메뉴 건너뛰기




Volumn 27, Issue 10, 2011, Pages 1545-1557

Numerical method for determination of the optimal lot size for a manufacturing system with discontinuous issuing policy and rework

Author keywords

Defective; Discontinuous issuing policy; EMQ model; Imperfect rework process; Manufacturing; Optimal lot size

Indexed keywords

CLOSED FORM; DEFECTIVE; DEFECTIVE ITEMS; ECONOMIC MANUFACTURING QUANTITY MODELS; EMQ MODEL; IMPERFECT QUALITY; INTEGRATED SYSTEMS; LONG-RUN AVERAGE COST; MANUFACTURING SYSTEM; MATHEMATICAL MODELING; NUMERICAL EXAMPLE; OPTIMAL BATCH SIZE; OPTIMAL LOT SIZE; PRODUCTION RUN; QUALITY PRODUCTION; REWORK PROCESS;

EID: 80053281930     PISSN: 20407939     EISSN: 20407947     Source Type: Journal    
DOI: 10.1002/cnm.1369     Document Type: Article
Times cited : (9)

References (37)
  • 2
    • 0016079895 scopus 로고
    • A review of current inventory theory and its application
    • Aggarwal S. A review of current inventory theory and its application. International Journal of Production Research 1974; 12:443-482.
    • (1974) International Journal of Production Research , vol.12 , pp. 443-482
    • Aggarwal, S.1
  • 8
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production processes
    • Rosenblatt MJ, Lee HL. Economic production cycles with imperfect production processes. IIE Transactions 1986; 18:48-55.
    • (1986) IIE Transactions , vol.18 , pp. 48-55
    • Rosenblatt, M.J.1    Lee, H.L.2
  • 9
    • 0024037430 scopus 로고
    • Optimality of zero-inventory policies for unreliable production facility
    • Bielecki T, Kumar PR. Optimality of zero-inventory policies for unreliable production facility. Operations Research 1988; 36:532-541.
    • (1988) Operations Research , vol.36 , pp. 532-541
    • Bielecki, T.1    Kumar, P.R.2
  • 10
    • 33646804512 scopus 로고    scopus 로고
    • Numerical method for determination of reworking or scraping the defective items in a finite production rate model
    • Chiu Y-SP, Chiu SW, Chao H-C. Numerical method for determination of reworking or scraping the defective items in a finite production rate model. Communications in Numerical Methods in Engineering 2006; 22(5):377-386.
    • (2006) Communications in Numerical Methods in Engineering , vol.22 , Issue.5 , pp. 377-386
    • Chiu, Y.-S.1    Chiu, S.W.2    Chao, H.-C.3
  • 11
    • 0027927229 scopus 로고
    • Production-inventory systems with unreliable machines
    • Berg M, Posner MJM, Zhao H. Production-inventory systems with unreliable machines. Operations Research 1994; 42:111-118.
    • (1994) Operations Research , vol.42 , pp. 111-118
    • Berg, M.1    Posner, M.J.M.2    Zhao, H.3
  • 12
    • 33645163509 scopus 로고    scopus 로고
    • The effect of service level constraint on EPQ model with random defective rate
    • Article ID 98502
    • Chiu Y-SP. The effect of service level constraint on EPQ model with random defective rate. Mathematical Problems in Engineering 2006; 2006(Article ID 98502):1-13.
    • (2006) Mathematical Problems in Engineering , vol.2006 , pp. 1-13
    • Chiu, Y.-S.1
  • 13
    • 0039029278 scopus 로고    scopus 로고
    • The impact of imperfect processes on production run times
    • Boone T, Ganeshan R, Guo Y, Ord JK. The impact of imperfect processes on production run times. Decision Sciences 2000; 31:773-785.
    • (2000) Decision Sciences , vol.31 , pp. 773-785
    • Boone, T.1    Ganeshan, R.2    Guo, Y.3    Ord, J.K.4
  • 15
    • 0023435379 scopus 로고
    • Optimal inspection policies in serial production system including scrap, rework, and repair: an MILP approach
    • Yum BJ, McDowell ED. Optimal inspection policies in serial production system including scrap, rework, and repair: an MILP approach. International Journal of Production Research 1987; 25(10):1451-1464.
    • (1987) International Journal of Production Research , vol.25 , Issue.10 , pp. 1451-1464
    • Yum, B.J.1    McDowell, E.D.2
  • 16
    • 0027342221 scopus 로고
    • Analysis of a Markov chain model of a multistage manufacturing system with inspection, rejection, and rework
    • Yu K-YC, Bricker DL. Analysis of a Markov chain model of a multistage manufacturing system with inspection, rejection, and rework. IIE Transactions 1993; 25(1):109-112.
    • (1993) IIE Transactions , vol.25 , Issue.1 , pp. 109-112
    • Yu, K.-Y.1    Bricker, D.L.2
  • 17
    • 0029290859 scopus 로고
    • Optimal operating policy for a bottleneck with random rework
    • So KC, Tang CS. Optimal operating policy for a bottleneck with random rework. Management Sciences 1995; 41(4):620-636.
    • (1995) Management Sciences , vol.41 , Issue.4 , pp. 620-636
    • So, K.C.1    Tang, C.S.2
  • 18
    • 0042091890 scopus 로고    scopus 로고
    • Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs
    • Liu JJ, Yang P. Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs. European Journal of Operational Research 1996; 91(3):517-527.
    • (1996) European Journal of Operational Research , vol.91 , Issue.3 , pp. 517-527
    • Liu, J.J.1    Yang, P.2
  • 20
    • 0035470201 scopus 로고    scopus 로고
    • Production lot sizing with the reworking of imperfect quality items produced
    • Hayek PA, Salameh MK. Production lot sizing with the reworking of imperfect quality items produced. Production Planning and Control 2001; 12:584-590.
    • (2001) Production Planning and Control , vol.12 , pp. 584-590
    • Hayek, P.A.1    Salameh, M.K.2
  • 21
    • 0036565334 scopus 로고    scopus 로고
    • Multistage production to order with rework capability
    • Grosfeld-Nir A, Gerchak Y. Multistage production to order with rework capability. Management Science 2002; 48(5):652-664.
    • (2002) Management Science , vol.48 , Issue.5 , pp. 652-664
    • Grosfeld-Nir, A.1    Gerchak, Y.2
  • 22
    • 3242701287 scopus 로고    scopus 로고
    • Optimal manufacturing batch size with rework process at a single-stage production system
    • Jamal AMM, Sarker BR, Mondal S. Optimal manufacturing batch size with rework process at a single-stage production system. Computers and Industrial Engineering 2004; 47:77-89.
    • (2004) Computers and Industrial Engineering , vol.47 , pp. 77-89
    • Jamal, A.M.M.1    Sarker, B.R.2    Mondal, S.3
  • 23
    • 0142090745 scopus 로고    scopus 로고
    • Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging
    • Chiu YP. Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging. Engineering Optimization 2003; 35(4):427-437.
    • (2003) Engineering Optimization , vol.35 , Issue.4 , pp. 427-437
    • Chiu, Y.P.1
  • 24
    • 34247872840 scopus 로고    scopus 로고
    • Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging
    • Chiu SW. Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging. Applied Stochastic Models in Business and Industry 2007; 23:165-178.
    • (2007) Applied Stochastic Models in Business and Industry , vol.23 , pp. 165-178
    • Chiu, S.W.1
  • 25
    • 0017416997 scopus 로고
    • Integrated inventory model for a single supplier-single customer problem
    • Goyal SK. Integrated inventory model for a single supplier-single customer problem. International Journal of Production Research 1977; 15:107-111.
    • (1977) International Journal of Production Research , vol.15 , pp. 107-111
    • Goyal, S.K.1
  • 26
    • 0027666209 scopus 로고
    • Optimal batch size for a production system operating under a just-in-time delivery system
    • Jamal AMM, Sarker BR. Optimal batch size for a production system operating under a just-in-time delivery system. International Journal of Production Economics 1993; 32(2):255-260.
    • (1993) International Journal of Production Economics , vol.32 , Issue.2 , pp. 255-260
    • Jamal, A.M.M.1    Sarker, B.R.2
  • 27
  • 28
    • 84974873088 scopus 로고
    • An optimal batch size for a production system operating under a fixed-quantity, periodic delivery policy
    • Sarker BR, Parija GR. An optimal batch size for a production system operating under a fixed-quantity, periodic delivery policy. Journal of the Operational Research Society 1994; 45:891-900.
    • (1994) Journal of the Operational Research Society , vol.45 , pp. 891-900
    • Sarker, B.R.1    Parija, G.R.2
  • 29
    • 0029632685 scopus 로고
    • A one-vendor multi-buyer integrated inventory model
    • Lu L. A one-vendor multi-buyer integrated inventory model. European Journal of Operational Research 1995; 81(2):312-323.
    • (1995) European Journal of Operational Research , vol.81 , Issue.2 , pp. 312-323
    • Lu, L.1
  • 30
    • 0030190937 scopus 로고    scopus 로고
    • Optimizing a production system with a fixed delivery schedule
    • Hill RM. Optimizing a production system with a fixed delivery schedule. Journal of the Operational Research Society 1996; 47:954-960.
    • (1996) Journal of the Operational Research Society , vol.47 , pp. 954-960
    • Hill, R.M.1
  • 31
    • 0032002459 scopus 로고    scopus 로고
    • Optimal strategy for the integrated vendor-buyer inventory model
    • Viswanathan S. Optimal strategy for the integrated vendor-buyer inventory model. European Journal of Operational Research 1998; 105:38-42.
    • (1998) European Journal of Operational Research , vol.105 , pp. 38-42
    • Viswanathan, S.1
  • 32
    • 0033297229 scopus 로고    scopus 로고
    • Optimal batch size for a production system operating under periodic delivery policy
    • Sarker RA, Khan LR. Optimal batch size for a production system operating under periodic delivery policy. Computers and Industrial Engineering 1999; 37:711-730.
    • (1999) Computers and Industrial Engineering , vol.37 , pp. 711-730
    • Sarker, R.A.1    Khan, L.R.2
  • 33
    • 0037121477 scopus 로고    scopus 로고
    • A single-vendor and multiple-buyers production-inventory policy for a deteriorating item
    • Yang PC, Wee HM. A single-vendor and multiple-buyers production-inventory policy for a deteriorating item. European Journal of Operational Research 2002; 143(3):570-581.
    • (2002) European Journal of Operational Research , vol.143 , Issue.3 , pp. 570-581
    • Yang, P.C.1    Wee, H.M.2
  • 35
    • 9544241347 scopus 로고    scopus 로고
    • Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time
    • Ouyang L-Y, Wu K-S, Ho C-H. Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time. International Journal of Production Economics 2004; 92(3):255-266.
    • (2004) International Journal of Production Economics , vol.92 , Issue.3 , pp. 255-266
    • Ouyang, L.-Y.1    Wu, K.-S.2    Ho, C.-H.3
  • 36
    • 4644312239 scopus 로고    scopus 로고
    • Integrated single vendor single buyer model with stochastic demand and variable lead time
    • Ben-Daya M, Hariga M. Integrated single vendor single buyer model with stochastic demand and variable lead time. International Journal of Production Economics 2004; 92(1):75-80.
    • (2004) International Journal of Production Economics , vol.92 , Issue.1 , pp. 75-80
    • Ben-Daya, M.1    Hariga, M.2
  • 37
    • 29144436069 scopus 로고    scopus 로고
    • Finite horizon planning for a production system with permitted shortage and fixed-interval deliveries
    • Diponegoro A, Sarker BR. Finite horizon planning for a production system with permitted shortage and fixed-interval deliveries. Computers and Operations Research 2006; 33(8):2387-2404.
    • (2006) Computers and Operations Research , vol.33 , Issue.8 , pp. 2387-2404
    • Diponegoro, A.1    Sarker, B.R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.