-
1
-
-
33847267256
-
A mixed integer programming model for advanced planning and scheduling (APS)
-
Chen, K. and Ji, P. A mixed integer programming model for advanced planning and scheduling (APS). Eur. J. Opl. Res., 2007, 181(1), 515-522.
-
(2007)
Eur. J. Opl. Res
, vol.181
, Issue.1
, pp. 515-522
-
-
Chen, K.1
Ji, P.2
-
2
-
-
0020832935
-
Mathematical programming approaches to capacity-constrained MRP systems: Review, formulation, problem reduction
-
Billington, P. J., McClain, J. D., and Thomas, L. J. Mathematical programming approaches to capacity-constrained MRP systems: review, formulation, problem reduction. Mgmt Sci., 1983, 29(10), 1126-1141.
-
(1983)
Mgmt Sci
, vol.29
, Issue.10
, pp. 1126-1141
-
-
Billington, P.J.1
McClain, J.D.2
Thomas, L.J.3
-
3
-
-
0031126052
-
Integrating MRP and finite capacity planning
-
Taal, M. and Wortmami, J. C. Integrating MRP and finite capacity planning. Prod. Plann. Control, 1997, 8 (3), 245-254.
-
(1997)
Prod. Plann. Control
, vol.8
, Issue.3
, pp. 245-254
-
-
Taal, M.1
Wortmami, J.C.2
-
4
-
-
0023343801
-
Scheduling tasks with due dates in a fabrication -assembly process
-
Faaland, B. and Schmitt, T. Scheduling tasks with due dates in a fabrication -assembly process. Opl. Res., 1987, 35(3), 378-388.
-
(1987)
Opl. Res
, vol.35
, Issue.3
, pp. 378-388
-
-
Faaland, B.1
Schmitt, T.2
-
5
-
-
84990557283
-
A new framework for manufacturing planning and control systems
-
Sum, C. C. and Hill, A. V. A new framework for manufacturing planning and control systems. Decision Sci. 1993, 24(4), 739-760.
-
(1993)
Decision Sci
, vol.24
, Issue.4
, pp. 739-760
-
-
Sum, C.C.1
Hill, A.V.2
-
6
-
-
0030219108
-
Just-in time' production of large assemblies
-
Agrawal, A., Harhalakis, G., Minis, I., and Nagi, R. 'Just-in time' production of large assemblies. IIE Trans., 1996, 28(8), 653-667.
-
(1996)
IIE Trans
, vol.28
, Issue.8
, pp. 653-667
-
-
Agrawal, A.1
Harhalakis, G.2
Minis, I.3
Nagi, R.4
-
7
-
-
0032638699
-
Production planning using a hybrid simulation - analytical approach
-
Byrne, M. D. and Bakir, M. A. Production planning using a hybrid simulation - analytical approach. Int. J. Prod. Econ., 1999, 59(1-3), 305-311.
-
(1999)
Int. J. Prod. Econ
, vol.59
, Issue.1-3
, pp. 305-311
-
-
Byrne, M.D.1
Bakir, M.A.2
-
8
-
-
0035929278
-
Extended model for a hybrid production planning approach
-
Kim, B. and Kim, S. Extended model for a hybrid production planning approach. Int. J. Prod. Econ., 2001, 73(2), 165-173.
-
(2001)
Int. J. Prod. Econ
, vol.73
, Issue.2
, pp. 165-173
-
-
Kim, B.1
Kim, S.2
-
9
-
-
9544247739
-
Production planning: An improved hybrid approach
-
Byrne, M. D. and Hossain, M. M. Production planning: an improved hybrid approach. Int. J. Prod. Econ., 2005, 93-94, 225-229.
-
(2005)
Int. J. Prod. Econ
, vol.93-94
, pp. 225-229
-
-
Byrne, M.D.1
Hossain, M.M.2
-
10
-
-
0020844913
-
A unifying view of hybrid simulation/analytic models and modeling
-
Shanthikumar, J. G. and Sargent, R. G. A unifying view of hybrid simulation/analytic models and modeling. Opl. Res., 1983, 31(6), 1030-1052.
-
(1983)
Opl. Res
, vol.31
, Issue.6
, pp. 1030-1052
-
-
Shanthikumar, J.G.1
Sargent, R.G.2
-
11
-
-
0030150549
-
Production planning methodology for semiconductor manufacturing based on iterative simulation and LP calculations
-
Hung, Y.-F. and Leachman, R. C. Production planning methodology for semiconductor manufacturing based on iterative simulation and LP calculations. IEEE Trans. Semiconductor. Mf, 1996, 9(2), 257-269.
-
(1996)
IEEE Trans. Semiconductor. Mf
, vol.9
, Issue.2
, pp. 257-269
-
-
Hung, Y.-F.1
Leachman, R.C.2
-
12
-
-
13844312976
-
Incorporating expedited time and cost of the end product into the product structure diagram
-
Chiu, Y. S. P. and Chiu, S. W. Incorporating expedited time and cost of the end product into the product structure diagram. Int. J. Much. Tools Mf, 2005, 45(7-8), 987-991.
-
(2005)
Int. J. Much. Tools Mf
, vol.45
, Issue.7-8
, pp. 987-991
-
-
Chiu, Y.S.P.1
Chiu, S.W.2
-
13
-
-
57049133836
-
-
A guide to the project management body of knowledge (PMBOK guide), Third edition, 2004 (Project Management Institute Press, USA).
-
A guide to the project management body of knowledge (PMBOK guide), Third edition, 2004 (Project Management Institute Press, USA).
-
-
-
-
14
-
-
0036531774
-
Network decomposition techniques for resource-constrained project scheduling
-
Sprecher, A. Network decomposition techniques for resource-constrained project scheduling. J. Opl. Res. Soc., 2002, 53(4), 405-414.
-
(2002)
J. Opl. Res. Soc
, vol.53
, Issue.4
, pp. 405-414
-
-
Sprecher, A.1
-
15
-
-
33845270624
-
Experimental investigation of heuristics for resource-constrained project scheduling: An update
-
Kolisch, R. and Hartmann, S. Experimental investigation of heuristics for resource-constrained project scheduling: an update. Eur. J. Opl. Res., 2006, 174(1), 23-37.
-
(2006)
Eur. J. Opl. Res
, vol.174
, Issue.1
, pp. 23-37
-
-
Kolisch, R.1
Hartmann, S.2
-
16
-
-
84989743918
-
A new heuristic solution method in resource-constrained project scheduling
-
Bell, C. E. and Han, J. A new heuristic solution method in resource-constrained project scheduling. Naval Res. Log., 1991, 38, 315-331.
-
(1991)
Naval Res. Log
, vol.38
, pp. 315-331
-
-
Bell, C.E.1
Han, J.2
-
17
-
-
0019342681
-
Scheduling subject to resource constraints: Classification and complexity
-
Blazewicz, J., Lenstra, J., and Rinnooy Kan, A. Scheduling subject to resource constraints: classification and complexity. Discrete Appl. Math., 1983, 5,11-24.
-
(1983)
Discrete Appl. Math
, vol.5
, pp. 11-24
-
-
Blazewicz, J.1
Lenstra, J.2
Rinnooy Kan, A.3
-
18
-
-
0030124780
-
A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes
-
Boctor, F. F. A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes. Eur. J. Opl. Res., 1996, 90(2), 349-361.
-
(1996)
Eur. J. Opl. Res
, vol.90
, Issue.2
, pp. 349-361
-
-
Boctor, F.F.1
-
19
-
-
0016498438
-
A comparison of heuristic and optimum solutions in resource-constrained project scheduling
-
Davis, E. W. and Patterson, J. H. A comparison of heuristic and optimum solutions in resource-constrained project scheduling. Mgmt Sci., 1975, 21(8), 944-955.
-
(1975)
Mgmt Sci
, vol.21
, Issue.8
, pp. 944-955
-
-
Davis, E.W.1
Patterson, J.H.2
-
20
-
-
57049120917
-
Applying fuzzy control chart in earned value analysis: A new application
-
Noori, S., Bagherpour, M., and Zareei, A. Applying fuzzy control chart in earned value analysis: a new application. World Appl. Sci. J., 2008, 3(4), 684-690.
-
(2008)
World Appl. Sci. J
, vol.3
, Issue.4
, pp. 684-690
-
-
Noori, S.1
Bagherpour, M.2
Zareei, A.3
|