메뉴 건너뛰기




Volumn 1, Issue , 2001, Pages 493-500

Affordable space systems manufacturing: Intelligent synthesis technology, process planning, and production scheduling

Author keywords

Internet based design and manufacturing

Indexed keywords

AUTOMATION; COMPUTER AIDED MANUFACTURING; FEEDBACK CONTROL; HTTP; INTELLIGENT CONTROL; INTERNET; KNOWLEDGE ENGINEERING; OPTIMIZATION; PRODUCT DEVELOPMENT; SIMULATED ANNEALING; XML; AEROSPACE INDUSTRY; KNOWLEDGE BASED SYSTEMS; KNOWLEDGE MANAGEMENT; PROCESS PLANNING; PRODUCTION CONTROL; SCHEDULING;

EID: 1342302588     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (5)

References (25)
  • 4
    • 0027306874 scopus 로고
    • Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics
    • Lawrence, S.R., and T.E. Morton, "Resource-constrained multi-project scheduling with tardy costs: comparing myopic, bottleneck, and resource pricing heuristics," European Journal of Operational Research, Volume 62, pages 168-187, 1993.
    • (1993) European Journal of Operational Research , vol.62 , pp. 168-187
    • Lawrence, S.R.1    Morton, T.E.2
  • 5
    • 0019047699 scopus 로고
    • Two approaches to problems of resource allocation among project activities: A comparative study
    • Slowinski, R., "Two approaches to problems of resource allocation among project activities: a comparative study," Journal of Operational Research Society, Volume 31, pages 711-723, 1980.
    • (1980) Journal of Operational Research Society , vol.31 , pp. 711-723
    • Slowinski, R.1
  • 6
    • 0019586862 scopus 로고
    • Multiobjective network scheduling with efficient use of renewable and nonrenewable resources
    • Slowinski, R., "Multiobjective network scheduling with efficient use of renewable and nonrenewable resources," European Journal of Operational Research, Volume 7, pages 265-273, 1981.
    • (1981) European Journal of Operational Research , vol.7 , pp. 265-273
    • Slowinski, R.1
  • 7
    • 0043156425 scopus 로고
    • Solving the general project scheduling problem with multiple constrained resources by mathematical programming
    • Slowinski, R., and J. Weglarz, "Solving the general project scheduling problem with multiple constrained resources by mathematical programming," Lect. Notes Cont. and Infor. Syst., Volume 7, pages 278-289, 1978.
    • (1978) Lect. Notes Cont. and Infor. Syst. , vol.7 , pp. 278-289
    • Slowinski, R.1    Weglarz, J.2
  • 8
    • 0020193734 scopus 로고
    • Resource-constrained project scheduling with time-resource tradeoffs: The nonpreemptive case
    • Talbot, F.B., "Resource-constrained project scheduling with time-resource tradeoffs: the nonpreemptive case," Management Science, Volume 28, pages 1197-1210, 1982.
    • (1982) Management Science , vol.28 , pp. 1197-1210
    • Talbot, F.B.1
  • 9
    • 0345119816 scopus 로고
    • Control in resource allocation systems
    • Weglarz, J., "Control in resource allocation systems," Found. Cont. Eng., Volume 5, pages 159-180, 1980.
    • (1980) Found. Cont. Eng. , vol.5 , pp. 159-180
    • Weglarz, J.1
  • 10
    • 84945708193 scopus 로고
    • An automatic revised simplex method for constrained resource network scheduling
    • Weglarz, J., J. Blazewicz, J. Cellary, and R. Slowinski, "An automatic revised simplex method for constrained resource network scheduling," ACM Trans. Math. Soft., Volume 3, pages 295-300, 1977.
    • (1977) ACM Trans. Math. Soft. , vol.3 , pp. 295-300
    • Weglarz, J.1    Blazewicz, J.2    Cellary, J.3    Slowinski, R.4
  • 11
    • 0023169183 scopus 로고
    • Scheduling on machines with variable service rates
    • Adiri, I., and Z. Yehudai, "Scheduling on machines with variable service rates," Computers and Operations Research, Volume 14, pages 289-297, 1987.
    • (1987) Computers and Operations Research , vol.14 , pp. 289-297
    • Adiri, I.1    Yehudai, Z.2
  • 12
    • 0025478981 scopus 로고
    • A multi-objective approach to resource allocation in single machine scheduling
    • Daniels, R.L., "A multi-objective approach to resource allocation in single machine scheduling," European Journal of Operational Research, Volume 48, pages 226-241, 1990.
    • (1990) European Journal of Operational Research , vol.48 , pp. 226-241
    • Daniels, R.L.1
  • 13
    • 0024769314 scopus 로고
    • Single machine scheduling with controllable processing times and number of jobs tardy
    • Daniels, R.L., and R.K. Sarin, "Single machine scheduling with controllable processing times and number of jobs tardy," Operations Research, Volume 37, pages 981-984, 1989.
    • (1989) Operations Research , vol.37 , pp. 981-984
    • Daniels, R.L.1    Sarin, R.K.2
  • 14
    • 0030737194 scopus 로고    scopus 로고
    • Flow-line scheduling problems with controllable processing times
    • Karabati, S., and P. Kouvelis, "Flow-line scheduling problems with controllable processing times," IIE Transactions, Volume 29, pages 1-15, 1997.
    • (1997) IIE Transactions , vol.29 , pp. 1-15
    • Karabati, S.1    Kouvelis, P.2
  • 15
    • 0028383503 scopus 로고
    • Scheduling multiple variable-speed machines
    • Trick, M.A., "Scheduling multiple variable-speed machines," Operations Research, Volume 42, pages 234-248, 1994.
    • (1994) Operations Research , vol.42 , pp. 234-248
    • Trick, M.A.1
  • 17
    • 0019055358 scopus 로고
    • Two single-machine sequencing problems involving controllable job processing times
    • Vickson, R.G., "Two single-machine sequencing problems involving controllable job processing times," AIIE Transactions, Volume 12, pages 258-262, 1980.
    • (1980) AIIE Transactions , vol.12 , pp. 258-262
    • Vickson, R.G.1
  • 18
    • 0019058538 scopus 로고
    • Choosing the job sequence and processing times to minimize processing plus flow cost on a single machine
    • Vickson, R.G., "Choosing the job sequence and processing times to minimize processing plus flow cost on a single machine," Operations Research, Volume 28, pages 1155-1167, 1980.
    • (1980) Operations Research , vol.28 , pp. 1155-1167
    • Vickson, R.G.1
  • 19
    • 0001691215 scopus 로고    scopus 로고
    • Scheduling parallel manufacturing cells with resource flexibility
    • Daniels, R.L., Hoopes, B.J., and J.B. Mazzola, "Scheduling parallel manufacturing cells with resource flexibility," Management Science, Volume 42, pages 1260-1276, 1996.
    • (1996) Management Science , vol.42 , pp. 1260-1276
    • Daniels, R.L.1    Hoopes, B.J.2    Mazzola, J.B.3
  • 20
    • 0028424243 scopus 로고
    • Flow shop scheduling with resource flexibility
    • Daniels, R.L., and J.B. Mazzola, "Flow shop scheduling with resource flexibility," Operations Research, Volume 42, pages 504-522, 1994.
    • (1994) Operations Research , vol.42 , pp. 504-522
    • Daniels, R.L.1    Mazzola, J.B.2
  • 21
    • 0034135525 scopus 로고    scopus 로고
    • A method for scheduling in parallel manufacturing systems with flexible resources
    • Olafsson, S., and L. Shi, "A method for scheduling in parallel manufacturing systems with flexible resources," IIE Transactions, Volume 32, pages 135-146, 2000.
    • (2000) IIE Transactions , vol.32 , pp. 135-146
    • Olafsson, S.1    Shi, L.2
  • 22
    • 0005383722 scopus 로고    scopus 로고
    • On PERT Networks with Alternatives
    • INRIA, Le Chesnay Cedex, France
    • Chauvet, F., E. Levner, and J.-M. Proth, "On PERT Networks with Alternatives," Research Report 3583, INRIA, Le Chesnay Cedex, France, 1998.
    • (1998) Research Report , vol.3583
    • Chauvet, F.1    Levner, E.2    Proth, J.-M.3
  • 23
    • 0024066349 scopus 로고
    • Selection of process plans in automated manufacturing systems
    • Kusiak, A., and G. Finke, "Selection of process plans in automated manufacturing systems," IEEE Transactions on Robotics and Automation, Volume 4, pages 397-402, 1988.
    • (1988) IEEE Transactions on Robotics and Automation , vol.4 , pp. 397-402
    • Kusiak, A.1    Finke, G.2
  • 24
    • 0030092566 scopus 로고    scopus 로고
    • Cybernetic Optimization By Simulated Annealing: Accelerating Convergence By Parallel Processing and Probabilistic Feedback Control
    • Spring 1996
    • Fleischer, M. (1996), "Cybernetic Optimization By Simulated Annealing: Accelerating Convergence By Parallel Processing and Probabilistic Feedback Control". Journal of Heuristics, Vol. 1, No. 2, Spring 1996, pp.225-246.
    • (1996) Journal of Heuristics , vol.1 , Issue.2 , pp. 225-246
    • Fleischer, M.1
  • 25
    • 1342276664 scopus 로고    scopus 로고
    • Generalized Cybernetic Optimization: Solving Continuous Variable Problems
    • S. Voß, S. Martello, I. Osman, and C. Roucairol, editors. Kluwer Academic Publishers, Norwell, MA., Chapter 28
    • Fleischer, M. (1998), "Generalized Cybernetic Optimization: Solving Continuous Variable Problems" in Metaheuristics: Advances and Trends in Local Search Paradigms for Optimization, S. Voß, S. Martello, I. Osman, and C. Roucairol, editors. Kluwer Academic Publishers, Norwell, MA., Chapter 28, pp.403-418.
    • (1998) Metaheuristics: Advances and Trends in Local Search Paradigms for Optimization , pp. 403-418
    • Fleischer, M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.