메뉴 건너뛰기




Volumn 31, Issue 12, 2007, Pages 1671-1693

Novel continuous-time formulations for scheduling multi-stage batch plants with identical parallel units

Author keywords

Batch plant; Makespan; Mathematical programming; MILP; Multi product; Multi stage; Scheduling

Indexed keywords

APPROXIMATION THEORY; CHEMICAL PLANTS; HEURISTIC ALGORITHMS; MATHEMATICAL PROGRAMMING; SCHEDULING;

EID: 34548483161     PISSN: 00981354     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.compchemeng.2007.02.001     Document Type: Article
Times cited : (21)

References (38)
  • 3
    • 0032093568 scopus 로고    scopus 로고
    • Scheduling of a multi-product batch process in the chemical industry
    • Blömer F., and Günther H.O. Scheduling of a multi-product batch process in the chemical industry. Computers in Industry 36 (1998) 245-259
    • (1998) Computers in Industry , vol.36 , pp. 245-259
    • Blömer, F.1    Günther, H.O.2
  • 5
    • 0027906590 scopus 로고
    • Worse-case analysis of heuristics for open shops with parallel machines
    • Chen B., and Strusevich V.A. Worse-case analysis of heuristics for open shops with parallel machines. European Journal of Operational Research 70 (1993) 379-390
    • (1993) European Journal of Operational Research , vol.70 , pp. 379-390
    • Chen, B.1    Strusevich, V.A.2
  • 6
    • 0025571942 scopus 로고
    • Scheduling of serial multi-product batch processes via simulated annealing
    • Das H., Cummings P.T., and LeVan M.D. Scheduling of serial multi-product batch processes via simulated annealing. Computers and Chemical Engineering 14 (1990) 1351-1362
    • (1990) Computers and Chemical Engineering , vol.14 , pp. 1351-1362
    • Das, H.1    Cummings, P.T.2    LeVan, M.D.3
  • 8
    • 34548500375 scopus 로고    scopus 로고
    • Espinoza, D. G. (2006). On linear programming, integer programming, and cutting planes. PhD thesis. School of Industrial and System Engineering, Georgia Institute of Technology.
  • 9
    • 0002703574 scopus 로고
    • Tabu search: A tutorial
    • Glover F. Tabu search: A tutorial. Interfaces 20 (1990) 74
    • (1990) Interfaces , vol.20 , pp. 74
    • Glover, F.1
  • 11
    • 0037419775 scopus 로고    scopus 로고
    • Scheduling a 2-stage multiproduct process with limited product shelf life in intermediate storage
    • Gupta S., and Karimi I.A. Scheduling a 2-stage multiproduct process with limited product shelf life in intermediate storage. Industrial and Engineering Chemistry Research 42 3 (2003) 490-508
    • (2003) Industrial and Engineering Chemistry Research , vol.42 , Issue.3 , pp. 490-508
    • Gupta, S.1    Karimi, I.A.2
  • 12
    • 0037503184 scopus 로고    scopus 로고
    • An improved MILP formulation for scheduling multiproduct, multistage batch plants
    • Gupta S., and Karimi I.A. An improved MILP formulation for scheduling multiproduct, multistage batch plants. Industrial and Engineering Chemistry Research 42 11 (2003) 2365-2380
    • (2003) Industrial and Engineering Chemistry Research , vol.42 , Issue.11 , pp. 2365-2380
    • Gupta, S.1    Karimi, I.A.2
  • 13
    • 2942627919 scopus 로고    scopus 로고
    • The scheduling problem of PCBs for multiple non-identical parallel machines
    • Hop N.V., and Nagarur N.N. The scheduling problem of PCBs for multiple non-identical parallel machines. European Journal of Operational Research 158 (2004) 577-594
    • (2004) European Journal of Operational Research , vol.158 , pp. 577-594
    • Hop, N.V.1    Nagarur, N.N.2
  • 14
    • 0034661353 scopus 로고    scopus 로고
    • A novel MILP formulation for short-term scheduling of multi-stage multi-product batch plants
    • Hui C.H., and Gupta A. A novel MILP formulation for short-term scheduling of multi-stage multi-product batch plants. Computers and Chemical Engineering 24 (2000) 1611-1617
    • (2000) Computers and Chemical Engineering , vol.24 , pp. 1611-1617
    • Hui, C.H.1    Gupta, A.2
  • 15
    • 0034387803 scopus 로고    scopus 로고
    • A novel MILP formulation for short-term scheduling of multi-stage multi-product batch plants with sequence-dependent constraints
    • Hui C.H., Gupta A., and Meulen H.A.J. A novel MILP formulation for short-term scheduling of multi-stage multi-product batch plants with sequence-dependent constraints. Computers and Chemical Engineering 24 (2000) 2705-2717
    • (2000) Computers and Chemical Engineering , vol.24 , pp. 2705-2717
    • Hui, C.H.1    Gupta, A.2    Meulen, H.A.J.3
  • 16
    • 28444469125 scopus 로고    scopus 로고
    • Metaheuristic algorithms for the multistage hybrid flowshop scheduling problem
    • Jin Z., Yang Z., and Ito T. Metaheuristic algorithms for the multistage hybrid flowshop scheduling problem. International Journal of Production Economics 100 (2006) 322-334
    • (2006) International Journal of Production Economics , vol.100 , pp. 322-334
    • Jin, Z.1    Yang, Z.2    Ito, T.3
  • 17
    • 9644269022 scopus 로고    scopus 로고
    • An improved formulation for scheduling an automated wet-etch station
    • Karimi I.A., Tan Y.L., and Bhushan S. An improved formulation for scheduling an automated wet-etch station. Computers and Chemical Engineering 29 1 (2004) 217-224
    • (2004) Computers and Chemical Engineering , vol.29 , Issue.1 , pp. 217-224
    • Karimi, I.A.1    Tan, Y.L.2    Bhushan, S.3
  • 18
  • 19
    • 34548513996 scopus 로고    scopus 로고
    • Koberstein, D. I. A. (2005). The dual simplex method, techniques for a fast and stable implementation. PhD Thesis. University Paderborn.
  • 22
    • 0025800703 scopus 로고
    • An evaluation of simulated annealing for batch process scheduling
    • Ku H.M., and Karimi I.A. An evaluation of simulated annealing for batch process scheduling. Industrial and Engineering Chemistry Research 30 1 (1991) 163-169
    • (1991) Industrial and Engineering Chemistry Research , vol.30 , Issue.1 , pp. 163-169
    • Ku, H.M.1    Karimi, I.A.2
  • 23
    • 0026158469 scopus 로고
    • Scheduling algorithms for serial multiproduct batch processes with tardiness penalties
    • Ku H.M., and Karimi I.A. Scheduling algorithms for serial multiproduct batch processes with tardiness penalties. Computers and Chemical Engineering 15 5 (1991) 283-286
    • (1991) Computers and Chemical Engineering , vol.15 , Issue.5 , pp. 283-286
    • Ku, H.M.1    Karimi, I.A.2
  • 24
    • 0022326617 scopus 로고
    • Approximate scheduling algorithms for network flowshops
    • Kuriyan K., and Reklaitis G.V. Approximate scheduling algorithms for network flowshops. PSE Symposium Series 92 (1984) 79-90
    • (1984) PSE Symposium Series , vol.92 , pp. 79-90
    • Kuriyan, K.1    Reklaitis, G.V.2
  • 26
    • 33846785064 scopus 로고    scopus 로고
    • Scheduling multi-stage, multi-product batch plants with non-identical parallel units and unlimited intermediate storage
    • Liu Y., and Karimi I.A. Scheduling multi-stage, multi-product batch plants with non-identical parallel units and unlimited intermediate storage. Chemical Engineering Science 62 6 (2007) 1549-1566
    • (2007) Chemical Engineering Science , vol.62 , Issue.6 , pp. 1549-1566
    • Liu, Y.1    Karimi, I.A.2
  • 27
    • 0031845056 scopus 로고    scopus 로고
    • Sequencing of batch operations for a highly coupled production process: Genetic algorithms versus mathematical programming
    • Lo{combining double acute accent}hl T., Schulz C., and Engell S. Sequencing of batch operations for a highly coupled production process: Genetic algorithms versus mathematical programming. Computers and Chemical Engineering 22 (1998) S579-S585
    • (1998) Computers and Chemical Engineering , vol.22
    • Lohl, T.1    Schulz, C.2    Engell, S.3
  • 28
    • 30344468781 scopus 로고    scopus 로고
    • A decomposition framework for the scheduling of single- and multi-stage processes
    • Maravelias C.T. A decomposition framework for the scheduling of single- and multi-stage processes. Computers and Chemical Engineering 30 (2006) 407-420
    • (2006) Computers and Chemical Engineering , vol.30 , pp. 407-420
    • Maravelias, C.T.1
  • 29
    • 0034307307 scopus 로고    scopus 로고
    • Optimal scheduling of batch plants satisfying multiple product orders with different due-dates
    • Mendez C.A., Henning G.P., and Cerda J. Optimal scheduling of batch plants satisfying multiple product orders with different due-dates. Computers and Chemical Engineering 24 (2000) 2223-2245
    • (2000) Computers and Chemical Engineering , vol.24 , pp. 2223-2245
    • Mendez, C.A.1    Henning, G.P.2    Cerda, J.3
  • 33
    • 0001690679 scopus 로고
    • A continuous time mixed integer linear programming model for short-term scheduling of multistage batch plants
    • Pinto J.M., and Grossmann I.E. A continuous time mixed integer linear programming model for short-term scheduling of multistage batch plants. Industrial and Engineering Chemistry Research 34 (1995) 3037-3051
    • (1995) Industrial and Engineering Chemistry Research , vol.34 , pp. 3037-3051
    • Pinto, J.M.1    Grossmann, I.E.2
  • 34
    • 0020291533 scopus 로고
    • Review of scheduling of process operations
    • Reklaitis G.V. Review of scheduling of process operations. AICHE Symposium Series 28 (1982) 119-133
    • (1982) AICHE Symposium Series , vol.28 , pp. 119-133
    • Reklaitis, G.V.1
  • 35
    • 0035501877 scopus 로고    scopus 로고
    • Sequencing three-stage flexible flowshops with identical machines to minimize makespan
    • Soewandi H., and Elmaghraby E.S. Sequencing three-stage flexible flowshops with identical machines to minimize makespan. IIE Transactions 33 (2001) 985-993
    • (2001) IIE Transactions , vol.33 , pp. 985-993
    • Soewandi, H.1    Elmaghraby, E.S.2
  • 36
    • 15344346066 scopus 로고    scopus 로고
    • A simple better slot-based continuous-time formulation for short-term scheduling in multipurpose batch plants
    • Sundaramoorthy A., and Karimi I.A. A simple better slot-based continuous-time formulation for short-term scheduling in multipurpose batch plants. Chemical Engineering Science 60 (2005) 2679-2702
    • (2005) Chemical Engineering Science , vol.60 , pp. 2679-2702
    • Sundaramoorthy, A.1    Karimi, I.A.2
  • 37
    • 0029394712 scopus 로고
    • Scheduling of multiple products on parallel units with tardiness penalties using simulated annealing
    • Tandon M., Cummings P.T., and LeVan M.D. Scheduling of multiple products on parallel units with tardiness penalties using simulated annealing. Computers and Chemical Engineering 19 (1995) 1069-1076
    • (1995) Computers and Chemical Engineering , vol.19 , pp. 1069-1076
    • Tandon, M.1    Cummings, P.T.2    LeVan, M.D.3
  • 38
    • 1642518689 scopus 로고    scopus 로고
    • A tabu search algorithm for the multi-stage parallel machine problem with limited buffer capacities
    • Wardono B., and Fathi Y. A tabu search algorithm for the multi-stage parallel machine problem with limited buffer capacities. European Journal of Operational Research 155 (2004) 380-401
    • (2004) European Journal of Operational Research , vol.155 , pp. 380-401
    • Wardono, B.1    Fathi, Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.