메뉴 건너뛰기




Volumn 40, Issue 18, 2002, Pages 4815-4834

Capacity estimation of a multi-product unreliable production line

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER WORKSTATIONS; COSTS; MARKOV PROCESSES; PERFORMANCE;

EID: 0037115842     PISSN: 00207543     EISSN: None     Source Type: Journal    
DOI: 10.1080/0020754021000024148     Document Type: Article
Times cited : (31)

References (30)
  • 2
    • 0030784108 scopus 로고    scopus 로고
    • Control policies for multi-product, multi-stage manufacturing systems: An experimental approach
    • AMIN, M. and ALTIOK, T., 1997, Control policies for multi-product, multi-stage manufacturing systems: an experimental approach. International Journal of Production Research, 35(1), 201-223.
    • (1997) International Journal of Production Research , vol.35 , Issue.1 , pp. 201-223
    • Amin, M.1    Altiok, T.2
  • 3
    • 0032276811 scopus 로고    scopus 로고
    • A review of simulation optimization techniques
    • D. J. Medeiros, E. F. Watson, J. S. Carson and M. S. Manivannan (eds)
    • ANDRADOTTIR, S., 1998, A review of simulation optimization techniques. In D. J. Medeiros, E. F. Watson, J. S. Carson and M. S. Manivannan (eds), Proceedings of the 1998 Simulation Conference, pp. 151-158.
    • (1998) Proceedings of the 1998 Simulation Conference , pp. 151-158
    • Andradottir, S.1
  • 7
    • 0042444340 scopus 로고
    • Methods of reliability analysis of production systems subject to breakdowns
    • D. Grouchko (ed.), Turin, Italy, 24 June-4 July (New York: Gordon & Breach)
    • BUZACOTT J. A., 1969, Methods of reliability analysis of production systems subject to breakdowns. In D. Grouchko (ed.), Operations Research Proceedings of a NATO Conference, Turin, Italy, 24 June-4 July (New York: Gordon & Breach).
    • (1969) Operations Research Proceedings of a NATO Conference
    • Buzacott, J.A.1
  • 10
    • 0023399062 scopus 로고
    • Buffer capacity analysis for sequential production lines with variable process times
    • CHOW, W., 1987, Buffer capacity analysis for sequential production lines with variable process times. International Journal of Production Research, 8, 1183-1196.
    • (1987) International Journal of Production Research , vol.8 , pp. 1183-1196
    • Chow, W.1
  • 11
    • 0023981046 scopus 로고
    • The role of work-in-process inventories in serial production lines
    • CONWAY, R. W., MAXWELL, W. L., MCCLAIN, J. O. and THOMAS, L. J., 1988, The role of work-in-process inventories in serial production lines. Operations Research, 36, 229-241.
    • (1988) Operations Research , vol.36 , pp. 229-241
    • Conway, R.W.1    Maxwell, W.L.2    McClain, J.O.3    Thomas, L.J.4
  • 12
    • 34249834508 scopus 로고
    • Manufacturing lines systems: A review of models and analytical results
    • DALLERY, Y. and GERSHWIN, S., 1992, Manufacturing lines systems: a review of models and analytical results. Queueing Systems, 12, 3-94.
    • (1992) Queueing Systems , vol.12 , pp. 3-94
    • Dallery, Y.1    Gershwin, S.2
  • 13
    • 0001337659 scopus 로고
    • The effects of breakdowns and interstage storage on production line capacity
    • FREEMAN, M. C., 1964, The effects of breakdowns and interstage storage on production line capacity. Journal of Industrial Engineering, 15, 194-200.
    • (1964) Journal of Industrial Engineering , vol.15 , pp. 194-200
    • Freeman, M.C.1
  • 15
    • 0023315347 scopus 로고
    • An efficient decomposition algorithm for the approximate evaluation of tandem queues with finite storage space and blocking
    • GERSHWIN, S. B., 1987, An efficient decomposition algorithm for the approximate evaluation of tandem queues with finite storage space and blocking. Operations Research, 35, 291-305.
    • (1987) Operations Research , vol.35 , pp. 291-305
    • Gershwin, S.B.1
  • 16
    • 0001012830 scopus 로고
    • The effect of the coefficient of variation of operation times on the allocation of storage space in production line systems
    • HILLIER, F. and SO, K. C., 1991a, The effect of the coefficient of variation of operation times on the allocation of storage space in production line systems, IIE Transactions, 23, 198-206.
    • (1991) IIE Transactions , vol.23 , pp. 198-206
    • Hillier, F.1    So, K.C.2
  • 17
    • 0026239015 scopus 로고
    • The effect of machine breakdowns and interstage storage on the performance of production line systems
    • HILLIER, F. and SO, K. C., 1991b, The effect of machine breakdowns and interstage storage on the performance of production line systems. International Journal of Production Research, 29, 2043-2055.
    • (1991) International Journal of Production Research , vol.29 , pp. 2043-2055
    • Hillier, F.1    So, K.C.2
  • 18
    • 0018544640 scopus 로고
    • A gradient technique for general buffer storage design in a production line
    • HO, Y. C., EYLER, M. A. and CHIEN, T. T., 1979, A gradient technique for general buffer storage design in a production line. International Journal of Production Research, 17, 557-580.
    • (1979) International Journal of Production Research , vol.17 , pp. 557-580
    • Ho, Y.C.1    Eyler, M.A.2    Chien, T.T.3
  • 19
    • 0030709089 scopus 로고    scopus 로고
    • Virtual manufacturing systems as advanced information infrastructure for integration manufacturing resources and activities
    • IWATA, K., ONOSATO, M., TERAMOTO, K. and OSAKI, S., 1997, Virtual manufacturing systems as advanced information infrastructure for integration manufacturing resources and activities. Annals of the CIRP, 46, 335-338.
    • (1997) Annals of the CIRP , vol.46 , pp. 335-338
    • Iwata, K.1    Onosato, M.2    Teramoto, K.3    Osaki, S.4
  • 20
    • 0024683335 scopus 로고
    • Determination of optimal buffer storage capacities and optimal allocation in multistage automatic transfer lines
    • JAFARI, M. A. and SHANTHIKUMAR, J. G., 1989, Determination of optimal buffer storage capacities and optimal allocation in multistage automatic transfer lines, IIE Transactions, 21(2), 130-135.
    • (1989) IIE Transactions , vol.21 , Issue.2 , pp. 130-135
    • Jafari, M.A.1    Shanthikumar, J.G.2
  • 21
    • 0023362311 scopus 로고
    • A linear programming approach to capacity estimation of automated production lines with finite buffers
    • JOHRI, P. K., 1987, A linear programming approach to capacity estimation of automated production lines with finite buffers, International Journal of Production Research, 25(6), 851-866.
    • (1987) International Journal of Production Research , vol.25 , Issue.6 , pp. 851-866
    • Johri, P.K.1
  • 22
    • 0035360242 scopus 로고    scopus 로고
    • A virtual factory based approach to on-line simulation and scheduling for an FMS and a case study
    • LIN, M.-H. and FU, L.-C., 2001, A virtual factory based approach to on-line simulation and scheduling for an FMS and a case study. Journal of Intelligent Manufacturing, 12, 269-279.
    • (2001) Journal of Intelligent Manufacturing , vol.12 , pp. 269-279
    • Lin, M.-H.1    Fu, L.-C.2
  • 23
    • 0032049359 scopus 로고    scopus 로고
    • Determining buffer location and size in production lines using tabu search
    • LUTZ, C. M., DAVIS, K. R. and SUN, M., 1998, Determining buffer location and size in production lines using tabu search. European Journal of Operational Research, 106, 301-306.
    • (1998) European Journal of Operational Research , vol.106 , pp. 301-306
    • Lutz, C.M.1    Davis, K.R.2    Sun, M.3
  • 25
    • 0012598250 scopus 로고    scopus 로고
    • The impact of preventive maintenance on system cost and buffer size
    • MELLER, R. D. and KIM, D. S., 1996, The impact of preventive maintenance on system cost and buffer size. European Journal of Operational Research, 95, 577-591.
    • (1996) European Journal of Operational Research , vol.95 , pp. 577-591
    • Meller, R.D.1    Kim, D.S.2
  • 27
    • 0035400771 scopus 로고    scopus 로고
    • Modeling and analysis of an unreliable flow line composed of parallel-machine stages
    • PATCHONG, A. and WILLAEYS, D., 2001, Modeling and analysis of an unreliable flow line composed of parallel-machine stages, IIE Transactions, 33, 559-568.
    • (2001) IIE Transactions , vol.33 , pp. 559-568
    • Patchong, A.1    Willaeys, D.2
  • 28
    • 0029735339 scopus 로고    scopus 로고
    • Allocation of buffers to serial production lines with bottlenecks
    • POWELL, S. G. and PYKE, D. F., 1996, Allocation of buffers to serial production lines with bottlenecks, IIE Transactions, 28, 18-29.
    • (1996) IIE Transactions , vol.28 , pp. 18-29
    • Powell, S.G.1    Pyke, D.F.2
  • 30
    • 0035311479 scopus 로고    scopus 로고
    • Performance evaluation of unbalanced flow lines with general distributed processing times, failures and imperfect production
    • TEMPELMEIER, H. and BÜRGER, M., 2001, Performance evaluation of unbalanced flow lines with general distributed processing times, failures and imperfect production, IIE Transactions, 33, 293-302.
    • (2001) IIE Transactions , vol.33 , pp. 293-302
    • Tempelmeier, H.1    Bürger, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.