-
1
-
-
0026116409
-
An economic order quantity model with demand-dependent unit production cost and imperfect production processes
-
Cheng TCE. An economic order quantity model with demand-dependent unit production cost and imperfect production processes. IIE Transactions 1991; 23:23-28.
-
(1991)
IIE Transactions
, vol.23
, pp. 23-28
-
-
Cheng, T.C.E.1
-
2
-
-
33645160232
-
A finite production model with random defective rate and shortages allowed and backordered
-
Chiu YP, Chiu SW. A finite production model with random defective rate and shortages allowed and backordered. Journal of Information and Optimization Science 2003; 24(3):553-567.
-
(2003)
Journal of Information and Optimization Science
, vol.24
, Issue.3
, pp. 553-567
-
-
Chiu, Y.P.1
Chiu, S.W.2
-
3
-
-
0042091890
-
Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs
-
Liu JJ, Yang P. Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs. European Journal of Operational Research 1996; 91:517-527.
-
(1996)
European Journal of Operational Research
, vol.91
, pp. 517-527
-
-
Liu, J.J.1
Yang, P.2
-
4
-
-
0022676316
-
Economic production cycles with imperfect production processes
-
Rosenblatt MJ, Lee HL. Economic production cycles with imperfect production processes. IIE Transactions 1986; 18:48-55.
-
(1986)
IIE Transactions
, vol.18
, pp. 48-55
-
-
Rosenblatt, M.J.1
Lee, H.L.2
-
6
-
-
0025399639
-
Joint lot sizing and inspection policy in and EOQ model with random yield
-
Zhang X, Gerchak Y. Joint lot sizing and inspection policy in and EOQ model with random yield. IIE Transactions 1990; 22:41-47.
-
(1990)
IIE Transactions
, vol.22
, pp. 41-47
-
-
Zhang, X.1
Gerchak, Y.2
-
7
-
-
0023412314
-
Simultaneous determination of production cycle and inspection schedules in a production system
-
Lee HL, Rosenblatt MJ. Simultaneous determination of production cycle and inspection schedules in a production system. Management Science 1987; 33:1125-1136.
-
(1987)
Management Science
, vol.33
, pp. 1125-1136
-
-
Lee, H.L.1
Rosenblatt, M.J.2
-
8
-
-
0035470201
-
Production lot sizing with the reworking of imperfect quality items produced
-
Hayek PA, Salameh MK. Production lot sizing with the reworking of imperfect quality items produced. Production Planning and Control 2001; 12(6):584-590.
-
(2001)
Production Planning and Control
, vol.12
, Issue.6
, pp. 584-590
-
-
Hayek, P.A.1
Salameh, M.K.2
-
10
-
-
0142090745
-
Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging
-
Chiu YP. Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging. Engineering Optimization 2003; 35(4):427-437.
-
(2003)
Engineering Optimization
, vol.35
, Issue.4
, pp. 427-437
-
-
Chiu, Y.P.1
-
11
-
-
0037954442
-
Approximations to production lot sizing with machine breakdowns
-
Chung KJ. Approximations to production lot sizing with machine breakdowns. Computers and Operations Research 2003; 30:1499-1507.
-
(2003)
Computers and Operations Research
, vol.30
, pp. 1499-1507
-
-
Chung, K.J.1
-
12
-
-
0003397637
-
-
(4th edn). McGraw-Hill, Irwin: New York, Homewood, IL
-
Nahmias S. Production and Operations Analysis (4th edn). McGraw-Hill, Irwin: New York, Homewood, IL, 2001; 211-213.
-
(2001)
Production and Operations Analysis
, pp. 211-213
-
-
Nahmias, S.1
|