-
1
-
-
84990556304
-
Application of the back propagation neural network algorithm with monotonicity constraints for two-group classification problems
-
Archer, N. P. and Wang, S. (1993) Application of the back propagation neural network algorithm with monotonicity constraints for two-group classification problems. Decision Sciences, 24(1), 60-75.
-
(1993)
Decision Sciences
, vol.24
, Issue.1
, pp. 60-75
-
-
Archer, N.P.1
Wang, S.2
-
2
-
-
0000357181
-
A model for continuous review pull policies in serial inventory systems
-
Badinelli, R. D. (1992) A model for continuous review pull policies in serial inventory systems. Operations Research, 40(1), 142-156.
-
(1992)
Operations Research
, vol.40
, Issue.1
, pp. 142-156
-
-
Badinelli, R.D.1
-
3
-
-
0026153765
-
Determining the number of kanbans in a multiproduct multistage production system
-
Bard, J. and Golany, B. (1991) Determining the number of kanbans in a multiproduct multistage production system. International Journal of Production Research, 29(5), 881-895.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.5
, pp. 881-895
-
-
Bard, J.1
Golany, B.2
-
4
-
-
84986958388
-
A review of the kanban production control research literature
-
Berkley, B. J. (1992) A review of the kanban production control research literature. Production and Operations Management, 1(4), 393-411.
-
(1992)
Production and Operations Management
, vol.1
, Issue.4
, pp. 393-411
-
-
Berkley, B.J.1
-
5
-
-
0023330726
-
A mathematical programming approach to a deterministic kanban system
-
Bitran, G. and Chang, L. (1987) A mathematical programming approach to a deterministic kanban system. Management Science, 33(4), 427-442.
-
(1987)
Management Science
, vol.33
, Issue.4
, pp. 427-442
-
-
Bitran, G.1
Chang, L.2
-
6
-
-
84944661914
-
Rank transformations as a bridge between parametric and nonparametric statistics
-
Conover, W. J. and Iman, R. L. (1981) Rank transformations as a bridge between parametric and nonparametric statistics. The American Statistician, 35(3), 124-129.
-
(1981)
The American Statistician
, vol.35
, Issue.3
, pp. 124-129
-
-
Conover, W.J.1
Iman, R.L.2
-
7
-
-
0002082384
-
Integrating Kanban-type pull systems and MRP-type push systems: Insights from a Markovian model
-
Deleersnyder, J., Hodgson, T., King, R. E., O'Grady, P. and Savva, A. (1992) Integrating Kanban-type pull systems and MRP-type push systems: insights from a Markovian model. IIE Transactions, 24(3), 43-56.
-
(1992)
IIE Transactions
, vol.24
, Issue.3
, pp. 43-56
-
-
Deleersnyder, J.1
Hodgson, T.2
King, R.E.3
O'Grady, P.4
Savva, A.5
-
8
-
-
0000436165
-
Kanban controlled pull systems: An analytic approach
-
Deleersnyder, J., Hodgson, T., Muller, H. and O'Grady, P. (1989) Kanban controlled pull systems: an analytic approach. Management Science, 35(9), 1079-1091.
-
(1989)
Management Science
, vol.35
, Issue.9
, pp. 1079-1091
-
-
Deleersnyder, J.1
Hodgson, T.2
Muller, H.3
O'Grady, P.4
-
9
-
-
0027684952
-
The determination of the optimal number of kanbans in a just-in-time production system
-
Fukukawa, T. and Hong, S. (1993), The determination of the optimal number of kanbans in a just-in-time production system. Computers and Industrial Engineering, 24(4), 551-559.
-
(1993)
Computers and Industrial Engineering
, vol.24
, Issue.4
, pp. 551-559
-
-
Fukukawa, T.1
Hong, S.2
-
12
-
-
0024607145
-
A system dynamics model for a multi-stage multi-line dual-card JIT-Kanban system
-
Gupta, Y. and Gupta, M. (1989) A system dynamics model for a multi-stage multi-line dual-card JIT-Kanban system. International Journal of Production Research, 27(2), 309-352.
-
(1989)
International Journal of Production Research
, vol.27
, Issue.2
, pp. 309-352
-
-
Gupta, Y.1
Gupta, M.2
-
14
-
-
0042975453
-
Neural networks for real-world problems: Tutorial SP2, unpublished tutorial booklet
-
AAAI Anaheim, CA
-
Hinton, G., and Touretzky D. S. (1991) Neural networks for real-world problems: tutorial SP2, unpublished tutorial booklet, in Proceedings The Ninth National Conference on Artificial Intelligence, AAAI Anaheim, CA.
-
(1991)
Proceedings the Ninth National Conference on Artificial Intelligence
-
-
Hinton, G.1
Touretzky, D.S.2
-
15
-
-
84989486136
-
A simulation analysis of the Japanese just-in-time technique (with Kanbans) for a, multi-line, multi-stage production system
-
Huang, P., Rees, L. and Taylor, B. (1983) A simulation analysis of the Japanese just-in-time technique (with Kanbans) for a, multi-line, multi-stage production system. Decision Sciences, 14(3), 326-344.
-
(1983)
Decision Sciences
, vol.14
, Issue.3
, pp. 326-344
-
-
Huang, P.1
Rees, L.2
Taylor, B.3
-
16
-
-
2342589756
-
A comparison of distribution-free procedures for the analysis of complete blocks
-
Unpublished manuscript presented Las Vegas, NV, November
-
Iman, R. L. and Conover, W. J. (1980) A comparison of distribution-free procedures for the analysis of complete blocks, Unpublished manuscript presented at the annual meeting of the American Institute for Decision Sciences, Las Vegas, NV, November.
-
(1980)
Annual Meeting of the American Institute for Decision Sciences
-
-
Iman, R.L.1
Conover, W.J.2
-
17
-
-
2342627632
-
-
NeuralWare, Inc., Pittsburgh, PA
-
Klimasauskas, C., Guiver, J. and Pelton, G. (1989) NeuralWorks Professional II and NeuralWorks Explorer, Volume 1, Neural Computing, NeuralWare, Inc., Pittsburgh, PA.
-
(1989)
NeuralWorks Professional II and NeuralWorks Explorer, Volume 1, Neural Computing
, vol.1
-
-
Klimasauskas, C.1
Guiver, J.2
Pelton, G.3
-
18
-
-
0023167521
-
Kanban, MRP and shaping the manufacturing environment
-
Krajewski, L., King, B., Ritzman, L. and Wong, D. (1987) Kanban, MRP and shaping the manufacturing environment. Management Science, 33(1), 39-57.
-
(1987)
Management Science
, vol.33
, Issue.1
, pp. 39-57
-
-
Krajewski, L.1
King, B.2
Ritzman, L.3
Wong, D.4
-
20
-
-
0025894459
-
A dynamic programming model for the Kanban assignment problem in a multistage multiperiod production system
-
Li, A. and Co, H. (1991) A dynamic programming model for the Kanban assignment problem in a multistage multiperiod production system. International Journal of Production Research, 29(1), 1-16.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.1
, pp. 1-16
-
-
Li, A.1
Co, H.2
-
21
-
-
84985779120
-
An approximate solution to deterministic Kanban systems
-
Moeemi, F. and Chang, Y.-L. (1990) An approximate solution to deterministic Kanban systems. Decision Sciences, 21(3), 596-607.
-
(1990)
Decision Sciences
, vol.21
, Issue.3
, pp. 596-607
-
-
Moeemi, F.1
Chang, Y.-L.2
-
22
-
-
0003449926
-
-
Industrial Engineering and Management Press, Norcross, GA
-
Monden, Y. (1983) Toyota Production System, Industrial Engineering and Management Press, Norcross, GA.
-
(1983)
Toyota Production System
-
-
Monden, Y.1
-
23
-
-
0029734386
-
Simultaneously determining the number of Kanbans, container sizes, and the sequence of products in a just-in-time shop
-
Philipoom, P., Rees, L. and Taylor, B. (1996) Simultaneously determining the number of Kanbans, container sizes, and the sequence of products in a just-in-time shop. International Journal of Production Research, 34(1), 51-70.
-
(1996)
International Journal of Production Research
, vol.34
, Issue.1
, pp. 51-70
-
-
Philipoom, P.1
Rees, L.2
Taylor, B.3
-
24
-
-
0023310442
-
An investigation of the factors influencing the number of Kanbans required in the implementation of the JIT technique with Kanbans
-
Philipoom, P., Rees, L., Taylor, B. and Huang, P. (1987) An investigation of the factors influencing the number of Kanbans required in the implementation of the JIT technique with Kanbans. International Journal of Production Research, 25(3), 457-472.
-
(1987)
International Journal of Production Research
, vol.25
, Issue.3
, pp. 457-472
-
-
Philipoom, P.1
Rees, L.2
Taylor, B.3
Huang, P.4
-
25
-
-
84990604706
-
Using neural networks to determine internally-set due-date assignments for shop scheduling
-
Philipoom, P. R., Rees, L. P. and Wiegmann, L. (1994) Using neural networks to determine internally-set due-date assignments for shop scheduling. Decision Sciences, 25(5), 825-851.
-
(1994)
Decision Sciences
, vol.25
, Issue.5
, pp. 825-851
-
-
Philipoom, P.R.1
Rees, L.P.2
Wiegmann, L.3
-
26
-
-
0025262876
-
A mathematical programming approach for determining work center lotsizes in a just-in-time system with signal Kanbans
-
Philipoom, P., Taylor, B., Huang, P. and Rees, L. (1990) A mathematical programming approach for determining work center lotsizes in a just-in-time system with signal Kanbans. International Journal of Production Research, 28(1), 1-15.
-
(1990)
International Journal of Production Research
, vol.28
, Issue.1
, pp. 1-15
-
-
Philipoom, P.1
Taylor, B.2
Huang, P.3
Rees, L.4
-
27
-
-
0028429481
-
A review of optimisation models of Kanban-based production systems
-
Price, W., Gravel, M. and Nsakanda, A. (1994) A review of optimisation models of Kanban-based production systems. European Journal of Operational Research, 75(1), 1-12.
-
(1994)
European Journal of Operational Research
, vol.75
, Issue.1
, pp. 1-12
-
-
Price, W.1
Gravel, M.2
Nsakanda, A.3
-
28
-
-
0010908250
-
-
Working Paper, Faculté des sciences de l'administration, Université Laval, November 1992
-
Price, W., Gravel, M., Nsakanda, A. and Cantin, F. (1992) A mathematical programming model of a Kanban job-shop, Working Paper, Faculté des sciences de l'administration, Université Laval, November 1992.
-
(1992)
A Mathematical Programming Model of a Kanban Job-shop
-
-
Price, W.1
Gravel, M.2
Nsakanda, A.3
Cantin, F.4
-
30
-
-
0001870328
-
A simulation analysis of due date assignment rules
-
Ragatz, G. and Mabert, V. (1984) A simulation analysis of due date assignment rules. Journal of Operations Management, 5(1), 27-39.
-
(1984)
Journal of Operations Management
, vol.5
, Issue.1
, pp. 27-39
-
-
Ragatz, G.1
Mabert, V.2
-
31
-
-
0012361558
-
Estimating the number of Kanbans using neural networks
-
Rakes, T., Rees, L., Siochi, F. and Wray, B. (1994) Estimating the number of Kanbans using neural networks. Advances in AI in Finance, Marketing, and Management, 1, 125-139.
-
(1994)
Advances in AI in Finance, Marketing, and Management
, vol.1
, pp. 125-139
-
-
Rakes, T.1
Rees, L.2
Siochi, F.3
Wray, B.4
-
32
-
-
0023365980
-
Dynamically adjusting the number of Kanbans in a just-in-time production system using estimated values of leadtime
-
Rees, L., Philipoom, P., Taylor, B. and Huang, P. (1987) Dynamically adjusting the number of Kanbans in a just-in-time production system using estimated values of leadtime. IIE Transactions, 19(2), 199-207.
-
(1987)
IIE Transactions
, vol.19
, Issue.2
, pp. 199-207
-
-
Rees, L.1
Philipoom, P.2
Taylor, B.3
Huang, P.4
-
34
-
-
0024034255
-
Regenerative pull (Kanban) production control policies
-
Seidmann, A. (1988) Regenerative pull (Kanban) production control policies. European Journal of Operational Research, 35(3), 401-413.
-
(1988)
European Journal of Operational Research
, vol.35
, Issue.3
, pp. 401-413
-
-
Seidmann, A.1
-
36
-
-
0012398064
-
-
Dissertation, Department of Management Science, Virginia Tech, Blacksburg, VA
-
Wray, B. A. (1992a), Prediction and control in a Just-In-Time environment using neural networks, Dissertation, Department of Management Science, Virginia Tech, Blacksburg, VA.
-
(1992)
Prediction and Control in a Just-In-Time Environment Using Neural Networks
-
-
Wray, B.A.1
-
37
-
-
0012445983
-
Dynamically adjusting the number of Kanbans in a stochastic JIT environment: An application of neural networks
-
Decision Sciences Institute, Atlanta
-
Wray, B. A. (1992b), Dynamically adjusting the number of Kanbans in a stochastic JIT environment: an application of neural networks, in Proceedings of the Twenty-Fourth Annual Meeting of the Decision Sciences Institute, Decision Sciences Institute, Atlanta, pp. 735-737.
-
(1992)
Proceedings of the Twenty-Fourth Annual Meeting of the Decision Sciences Institute
, pp. 735-737
-
-
Wray, B.A.1
|