메뉴 건너뛰기




Volumn 34, Issue 3, 1996, Pages 715-725

An optimal control model for continuous time production and setup scheduling

Author keywords

[No Author keywords available]

Indexed keywords


EID: 0000149356     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207549608904930     Document Type: Article
Times cited : (26)

References (15)
  • 2
    • 0024037430 scopus 로고
    • Optimality of zero-inventory policies for unreliable manufacturing systems
    • Bielecki, T., and Kumar, P. R., 1988, Optimality of zero-inventory policies for unreliable manufacturing systems. Operations Research, 36, 532-541.
    • (1988) Operations Research , vol.36 , pp. 532-541
    • Bielecki, T.1    Kumar, P.R.2
  • 5
    • 0028464640 scopus 로고
    • Necessary optimality conditions for a generalized problem of production scheduling
    • Khmelnitsky, E., and Kogan, K., 1994, Necessary optimality conditions for a generalized problem of production scheduling. Optimal Control Applications and Methods, 15, 215-222.
    • (1994) Optimal Control Applications and Methods , vol.15 , pp. 215-222
    • Khmelnitsky, E.1    Kogan, K.2
  • 6
    • 0020915621 scopus 로고
    • An algorithm for the computer control of a flexible manufacturing system
    • Kimemia, J. G., and Gershwin, S. B., 1983, An algorithm for the computer control of a flexible manufacturing system. IIE Transactions, 15, 353-362.
    • (1983) IIE Transactions , vol.15 , pp. 353-362
    • Kimemia, J.G.1    Gershwin, S.B.2
  • 7
    • 0025401166 scopus 로고
    • Dynamic Instabilities and Stabilization Methods in Distributed Real-Time Scheduling of Manufacturing Systems
    • Kumar, P. R., and Seidman, T. 1., 1990, Dynamic Instabilities and Stabilization Methods in Distributed Real-Time Scheduling of Manufacturing Systems. IEEE Transactions on Automatic Control, 35, 289-298.
    • (1990) IEEE Transactions on Automatic Control , vol.35 , pp. 289-298
    • Kumar, P.R.1    Seidman, T.2
  • 8
    • 0024714899 scopus 로고
    • Aggregate scheduling of a flexible machining and assembly system
    • Kusiak, A., 1989, Aggregate scheduling of a flexible machining and assembly system. IEEE Transaction on Robotics and Automation, 5, 451-459.
    • (1989) IEEE Transaction on Robotics and Automation , vol.5 , pp. 451-459
    • Kusiak, A.1
  • 9
    • 0002549571 scopus 로고
    • On capacity modelling for production planning with alternative machine types
    • Leachman, R. C., and Carmon, T. F., 1992, On capacity modelling for production planning with alternative machine types. HE Transactions, 24, 62-72.
    • (1992) HE Transactions , vol.24 , pp. 62-72
    • Leachman, R.C.1    Carmon, T.F.2
  • 10
    • 0023978351 scopus 로고
    • Dynamic scheduling and routeing for flexible manufacturing systems that have unreliable machines
    • Maimon, O. Z., and Gershwin, S. B., 1988, Dynamic scheduling and routeing for flexible manufacturing systems that have unreliable machines. Operations Research, 36,279-292.
    • (1988) Operations Research , vol.36 , pp. 279-292
    • Maimon, O.Z.1    Gershwin, S.B.2
  • 11
    • 0000172494 scopus 로고
    • Algorithms for scheduling multi-level just-in-time production systems
    • Miltenburg, J., and Sinnamon, G., 1992, Algorithms for scheduling multi-level just-in-time production systems. IIE Transactions, 24, 121-130.
    • (1992) IIE Transactions , vol.24 , pp. 121-130
    • Miltenburg, J.1    Sinnamon, G.2
  • 12
    • 0024611210 scopus 로고
    • Stable, distributed, real time scheduling of flexible manufacturing/assembly/disassembly systems
    • Perkins, J. R., and Kumar, P. K., 1989, Stable, distributed, real time scheduling of flexible manufacturing/assembly/disassembly systems. IEEE Transactions on Automatic Control, 34, 139-148.
    • (1989) IEEE Transactions on Automatic Control , vol.34 , pp. 139-148
    • Perkins, J.R.1    Kumar, P.K.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.