메뉴 건너뛰기




Volumn 43, Issue 17, 2005, Pages 3633-3655

Layer modelling for the inspection allocation problem in re-entrant production systems

Author keywords

Inspection allocation problem; Layered fabrication; Re entrant production system; Workstation of variables data

Indexed keywords

COMPUTER WORKSTATIONS; HEURISTIC METHODS; MATHEMATICAL MODELS; PROBLEM SOLVING; PUBLIC POLICY;

EID: 27844611316     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/13629390500124515     Document Type: Article
Times cited : (21)

References (13)
  • 1
    • 0031234624 scopus 로고    scopus 로고
    • Inspection for circuit board assembly
    • Chevalier, P.B. and Wein L.M., Inspection for circuit board assembly. Manag. Sci., 1997, 43, 198-1213.
    • (1997) Manag. Sci. , vol.43 , pp. 198-1213
    • Chevalier, P.B.1    Wein, L.M.2
  • 3
    • 0015681690 scopus 로고
    • Imperfect inspection in a in a multiworkstation production process
    • Hurst, E.G. Jr, Imperfect inspection in a in a multiworkstation production process. Manag. Sci., 1973, 20, 378-384.
    • (1973) Manag. Sci. , vol.20 , pp. 378-384
    • Hurst Jr., E.G.1
  • 4
    • 0031703397 scopus 로고    scopus 로고
    • Planning quality inspection operations in multiworkstation manufacturing systems with inspection errors
    • Lee, J. and Unnikrishnan, S., Planning quality inspection operations in multiworkstation manufacturing systems with inspection errors. Int. J. Prod. Res., 1998, 36, 141-155.
    • (1998) Int. J. Prod. Res. , vol.36 , pp. 141-155
    • Lee, J.1    Unnikrishnan, S.2
  • 5
    • 0000140746 scopus 로고
    • Allocation of screening inspection effort: Dynamic-programming approach
    • Lindsay, G.F. and Bishop, A.B., Allocation of screening inspection effort: dynamic-programming approach. Manag. Sci., 1964, 10, 343-352.
    • (1964) Manag. Sci. , vol.10 , pp. 343-352
    • Lindsay, G.F.1    Bishop, A.B.2
  • 6
    • 0001441631 scopus 로고    scopus 로고
    • Modeling reentrant manufacturing systems with inspection stations
    • Narahari, Y. and Khan, L.M., Modeling reentrant manufacturing systems with inspection stations. J. Manuf. Sys., 1996, 15, 367-378.
    • (1996) J. Manuf. Sys. , vol.15 , pp. 367-378
    • Narahari, Y.1    Khan, L.M.2
  • 7
    • 84985801795 scopus 로고
    • Location of quality inspection stations: An experimental assessment of five normative heuristics
    • Peters, M.H. and Williams, W.W., Location of quality inspection stations: an experimental assessment of five normative heuristics. Dec. Sci., 1984, 15, 389-408.
    • (1984) Dec. Sci. , vol.15 , pp. 389-408
    • Peters, M.H.1    Williams, W.W.2
  • 8
    • 18144400643 scopus 로고    scopus 로고
    • Inspection allocation planning with two types of workstations: WVD and WAD
    • Rau, H. and Chu, Y.H., Inspection allocation planning with two types of workstations: WVD and WAD. Int. J. Adv. Manuf. Tech., 2005, 25, 947-953.
    • (2005) Int. J. Adv. Manuf. Tech. , vol.25 , pp. 947-953
    • Rau, H.1    Chu, Y.H.2
  • 9
    • 0037141481 scopus 로고    scopus 로고
    • Inspection resource assignment in a multistage manufacturing system with an inspection error model
    • Shiau, Y.R., Inspection resource assignment in a multistage manufacturing system with an inspection error model. Int. J. Prod. Res., 2002, 40, 1787-1806.
    • (2002) Int. J. Prod. Res. , vol.40 , pp. 1787-1806
    • Shiau, Y.R.1
  • 10
    • 0010945943 scopus 로고
    • The analysis of a simple class of multistage inspection plans
    • White, L.S., The analysis of a simple class of multistage inspection plans. Manag. Sci., 1966, 12, 685-693.
    • (1966) Manag. Sci. , vol.12 , pp. 685-693
    • White, L.S.1
  • 11
    • 0010820352 scopus 로고
    • Shortest route models for the allocation of inspection effort on a production line
    • White, L.S., Shortest route models for the allocation of inspection effort on a production line. Manag. Sci., 1969, 15, 249-259.
    • (1969) Manag. Sci. , vol.15 , pp. 249-259
    • White, L.S.1
  • 12
    • 0023435379 scopus 로고
    • Optimal inspection policies in a serial production system including scrap rework and repair: An MILP approach
    • Yum, B.J. and McDowell, E.D., Optimal inspection policies in a serial production system including scrap rework and repair: an MILP approach. Int. J. Prod. Res., 1987, 25, 1451-1464.
    • (1987) Int. J. Prod. Res. , vol.25 , pp. 1451-1464
    • Yum, B.J.1    McDowell, E.D.2
  • 13
    • 0343777313 scopus 로고    scopus 로고
    • Cope with inspection allocation in re-entrant lines by simulated annealing
    • Zhao, L.N. and Zheng, Y.P., Cope with inspection allocation in re-entrant lines by simulated annealing. Chin. J. Mech. Eng., 2000, 36, 56-59.
    • (2000) Chin. J. Mech. Eng. , vol.36 , pp. 56-59
    • Zhao, L.N.1    Zheng, Y.P.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.