메뉴 건너뛰기




Volumn 46, Issue 20, 2008, Pages 5781-5795

Capacitated production planning with outsourcing in an OKP company

Author keywords

Capacitated production planning; Dynamic programming; Inventory level; OKP; Outsourcing

Indexed keywords

CAPACITATED PRODUCTION PLANNING; DYNAMIC PROGRAMMING TECHNIQUES; FEASIBLE SOLUTIONS; GLOBAL OPTIMAL SOLUTIONS; INVENTORY LEVEL; MANUFACTURING PARADIGMS; OKP; ONE-OF-A-KIND PRODUCTIONS; OPTIMIZATION PROBLEMS; OUTSOURCING STRATEGIES; POLYNOMIAL-TIME; REAL-LIFE PROBLEMS; SMALL TO MEDIUM-SIZED ENTERPRISE; SUFFICIENT CONDITIONS; TIME-VARYING; TOTAL COSTS;

EID: 65249176906     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540701348779     Document Type: Article
Times cited : (16)

References (28)
  • 1
    • 0037449224 scopus 로고    scopus 로고
    • The single-item lot sizing production with immediate lost sales
    • Aksen, D., Altinkemer, K. and Chand, S., The single-item lot sizing production with immediate lost sales. Eur. J. Oper. Res., 2003, 147, 558-566.
    • (2003) Eur. J. Oper. Res , vol.147 , pp. 558-566
    • Aksen, D.1    Altinkemer, K.2    Chand, S.3
  • 2
    • 0018153235 scopus 로고
    • An algorithm for the dynamic lot-size problem with time-varying production capacity constraints
    • Baker, K.B., Dixon, P., Magazine, M.J. and Silver, E.A., An algorithm for the dynamic lot-size problem with time-varying production capacity constraints. Manage. Sci., 1978, 24, 1710-1720.
    • (1978) Manage. Sci , vol.24 , pp. 1710-1720
    • Baker, K.B.1    Dixon, P.2    Magazine, M.J.3    Silver, E.A.4
  • 3
    • 0020194024 scopus 로고
    • Computational complexity of the capacitated lot size problem
    • Bitran, G.R. and Yanasse, H.H., Computational complexity of the capacitated lot size problem. Manage. Sci., 1982, 28, 1174-1186.
    • (1982) Manage. Sci , vol.28 , pp. 1174-1186
    • Bitran, G.R.1    Yanasse, H.H.2
  • 4
    • 0007170549 scopus 로고    scopus 로고
    • The impact of corporate outsourcing on company value
    • Bryce, D.J. and Useem, M., The impact of corporate outsourcing on company value. Eur. Manage. J., 1998, 16, 635-643.
    • (1998) Eur. Manage. J , vol.16 , pp. 635-643
    • Bryce, D.J.1    Useem, M.2
  • 5
    • 0000635282 scopus 로고
    • A new dynamic programming algorithm for the single item capacitated dynamic lot size model
    • Chen, H.D. and Hean, C.Y.L., A new dynamic programming algorithm for the single item capacitated dynamic lot size model. J. Global Optim., 1994, 4, 285-300.
    • (1994) J. Global Optim , vol.4 , pp. 285-300
    • Chen, H.D.1    Hean, C.Y.L.2
  • 6
    • 0001537142 scopus 로고
    • An O(T) Algorithm for the NI/G/NI/ND capacitated lot size problem
    • Chung, C. and Lin, C.M., An O(T) Algorithm for the NI/G/NI/ND capacitated lot size problem. Manage. Sci., 1988, 21, 420-426.
    • (1988) Manage. Sci , vol.21 , pp. 420-426
    • Chung, C.1    Lin, C.M.2
  • 7
    • 0002144134 scopus 로고
    • Deterministic production planning with concave costs and capacity constraints
    • Florian, M. and Klein, M., Deterministic production planning with concave costs and capacity constraints. Manage. Sci., 1971, 18, 12-20.
    • (1971) Manage. Sci , vol.18 , pp. 12-20
    • Florian, M.1    Klein, M.2
  • 8
    • 0019032810 scopus 로고
    • Deterministic production planning: Algorithm and complexity
    • Florian, M., Lenstra, J.K. and Rinnooy Kan, A.H.G., Deterministic production planning: algorithm and complexity. Manage. Sci., 1980, 26, 669-679.
    • (1980) Manage. Sci , vol.26 , pp. 669-679
    • Florian, M.1    Lenstra, J.K.2    Rinnooy Kan, A.H.G.3
  • 9
    • 0038323266 scopus 로고    scopus 로고
    • A new characterization for the dynamic lot size problem with bounded inventory
    • Gutierrez, J., Sedeno-Noda, A., Colebrook, M. and Sicilia, J., A new characterization for the dynamic lot size problem with bounded inventory. Comput. Oper. Res., 2002, 30, 383-395.
    • (2002) Comput. Oper. Res , vol.30 , pp. 383-395
    • Gutierrez, J.1    Sedeno-Noda, A.2    Colebrook, M.3    Sicilia, J.4
  • 11
    • 0015650485 scopus 로고    scopus 로고
    • A class of deterministic planning problems
    • Jagannathan, R. and Rao, M. R., A class of deterministic planning problems. Manage. Sci., 19, 1295-1300.
    • Manage. Sci , vol.19 , pp. 1295-1300
    • Jagannathan, R.1    Rao, M.R.2
  • 12
    • 4444383252 scopus 로고    scopus 로고
    • Outsourcing capacity planning for an IC design house
    • Lee, C.-E. and Hsu, S.-C., Outsourcing capacity planning for an IC design house. Int. J. Adv. Manuf. Tech., 2004, 24, 306-320.
    • (2004) Int. J. Adv. Manuf. Tech , vol.24 , pp. 306-320
    • Lee, C.-E.1    Hsu, S.-C.2
  • 16
    • 0001705761 scopus 로고
    • Bounded production and inventory models with piecewise concave costs
    • Love, S.F., Bounded production and inventory models with piecewise concave costs. Manage. Sci., 1973, 20, 313-318.
    • (1973) Manage. Sci , vol.20 , pp. 313-318
    • Love, S.F.1
  • 17
    • 0142198097 scopus 로고
    • Taking an objective look at outsourcing
    • Rochester, J. and Douglas, D., Taking an objective look at outsourcing. IS Analyzer, 1990, 28, 1-16.
    • (1990) IS Analyzer , vol.28 , pp. 1-16
    • Rochester, J.1    Douglas, D.2
  • 18
    • 65249106986 scopus 로고    scopus 로고
    • Rochester, J. and Douglas, D., New wrinkles in IS outsourcing. IS Analyzer, 1993, 31, 1-18. Rolstada s, A., ESPPIT basic research action No. 3143 - FOF production theory. Comput. Ind., 1991, 16, 129-139.
    • Rochester, J. and Douglas, D., New wrinkles in IS outsourcing. IS Analyzer, 1993, 31, 1-18. Rolstada s, A., ESPPIT basic research action No. 3143 - FOF production theory. Comput. Ind., 1991, 16, 129-139.
  • 19
    • 0025432875 scopus 로고
    • A forward algorithm for the capacitated lot size model with stockouts
    • Sandbothe, R.A. and Thompson, G.L., A forward algorithm for the capacitated lot size model with stockouts. Oper. Res., 1990, 38, 474-486.
    • (1990) Oper. Res , vol.38 , pp. 474-486
    • Sandbothe, R.A.1    Thompson, G.L.2
  • 20
    • 0027605942 scopus 로고
    • Decision horizons for the capacitated lot size model with inventory bounds and stockouts
    • Sandbothe, R.A. and Thompson, G.L., Decision horizons for the capacitated lot size model with inventory bounds and stockouts. Comput. Oper. Res., 1993, 20, 455-465.
    • (1993) Comput. Oper. Res , vol.20 , pp. 455-465
    • Sandbothe, R.A.1    Thompson, G.L.2
  • 21
    • 0016509152 scopus 로고
    • Deterministic multi-period production planning model with piecewise concave production and holding-backorder costs
    • Swoveland, C.A., Deterministic multi-period production planning model with piecewise concave production and holding-backorder costs. Manage. Sci., 1975, 21, 1007-1013.
    • (1975) Manage. Sci , vol.21 , pp. 1007-1013
    • Swoveland, C.A.1
  • 22
    • 65249092917 scopus 로고    scopus 로고
    • Tsai, W.-H. and Lai, C.-W., Outsourcing or capacity expansions: application of activity-based costing model on joint products decisions. Computers & Operations Research, 2006. [In press but available online at www.sciencedirect.com (accessed March 2006)].
    • Tsai, W.-H. and Lai, C.-W., Outsourcing or capacity expansions: application of activity-based costing model on joint products decisions. Computers & Operations Research, 2006. [In press but available online at www.sciencedirect.com (accessed March 2006)].
  • 23
    • 0031365006 scopus 로고    scopus 로고
    • Production planning and control in a virtual OKP company
    • Tu, Y.L., Production planning and control in a virtual OKP company. Comput. Ind., 1997, 34, 271-283.
    • (1997) Comput. Ind , vol.34 , pp. 271-283
    • Tu, Y.L.1
  • 24
    • 0033875844 scopus 로고    scopus 로고
    • Computer-aided process planning in virtual one-of-a-kind production
    • Tu, Y., Chu, X. and Yang, W., Computer-aided process planning in virtual one-of-a-kind production. Comput. Ind., 2000, 41, 99-110.
    • (2000) Comput. Ind , vol.41 , pp. 99-110
    • Tu, Y.1    Chu, X.2    Yang, W.3
  • 25
    • 0001491020 scopus 로고    scopus 로고
    • An O(T3) algorithm for the economic lot-sizing problem with constant capacities
    • Van Hoesel, C.P.M. and Wagelmans, A.P.M., An O(T3) algorithm for the economic lot-sizing problem with constant capacities. Manage. Sci., 1996, 42, 142-150.
    • (1996) Manage. Sci , vol.42 , pp. 142-150
    • Van Hoesel, C.P.M.1    Wagelmans, A.P.M.2
  • 26
    • 0001962762 scopus 로고
    • Dynamic version of the economic lot size model
    • Wagner, H.M. and Whitin, T., Dynamic version of the economic lot size model. Manage. Sci., 1958, 5, 89-96.
    • (1958) Manage. Sci , vol.5 , pp. 89-96
    • Wagner, H.M.1    Whitin, T.2
  • 28
    • 18744383359 scopus 로고    scopus 로고
    • A production-inventory system with markovian capacity and outsourcing option
    • Yang, J., Qi, X. and Xia, Y., A production-inventory system with markovian capacity and outsourcing option. Oper. Res., 2005, 53, 328-349.
    • (2005) Oper. Res , vol.53 , pp. 328-349
    • Yang, J.1    Qi, X.2    Xia, Y.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.