-
2
-
-
0016079895
-
A review of current inventory theory and its application
-
Aggarwal S. A review of current inventory theory and its application. International Journal of Production Research 1974; 12:443-482.
-
(1974)
International Journal of Production Research
, vol.12
, pp. 443-482
-
-
Aggarwal, S.1
-
8
-
-
0022676316
-
Economic production cycles with imperfect production processes
-
Rosenblatt MJ, Lee HL. Economic production cycles with imperfect production processes. IIE Transactions 1986; 18:48-55.
-
(1986)
IIE Transactions
, vol.18
, pp. 48-55
-
-
Rosenblatt, M.J.1
Lee, H.L.2
-
9
-
-
0024037430
-
Optimality of zero-inventory policies for unreliable production facility
-
Bielecki T, Kumar PR. Optimality of zero-inventory policies for unreliable production facility. Operations Research 1988; 36:532-541.
-
(1988)
Operations Research
, vol.36
, pp. 532-541
-
-
Bielecki, T.1
Kumar, P.R.2
-
10
-
-
33646804512
-
Numerical method for determination of reworking or scraping the defective items in a finite production rate model
-
Chiu Y-SP, Chiu SW, Chao H-C. Numerical method for determination of reworking or scraping the defective items in a finite production rate model. Communications in Numerical Methods in Engineering 2006; 22(5):377-386.
-
(2006)
Communications in Numerical Methods in Engineering
, vol.22
, Issue.5
, pp. 377-386
-
-
Chiu, Y.-S.1
Chiu, S.W.2
Chao, H.-C.3
-
11
-
-
0027927229
-
Production-inventory systems with unreliable machines
-
Berg M, Posner MJM, Zhao H. Production-inventory systems with unreliable machines. Operations Research 1994; 42:111-118.
-
(1994)
Operations Research
, vol.42
, pp. 111-118
-
-
Berg, M.1
Posner, M.J.M.2
Zhao, H.3
-
12
-
-
33645163509
-
The effect of service level constraint on EPQ model with random defective rate
-
Article ID 98502
-
Chiu Y-SP. The effect of service level constraint on EPQ model with random defective rate. Mathematical Problems in Engineering 2006; 2006(Article ID 98502):1-13.
-
(2006)
Mathematical Problems in Engineering
, vol.2006
, pp. 1-13
-
-
Chiu, Y.-S.1
-
13
-
-
0039029278
-
The impact of imperfect processes on production run times
-
Boone T, Ganeshan R, Guo Y, Ord JK. The impact of imperfect processes on production run times. Decision Sciences 2000; 31:773-785.
-
(2000)
Decision Sciences
, vol.31
, pp. 773-785
-
-
Boone, T.1
Ganeshan, R.2
Guo, Y.3
Ord, J.K.4
-
14
-
-
34247097459
-
Optimal production lot sizing with backlogging, random defective rate, and rework derived without derivatives
-
Chiu Y-SP, Lin H-D, Cheng F-T. Optimal production lot sizing with backlogging, random defective rate, and rework derived without derivatives. Proceedings of the IMechE, Part B: Journal of Engineering Manufacture 2006; 220(9):1559-1563.
-
(2006)
Proceedings of the IMechE, Part B: Journal of Engineering Manufacture
, vol.220
, Issue.9
, pp. 1559-1563
-
-
Chiu, Y.-S.1
Lin, H.-D.2
Cheng, F.-T.3
-
15
-
-
0023435379
-
Optimal inspection policies in serial production system including scrap, rework, and repair: an MILP approach
-
Yum BJ, McDowell ED. Optimal inspection policies in serial production system including scrap, rework, and repair: an MILP approach. International Journal of Production Research 1987; 25(10):1451-1464.
-
(1987)
International Journal of Production Research
, vol.25
, Issue.10
, pp. 1451-1464
-
-
Yum, B.J.1
McDowell, E.D.2
-
16
-
-
0027342221
-
Analysis of a Markov chain model of a multistage manufacturing system with inspection, rejection, and rework
-
Yu K-YC, Bricker DL. Analysis of a Markov chain model of a multistage manufacturing system with inspection, rejection, and rework. IIE Transactions 1993; 25(1):109-112.
-
(1993)
IIE Transactions
, vol.25
, Issue.1
, pp. 109-112
-
-
Yu, K.-Y.1
Bricker, D.L.2
-
17
-
-
0029290859
-
Optimal operating policy for a bottleneck with random rework
-
So KC, Tang CS. Optimal operating policy for a bottleneck with random rework. Management Sciences 1995; 41(4):620-636.
-
(1995)
Management Sciences
, vol.41
, Issue.4
, pp. 620-636
-
-
So, K.C.1
Tang, C.S.2
-
18
-
-
0042091890
-
Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs
-
Liu JJ, Yang P. Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs. European Journal of Operational Research 1996; 91(3):517-527.
-
(1996)
European Journal of Operational Research
, vol.91
, Issue.3
, pp. 517-527
-
-
Liu, J.J.1
Yang, P.2
-
20
-
-
0035470201
-
Production lot sizing with the reworking of imperfect quality items produced
-
Hayek PA, Salameh MK. Production lot sizing with the reworking of imperfect quality items produced. Production Planning and Control 2001; 12:584-590.
-
(2001)
Production Planning and Control
, vol.12
, pp. 584-590
-
-
Hayek, P.A.1
Salameh, M.K.2
-
21
-
-
0036565334
-
Multistage production to order with rework capability
-
Grosfeld-Nir A, Gerchak Y. Multistage production to order with rework capability. Management Science 2002; 48(5):652-664.
-
(2002)
Management Science
, vol.48
, Issue.5
, pp. 652-664
-
-
Grosfeld-Nir, A.1
Gerchak, Y.2
-
22
-
-
3242701287
-
Optimal manufacturing batch size with rework process at a single-stage production system
-
Jamal AMM, Sarker BR, Mondal S. Optimal manufacturing batch size with rework process at a single-stage production system. Computers and Industrial Engineering 2004; 47:77-89.
-
(2004)
Computers and Industrial Engineering
, vol.47
, pp. 77-89
-
-
Jamal, A.M.M.1
Sarker, B.R.2
Mondal, S.3
-
23
-
-
0142090745
-
Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging
-
Chiu YP. Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging. Engineering Optimization 2003; 35(4):427-437.
-
(2003)
Engineering Optimization
, vol.35
, Issue.4
, pp. 427-437
-
-
Chiu, Y.P.1
-
24
-
-
34247872840
-
Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging
-
Chiu SW. Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging. Applied Stochastic Models in Business and Industry 2007; 23:165-178.
-
(2007)
Applied Stochastic Models in Business and Industry
, vol.23
, pp. 165-178
-
-
Chiu, S.W.1
-
25
-
-
0017416997
-
Integrated inventory model for a single supplier-single customer problem
-
Goyal SK. Integrated inventory model for a single supplier-single customer problem. International Journal of Production Research 1977; 15:107-111.
-
(1977)
International Journal of Production Research
, vol.15
, pp. 107-111
-
-
Goyal, S.K.1
-
26
-
-
0027666209
-
Optimal batch size for a production system operating under a just-in-time delivery system
-
Jamal AMM, Sarker BR. Optimal batch size for a production system operating under a just-in-time delivery system. International Journal of Production Economics 1993; 32(2):255-260.
-
(1993)
International Journal of Production Economics
, vol.32
, Issue.2
, pp. 255-260
-
-
Jamal, A.M.M.1
Sarker, B.R.2
-
28
-
-
84974873088
-
An optimal batch size for a production system operating under a fixed-quantity, periodic delivery policy
-
Sarker BR, Parija GR. An optimal batch size for a production system operating under a fixed-quantity, periodic delivery policy. Journal of the Operational Research Society 1994; 45:891-900.
-
(1994)
Journal of the Operational Research Society
, vol.45
, pp. 891-900
-
-
Sarker, B.R.1
Parija, G.R.2
-
29
-
-
0029632685
-
A one-vendor multi-buyer integrated inventory model
-
Lu L. A one-vendor multi-buyer integrated inventory model. European Journal of Operational Research 1995; 81(2):312-323.
-
(1995)
European Journal of Operational Research
, vol.81
, Issue.2
, pp. 312-323
-
-
Lu, L.1
-
30
-
-
0030190937
-
Optimizing a production system with a fixed delivery schedule
-
Hill RM. Optimizing a production system with a fixed delivery schedule. Journal of the Operational Research Society 1996; 47:954-960.
-
(1996)
Journal of the Operational Research Society
, vol.47
, pp. 954-960
-
-
Hill, R.M.1
-
31
-
-
0032002459
-
Optimal strategy for the integrated vendor-buyer inventory model
-
Viswanathan S. Optimal strategy for the integrated vendor-buyer inventory model. European Journal of Operational Research 1998; 105:38-42.
-
(1998)
European Journal of Operational Research
, vol.105
, pp. 38-42
-
-
Viswanathan, S.1
-
32
-
-
0033297229
-
Optimal batch size for a production system operating under periodic delivery policy
-
Sarker RA, Khan LR. Optimal batch size for a production system operating under periodic delivery policy. Computers and Industrial Engineering 1999; 37:711-730.
-
(1999)
Computers and Industrial Engineering
, vol.37
, pp. 711-730
-
-
Sarker, R.A.1
Khan, L.R.2
-
33
-
-
0037121477
-
A single-vendor and multiple-buyers production-inventory policy for a deteriorating item
-
Yang PC, Wee HM. A single-vendor and multiple-buyers production-inventory policy for a deteriorating item. European Journal of Operational Research 2002; 143(3):570-581.
-
(2002)
European Journal of Operational Research
, vol.143
, Issue.3
, pp. 570-581
-
-
Yang, P.C.1
Wee, H.M.2
-
35
-
-
9544241347
-
Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time
-
Ouyang L-Y, Wu K-S, Ho C-H. Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time. International Journal of Production Economics 2004; 92(3):255-266.
-
(2004)
International Journal of Production Economics
, vol.92
, Issue.3
, pp. 255-266
-
-
Ouyang, L.-Y.1
Wu, K.-S.2
Ho, C.-H.3
-
36
-
-
4644312239
-
Integrated single vendor single buyer model with stochastic demand and variable lead time
-
Ben-Daya M, Hariga M. Integrated single vendor single buyer model with stochastic demand and variable lead time. International Journal of Production Economics 2004; 92(1):75-80.
-
(2004)
International Journal of Production Economics
, vol.92
, Issue.1
, pp. 75-80
-
-
Ben-Daya, M.1
Hariga, M.2
-
37
-
-
29144436069
-
Finite horizon planning for a production system with permitted shortage and fixed-interval deliveries
-
Diponegoro A, Sarker BR. Finite horizon planning for a production system with permitted shortage and fixed-interval deliveries. Computers and Operations Research 2006; 33(8):2387-2404.
-
(2006)
Computers and Operations Research
, vol.33
, Issue.8
, pp. 2387-2404
-
-
Diponegoro, A.1
Sarker, B.R.2
|