Volumn 131, Issue 12, 2005, Pages 1249-1256

Improved measured mile analysis technique

Author keywords

Claims; Construction management; Productivity; Project management; Statistics

Indexed keywords

CLAIMS; CONSTRUCTION MANAGEMENT;

EID: 29044440796     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2005)131:12(1249)     Document Type: Review
Times cited : (34)

References (26)
  • 2
    • 0022025262 scopus 로고
    • Construction claims: Frequency and severity
    • Diekmann, J. E., and Nelson, M. C. (1985). "Construction claims: Frequency and severity." J. Constr. Eng. Manage., 111(1), 74-81.
    • (1985) J. Constr. Eng. Manage. , vol.111 , Issue.1 , pp. 74-81
    • Diekmann, J.E.1    Nelson, M.C.2
  • 4
    • 0032656251 scopus 로고    scopus 로고
    • Impact of change orders on labor efficiency for mechanical construction
    • Hanna, A. S., Russell, J. S., Gotzion, T. W., and Nordheim, E. V. (1999a). "Impact of change orders on labor efficiency for mechanical construction." J. Constr. Eng. Manage., 125(3), 176-184.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.3 , pp. 176-184
    • Hanna, A.S.1    Russell, J.S.2    Gotzion, T.W.3    Nordheim, E.V.4
  • 5
    • 0032659199 scopus 로고    scopus 로고
    • Impact of change orders on labor efficiency for electrical construction
    • Hanna, A. S., Russell, J. S., Nordheim, E. V., and Bruggink, M. J. (1999b). "Impact of change orders on labor efficiency for electrical construction." J. Constr. Eng. Manage., 125(4), 224-232.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.4 , pp. 224-232
    • Hanna, A.S.1    Russell, J.S.2    Nordheim, E.V.3    Bruggink, M.J.4
  • 6
    • 27744462915 scopus 로고
    • Construction changes and change orders
    • Construction Industry Institute, Univ. of Texas, Tex.
    • Hester, W. T., Kuprenas, J., and Chang, T. C. (1991). "Construction changes and change orders." Source Document 66, Construction Industry Institute, Univ. of Texas, Tex.
    • (1991) Source Document , vol.66
    • Hester, W.T.1    Kuprenas, J.2    Chang, T.C.3
  • 7
    • 0004652780 scopus 로고    scopus 로고
    • Quantitative impacts of project change: Size issues
    • Ibbs, C. W. (1997). "Quantitative impacts of project change: Size issues." J. Constr. Eng. Manage., 123(3), 308-311.
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.3 , pp. 308-311
    • Ibbs, C.W.1
  • 8
    • 11344268966 scopus 로고
    • Quantitative impacts of project change
    • Construction Industry Institute, Univ. of Texas, Tex.
    • Ibbs, C. W., and Allen, W. E. (1995). "Quantitative impacts of project change." Source Document 108, Construction Industry Institute, Univ. of Texas, Tex.
    • (1995) Source Document , vol.108
    • Ibbs, C.W.1    Allen, W.E.2
  • 9
    • 13944260870 scopus 로고    scopus 로고
    • Project delivery systems and project change: Quantitative analysis
    • Ibbs, C. W., Kwak, Y. H., Ng, T., and Odabasi, M. (2003). "Project delivery systems and project change: Quantitative analysis." J. Constr. Eng. Manage., 129(4), 382-387.
    • (2003) J. Constr. Eng. Manage. , vol.129 , Issue.4 , pp. 382-387
    • Ibbs, C.W.1    Kwak, Y.H.2    Ng, T.3    Odabasi, M.4
  • 10
    • 0004706464 scopus 로고    scopus 로고
    • Fast-tracking's impact on project change
    • Ibbs, C. W., Lee, S., and Li, M. (1998). "Fast-tracking's impact on project change." Proj. Manage. J., 29(4), 25-31.
    • (1998) Proj. Manage. J. , vol.29 , Issue.4 , pp. 25-31
    • Ibbs, C.W.1    Lee, S.2    Li, M.3
  • 12
    • 29044446463 scopus 로고    scopus 로고
    • Getting the most out of your 'measured mile' approach
    • Loulakis, M. C., and Santiago, S. J. (1999). "Getting the most out of your 'measured mile' approach." Civ. Eng. (N.Y.), 69(11), 69.
    • (1999) Civ. Eng. (N.Y.) , vol.69 , Issue.11 , pp. 69
    • Loulakis, M.C.1    Santiago, S.J.2
  • 13
    • 0242393630 scopus 로고
    • Rockville, Md.
    • Mechanical Contractors Association of America (MCAA). (1986). Labor estimating manual, Rockville, Md.
    • (1986) Labor Estimating Manual
  • 14
    • 27744462165 scopus 로고
    • Bethesda, Md.
    • National Electrical Contractors Association (NECA). (1976). Manual of labor units, Bethesda, Md.
    • (1976) Manual of Labor Units
  • 16
    • 0028754078 scopus 로고
    • Construction claims and disputes: Causes and cost/time overruns
    • Sample, C., Hartman, F. T., and Jergeas, G. (1994). "Construction claims and disputes: Causes and cost/time overruns." J. Constr. Eng. Manage., 120(4), 785-795.
    • (1994) J. Constr. Eng. Manage. , vol.120 , Issue.4 , pp. 785-795
    • Sample, C.1    Hartman, F.T.2    Jergeas, G.3
  • 17
    • 13944264322 scopus 로고    scopus 로고
    • Reducing variability to improve performance as a lean construction principle
    • Thomas, H. R., Horman, M. J., de Souza, U. E. L., and Zavrski, I. (2002). "Reducing variability to improve performance as a lean construction principle." J. Constr. Eng. Manage., 128(2), 144-154.
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.2 , pp. 144-154
    • Thomas, H.R.1    Horman, M.J.2    De Souza, U.E.L.3    Zavrski, I.4
  • 18
    • 12344327099 scopus 로고    scopus 로고
    • Improving labor flow reliability for better productivity as lean construction principle
    • Thomas, H. R., Horman, M. J., Minchin, R. E., and Chen, D. (2003a). "Improving labor flow reliability for better productivity as lean construction principle." J. Constr. Eng. Manage., 129(3), 251-261.
    • (2003) J. Constr. Eng. Manage. , vol.129 , Issue.3 , pp. 251-261
    • Thomas, H.R.1    Horman, M.J.2    Minchin, R.E.3    Chen, D.4
  • 19
    • 13944281185 scopus 로고    scopus 로고
    • Role of work-force management in bridge superstructure labor productivity
    • Thomas, H. R., Minchin, R. E., and Chen, D. (2003b). "Role of work-force management in bridge superstructure labor productivity." J. Manage. Eng., 19(1), 9-16.
    • (2003) J. Manage. Eng. , vol.19 , Issue.1 , pp. 9-16
    • Thomas, H.R.1    Minchin, R.E.2    Chen, D.3
  • 20
    • 0032673945 scopus 로고    scopus 로고
    • Loss of labor productivity due to delivery methods and weather
    • Thomas, H. R., Riley, D. R., and Sanvido, V. E. (1999). "Loss of labor productivity due to delivery methods and weather." J. Constr. Eng. Manage., 125(1), 39-46.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.1 , pp. 39-46
    • Thomas, H.R.1    Riley, D.R.2    Sanvido, V.E.3
  • 21
    • 14744282331 scopus 로고    scopus 로고
    • Quantification of losses caused by labor inefficiencies: Where is the elusive measured mile?
    • Thomas, H. R., and Sanvido, V. E. (2000a). "Quantification of losses caused by labor inefficiencies: Where is the elusive measured mile?" Constr. Law Bus., 1(3), 1-14.
    • (2000) Constr. Law Bus. , vol.1 , Issue.3 , pp. 1-14
    • Thomas, H.R.1    Sanvido, V.E.2
  • 22
    • 0034271740 scopus 로고    scopus 로고
    • Role of the fabricator in labor productivity
    • Thomas, H. R., and Sanvido, V. E. (2000b). "Role of the fabricator in labor productivity." J. Constr. Eng. Manage., 126(5), 358-365.
    • (2000) J. Constr. Eng. Manage. , vol.126 , Issue.5 , pp. 358-365
    • Thomas, H.R.1    Sanvido, V.E.2
  • 23
    • 0344240116 scopus 로고    scopus 로고
    • Construction baseline productivity: Theory and practice
    • Thomas, H. R., and Zavrski, I. (1999). "Construction baseline productivity: Theory and practice." J. Constr. Eng. Manage., 125(5), 295-303.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.5 , pp. 295-303
    • Thomas, H.R.1    Zavrski, I.2
  • 24
    • 29044440374 scopus 로고
    • Modification impact evaluation guide
    • Office of the Chief of Engineers, Washington, D.C.
    • U.S. Army Corps of Engineers (UACE). (1979). "Modification impact evaluation guide." EP 415-1_3, Office of the Chief of Engineers, Washington, D.C.
    • (1979) EP 415-1_3
  • 25
    • 0022702177 scopus 로고
    • The measured mile: Proving construction inefficiency costs
    • Zink, D. A. (1986). "The measured mile: Proving construction inefficiency costs." Cost Eng., 28(4), 19-21.
    • (1986) Cost Eng. , vol.28 , Issue.4 , pp. 19-21
    • Zink, D.A.1
  • 26
    • 0025521947 scopus 로고
    • Impacts and construction inefficiency
    • Zink, D. A. (1990). "Impacts and construction inefficiency." Cost Eng., 32(11), 21-23.
    • (1990) Cost Eng. , vol.32 , Issue.11 , pp. 21-23
    • Zink, D.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.