job flowshop sequencing problem
    • Nawaz, M., Enscore Jr., E. E. and Ham, I., 1983, A heuristic algorithm for the m-machine, n-job flowshop sequencing problem. OMEGA, 11, 91-95.
    • (1983) OMEGA , vol.11 , pp. 91-95
    • Nawaz, M.1    Enscore, E.E.2    Ham, I.3
  • 24
    • 0032043112 scopus 로고    scopus 로고
    • Scheduling to minimize mean tardiness and weighted mean tardiness in flowshop and flowline-based manufacturing cell
    • Parthasarathy, S. and Rajendran, C., 1998, Scheduling to minimize mean tardiness and weighted mean tardiness in flowshop and flowline-based manufacturing cell. Computers and Industrial Engineering, 34, 531-546.
    • (1998) Computers and Industrial Engineering , vol.34 , pp. 531-546
    • Parthasarathy, S.1    Rajendran, C.2
  • 26
    • 0029734386 scopus 로고    scopus 로고
    • Simultaneously determining the number of kanbans, container sizes and the final-assembly sequence of products in a just-in-time shop
    • Philipoom, P. R., Rees, L. P. and Taylor, III B. W., 1996, Simultaneously determining the number of kanbans, container sizes and the final-assembly sequence of products in a just-in-time shop. International Journal of Production Research, 34, 51-69.
    • (1996) International Journal of Production Research , vol.34 , pp. 51-69
    • Philipoom, P.R.1    Rees, L.P.2    Taylor, B.W.3
  • 28
    • 0001040519 scopus 로고
    • A heuristic for scheduling in flowshop and flowline-based manufacturing cell with multi-criteria
    • Rajendran, C., 1994, A heuristic for scheduling in flowshop and flowline-based manufacturing cell with multi-criteria. International Journal of Production Research, 32, 2541-2558.
    • (1994) International Journal of Production Research , vol.32 , pp. 2541-2558
    • Rajendran, C.1
  • 29
    • 0033099220 scopus 로고    scopus 로고
    • Formulations and heuristics for scheduling in a kanban flowshop to minimize the sum of weighted flowtime, weighted tardiness and weighted earliness of containers
    • Rajendran, C., 1999, Formulations and heuristics for scheduling in a kanban flowshop to minimize the sum of weighted flowtime, weighted tardiness and weighted earliness of containers. International Journal of Production Research, 37, 1137-1158.
    • (1999) International Journal of Production Research , vol.37 , pp. 1137-1158
    • Rajendran, C.1
  • 30
    • 0031275336 scopus 로고    scopus 로고
    • An efficient heuristic for scheduling in a flowshop to minimize total weighted flowtime of jobs
    • Rajendran, C. and Ziegler, H., 1997, An efficient heuristic for scheduling in a flowshop to minimize total weighted flowtime of jobs. European Journal of Operational Research, 103, 129-138.
    • (1997) European Journal of Operational Research , vol.103 , pp. 129-138
    • Rajendran, C.1    Ziegler, H.2
  • 31
    • 0031200164 scopus 로고    scopus 로고
    • Flow control in kanban based multicell manufacturing: I. A structural analysis of general blocking design space
    • Ramesh, r., Prasad, S. Y. and Thirumurthy, M. V., 1997a, Flow control in kanban based multicell manufacturing: I. A structural analysis of general blocking design space. International Journal of Production Research, 35, 2327-2343.
    • (1997) International Journal of Production Research , vol.35 , pp. 2327-2343
    • Ramesh, R.1    Prasad, S.Y.2    Thirumurthy, M.V.3
  • 32
    • 0031233937 scopus 로고    scopus 로고
    • Flow control in kanban based multicell manufacturing: II. Design of control systems and experimental results
    • Ramesh, R., Prasad, S. Y. and Thirumurthy, M. V., 1997b, Flow control in kanban based multicell manufacturing: II. Design of control systems and experimental results. International Journal of Production Research, 35, 2413-2427.
    • (1997) International Journal of Production Research , vol.35 , pp. 2413-2427
    • Ramesh, R.1    Prasad, S.Y.2    Thirumurthy, M.V.3
  • 33
    • 0031273822 scopus 로고    scopus 로고
    • Scheduling in kanban-controlled flowshop with dual blocking mechanisms and missing operations for part-types
    • Sharadapriyadarshini, B. and Rajendran, C., 1997a, Scheduling in kanban-controlled flowshop with dual blocking mechanisms and missing operations for part-types. International Journal of Production Research, 35, 3133-3156.
    • (1997) International Journal of Production Research , vol.35 , pp. 3133-3156
    • Sharadapriyadarshini, B.1    Rajendran, C.2
  • 35
    • 0025700701 scopus 로고
    • Some efficient heuristic methods for the flowshop sequencing problem
    • Taillard, E., 1990, Some efficient heuristic methods for the flowshop sequencing problem. European Journal of Operational Research, 47, 65-79.
    • (1990) European Journal of Operational Research , vol.47 , pp. 65-79
    • Taillard, E.1
  • 36
    • 0025488637 scopus 로고
    • Modelling kanban-based demand-pull systems: A survey and critique
    • Uzsoy, R. and Martin-Vega, L., 1990, Modelling kanban-based demand-pull systems: a survey and critique. Manufacturing Review, 3, 155-160.
    • (1990) Manufacturing Review , vol.3 , pp. 155-160
    • Uzsoy, R.1    Martin-Vega, L.2
  • 37
    • 0024700013 scopus 로고
    • A new heuristic method for the flowshop sequencing problem
    • Widmer, M. and Hertz, A., 1989, A new heuristic method for the flowshop sequencing problem. European Journal of Operational Research, 41, 186-193.
    • (1989) European Journal of Operational Research , vol.41 , pp. 186-193
    • Widmer, M.1    Hertz, A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.