-
3
-
-
0030189573
-
Optimal allocation of inspection effort in a serial multi-stage production system
-
DOI 10.1016/0360-8352(96)00008-3
-
D.S. Bai, and H.J. Yun Optimal allocation of inspection effort in a serial multi-stage production system Computers & Industrial Engineering 30 3 1996 387 396 (Pubitemid 126393346)
-
(1996)
Computers and Industrial Engineering
, vol.30
, Issue.3 SPEC. ISS.
, pp. 387-396
-
-
Bai, D.S.1
Yun, H.J.2
-
6
-
-
82755172574
-
Increasing production rate in Kanban controlled assembly lines through preventive maintenance
-
in press
-
Chen, R.; & Subramaniam, V. (2011). Increasing production rate in Kanban controlled assembly lines through preventive maintenance. International Journal of Production Research, in press.
-
(2011)
International Journal of Production Research
-
-
Chen, R.1
Subramaniam, V.2
-
8
-
-
67651163456
-
Performance evaluation of production systems monitored by statistical process control and off-line inspections
-
M. Colledani, and T. Tolio Performance evaluation of production systems monitored by statistical process control and off-line inspections International Journal of Production Economics 120 2 2009 348 367
-
(2009)
International Journal of Production Economics
, vol.120
, Issue.2
, pp. 348-367
-
-
Colledani, M.1
Tolio, T.2
-
9
-
-
34249834508
-
Manufacturing flow line systems: A review of models and analytical results
-
Y. Dallery, and S.B. Gershwin Manufacturing flow line systems: A review of models and analytical results Queueing Systems 12 1992 3 94
-
(1992)
Queueing Systems
, vol.12
, pp. 3-94
-
-
Dallery, Y.1
Gershwin, S.B.2
-
12
-
-
73549100873
-
Manufacturing costs in serial production systems with rework
-
G.C. Hadjinicola Manufacturing costs in serial production systems with rework Journal of the Operational Research Society 61 2 2010 342 351
-
(2010)
Journal of the Operational Research Society
, vol.61
, Issue.2
, pp. 342-351
-
-
Hadjinicola, G.C.1
-
14
-
-
33746836791
-
Exact analysis of a continuous material merge system with limited buffer capacity and three stations
-
International series in operations research management science (Vol. 60) Kluwer Academic Boston, MA
-
S. Helber, and N. Mehrtens Exact analysis of a continuous material merge system with limited buffer capacity and three stations Analysis and modeling of manufacturing systems International series in operations research management science (Vol. 60) 2003 Kluwer Academic Boston, MA
-
(2003)
Analysis and Modeling of Manufacturing Systems
-
-
Helber, S.1
Mehrtens, N.2
-
15
-
-
4043121812
-
A new decomposition approach for non-cyclic continuous material flow lines with a merging flow of material
-
S. Helber, and H. Jusic A new decomposition approach for non-cyclic continuous material flow lines with a merging flow of material Annals of Operations Research 125 2004 117 139 (Pubitemid 39063654)
-
(2004)
Annals of Operations Research
, vol.125
, Issue.1-4
, pp. 117-139
-
-
Helber, S.1
Jusic, H.2
-
16
-
-
82755172575
-
-
Interfaceusa
-
Interfaceusa (2010). Technology Transfer PTCA. < http://www. interfaceusa.com/equipment/technology-transfer/ptca-production-line-equipment/ >.
-
(2010)
Technology Transfer PTCA
-
-
-
19
-
-
34250176186
-
A study on the quality-productivity relationship and its verification in manufacturing industries
-
DOI 10.1080/00137910701328888, PII 779371137
-
W. Lee, M.G. Beruvides, and Y.D. Chiu A study on the quality-productivity relationship and its verification in manufacturing industries Engineering Economist 52 2 2007 117 139 (Pubitemid 46904510)
-
(2007)
Engineering Economist
, vol.52
, Issue.2
, pp. 117-139
-
-
Lee, W.-R.1
Beruvides, M.G.2
Chiu, Y.D.3
-
20
-
-
3242682462
-
Performance analysis of production systems with rework loops
-
J. Li Performance analysis of production systems with rework loops IIE Transactions 36 8 2004 755 765
-
(2004)
IIE Transactions
, vol.36
, Issue.8
, pp. 755-765
-
-
Li, J.1
-
23
-
-
60549085550
-
An optimal operating policy for the production system with rework
-
N. Liu, Y. Kim, and H. Hwang An optimal operating policy for the production system with rework Computers & Industrial Engineering 56 3 2009 874 887
-
(2009)
Computers & Industrial Engineering
, vol.56
, Issue.3
, pp. 874-887
-
-
Liu, N.1
Kim, Y.2
Hwang, H.3
-
24
-
-
0042091890
-
Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs
-
DOI 10.1016/0377-2217(94)00339-4
-
J.J. Liu, and P. Yang Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs European Journal of Operational Research 91 3 1996 517 527 (Pubitemid 126393163)
-
(1996)
European Journal of Operational Research
, vol.91
, Issue.3
, pp. 517-527
-
-
Liu, J.J.1
Yang, P.2
-
26
-
-
77953636017
-
Product quality inspection in Bernoulli lines: Analysis, bottlenecks, and design
-
S.M. Meerkov, and L. Zhang Product quality inspection in Bernoulli lines: Analysis, bottlenecks, and design International Journal of Production Research 48 16 2010 4745 4766
-
(2010)
International Journal of Production Research
, vol.48
, Issue.16
, pp. 4745-4766
-
-
Meerkov, S.M.1
Zhang, L.2
-
27
-
-
34047198697
-
Optimizing the quality control station configuration
-
DOI 10.1002/nav.20206
-
M. Penn, and T. Raviv Optimizing the quality control station configuration Naval Research Logistics 54 3 2007 301 314 (Pubitemid 46542990)
-
(2007)
Naval Research Logistics
, vol.54
, Issue.3
, pp. 301-314
-
-
Penn, M.1
Raviv, T.2
-
28
-
-
0030172194
-
An analytic formula for the mean throughput of K-station production lines with no intermediate buffers
-
DOI 10.1016/0377-2217(95)00113-1
-
H.T. Papadopoulos An analytic formula for the mean throughput of K-station production lines with no intermediate buffers European Journal of Operational Research 91 3 1996 481 494 (Pubitemid 126393160)
-
(1996)
European Journal of Operational Research
, vol.91
, Issue.3
, pp. 481-494
-
-
Papadopoulos, H.T.1
-
29
-
-
27844611316
-
Layer modelling for the inspection allocation problem in re-entrant production systems
-
DOI 10.1080/13629390500124515
-
H. Rau, Y.-H. Chu, and K.-H. Cho Layer modelling for the inspection allocation problem in re-entrant production systems International Journal of Production Research 43 17 2005 3633 3655 (Pubitemid 41648301)
-
(2005)
International Journal of Production Research
, vol.43
, Issue.17
, pp. 3633-3655
-
-
Rau, H.1
Chu, Y.-H.2
Cho, K.-H.3
-
30
-
-
34548565651
-
Optimal batch sizing in a multi-stage production system with rework consideration
-
DOI 10.1016/j.ejor.2006.12.005, PII S0377221706012033
-
B.R. Sarker, A.M.M. Jamal, and S. Mondal Optimal batch sizing in a multi-stage production system with rework consideration European Journal of Operational Research 184 3 2008 915 929 (Pubitemid 47391152)
-
(2008)
European Journal of Operational Research
, vol.184
, Issue.3
, pp. 915-929
-
-
Sarker, B.R.1
Jamal, A.M.M.2
Mondal, S.3
-
32
-
-
0035831088
-
A three-station merge system with unreliable stations and a shared buffer
-
DOI 10.1016/S0895-7177(00)00296-X, PII S089571770000296X
-
B. Tan A three station merge system with unreliable stations and a shared buffer Mathematical and Computer Modeling 33 2001 1011 1026 (Pubitemid 32258455)
-
(2001)
Mathematical and Computer Modelling
, vol.33
, Issue.8-9
, pp. 1011-1026
-
-
Tan, B.1
-
33
-
-
0020289463
-
Simulation of a production line system with machine breakdowns using network modeling
-
B.W. Taylor, E.R. Clayton, and E.T. Grasso Simulation of a production line system with machine breakdowns using network modeling Computers & Operations Research 9 4 1982 255 264
-
(1982)
Computers & Operations Research
, vol.9
, Issue.4
, pp. 255-264
-
-
Taylor, B.W.1
Clayton, E.R.2
Grasso, E.T.3
-
35
-
-
60749099388
-
Iterative use of simulation and scheduling methodologies to improve productivity
-
Vasudevan, K. K.; Lote, R.; Williams, E. J.; & Ugen, O. M. (2008). Iterative use of simulation and scheduling methodologies to improve productivity. Winter simulation conference (WSC), 1896-1903.
-
(2008)
Winter Simulation Conference (WSC)
, pp. 1896-1903
-
-
Vasudevan, K.K.1
Lote, R.2
Williams, E.J.3
Ugen, O.M.4
|