Volumn 61, Issue 1, 2011, Pages 171-178

A simulated annealing algorithm for the job shop cell scheduling problem with intercellular moves and reentrant parts

Author keywords

Cellular manufacturing; Job shop; Scheduling; Simulated annealing

Indexed keywords

CELL SCHEDULING; CELLULAR MANUFACTURING SYSTEMS; COMPUTATIONAL RESULTS; ILP MODELS; INTEGER LINEAR PROGRAMMING MODELS; INTERCELLULAR MOVES; JOB SHOP; MAKESPAN; MULTIPLE PROCESSING; NEIGHBORHOOD STRUCTURE; OPTIMAL VALUES; PROBLEM INSTANCES; SA ALGORITHM; SEARCH ALGORITHMS; SIMULATED ANNEALING ALGORITHMS; SOLUTION APPROACH;

EID: 79955908237     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2011.03.007     Document Type: Article
Times cited : (105)

References (43)
  • 1
    • 0013419890 scopus 로고
    • Designing GT cells enhanced by group scheduling: Key to flexible manufacturing systems
    • Missouri
    • Al-Quattan, I. (1988). Designing GT cells enhanced by group scheduling: key to flexible manufacturing systems. In Proceedings IIE Integrated Systems Conference (pp. 25-30). Missouri.
    • (1988) Proceedings IIE Integrated Systems Conference , pp. 25-30
    • Al-Quattan, I.1
  • 2
    • 33847731424 scopus 로고    scopus 로고
    • Applying simulated annealing to cellular manufacturing system design
    • DOI 10.1007/s00170-005-0358-5
    • J. Arkat, M. Saidi, and B. Abbasi Applying simulated annealing to cellular manufacturing system design International Journal of Advanced Manufacturing Technology 32 2007 531 536 (Pubitemid 46375266)
    • (2007) International Journal of Advanced Manufacturing Technology , vol.32 , Issue.5-6 , pp. 531-536
    • Arkat, J.1    Saidi, M.2    Abbasi, B.3
  • 3
    • 0025256245 scopus 로고
    • Scheduling groups of jobs in the two-machine flow shop
    • DOI 10.1016/0895-7177(90)90368-W
    • K.R. Baker Scheduling groups of jobs in the two machine flow shop Mathematical and Computer Modeling 13 1990 29 36 (Pubitemid 20693488)
    • (1990) Mathematical and Computer Modelling , vol.13 , Issue.3 , pp. 29-36
    • Baker, K.R.1
  • 5
    • 0030212629 scopus 로고    scopus 로고
    • The job shop scheduling problem: Conventional and new solution techniques
    • DOI 10.1016/0377-2217(95)00362-2
    • J. Blalzewicz, W. Domschke, and E. Pesch The job shop scheduling problem: Conventional and new solution techniques European Journal of Operational Research 2 1996 1 33 (Pubitemid 126389264)
    • (1996) European Journal of Operational Research , vol.93 , Issue.1 , pp. 1-33
    • Blazewicz, J.1    Domschke, W.2    Pesch, E.3
  • 6
    • 0014807274 scopus 로고
    • A heuristic algorithm for the n job, m machine sequencing problem
    • H.G. Campbell, R.A. Dudek, and M.L. Smith A heuristic algorithm for the n job, m machine sequencing problem Management Science 16 1970 B630 B637
    • (1970) Management Science , vol.16
    • Campbell, H.G.1    Dudek, R.A.2    Smith, M.L.3
  • 7
    • 0030242695 scopus 로고    scopus 로고
    • A tutorial survey of job-shop scheduling problems using genetic algorithms - I. Representation
    • DOI 10.1016/0360-8352(96)00047-2
    • R. Cheng, M. Gen, and Y. Tsujimura A tutorial survey of job-shop scheduling problems using genetic algorithms Computers and Industrial Engineering 30 4 1996 983 997 (Pubitemid 126375908)
    • (1996) Computers and Industrial Engineering , vol.30 , Issue.4 , pp. 983-997
    • Cheng, R.1    Gen, M.2    Tsujimura, Y.3
  • 9
    • 0004215426 scopus 로고    scopus 로고
    • Kluwer Academic Publishers. Dordrecht
    • F. Glover, and M. Laguna Tabu search 1997 Kluwer Academic Publishers. Dordrecht
    • (1997) Tabu Search
    • Glover, F.1    Laguna, M.2
  • 10
    • 0025247622 scopus 로고
    • Efficient heuristic in manufacturing cell formation for group technology applications
    • G. Harhalakis, R. Nagi, and J.M. Proth An efficient heuristic in manufacturing cell formation for group technology applications International Journal of Production Research 28 1 1990 185 198 (Pubitemid 20624211)
    • (1990) International Journal of Production Research , vol.28 , Issue.1 , pp. 185-198
    • Harhalakis, G.1    Nagi, R.2    Proth, J.M.3
  • 11
    • 37349074079 scopus 로고    scopus 로고
    • Meta-heuristics for scheduling a flowline manufacturing cell with sequence dependent family setup times
    • DOI 10.1016/j.ijpe.2007.02.031, PII S0925527307001016
    • S.H. Hendizadeh, H. Faramarzi, S.A. Mansouri, J.N.D. Gupta, and T.Y. ElMekkawy Meta-heuristics for scheduling a flowline manufacturing cell with sequence dependent family setup times International Journal of Production Economics 111 2008 593 605 (Pubitemid 350299155)
    • (2008) International Journal of Production Economics , vol.111 , Issue.2 , pp. 593-605
    • Hamed Hendizadeh, S.1    Faramarzi, H.2    Mansouri, S.A.3    Gupta, J.N.D.4    Y ElMekkawy, T.5
  • 12
    • 0000613599 scopus 로고
    • Operations scheduling for group technology applications
    • K. Hitomi, and I. Ham Operations scheduling for group technology applications Annals of the CIRP 25 1 1976 419 422
    • (1976) Annals of the CIRP , vol.25 , Issue.1 , pp. 419-422
    • Hitomi, K.1    Ham, I.2
  • 13
    • 77549083772 scopus 로고    scopus 로고
    • Bi-objective group scheduling in hybrid flexible flowshop: A multi phase approach
    • N. Karimi, M. Zandieh, and R. Kar-Amooz Bi-objective group scheduling in hybrid flexible flowshop: A multi phase approach Expert Systems with Applications 37 6 2009 4024 4032
    • (2009) Expert Systems with Applications , vol.37 , Issue.6 , pp. 4024-4032
    • Karimi, N.1    Zandieh, M.2    Kar-Amooz, R.3
  • 14
    • 26444479778 scopus 로고
    • Optimization by simulated annealing
    • S. Kirkpatrick, C.D. Gelatt, and M.P. Vecchi Optimization by simulated annealing Science 220 4598 1983 671 680
    • (1983) Science , vol.220 , Issue.4598 , pp. 671-680
    • Kirkpatrick, S.1    Gelatt, C.D.2    Vecchi, M.P.3
  • 15
    • 54449099668 scopus 로고    scopus 로고
    • Metaheuristics for scheduling a non-pemutation flowline manufacturing cell with sequence dependent family setup times
    • S.W. Lin, K.C. Ying, and Z.J. Lee Metaheuristics for scheduling a non-pemutation flowline manufacturing cell with sequence dependent family setup times Computers and Operations Research 36 2009 1110 1121
    • (2009) Computers and Operations Research , vol.36 , pp. 1110-1121
    • Lin, S.W.1    Ying, K.C.2    Lee, Z.J.3
  • 21
    • 0036497433 scopus 로고    scopus 로고
    • The impact of management and employees on cellular manufacturing implementation
    • DOI 10.1016/S0925-5273(01)00155-4, PII S0925527301001554
    • F. Olorunniwo, and G. Udo The impact of management and employees on cellular manufacturing implementation International Journal of Production Economics 76 1 2002 27 38 (Pubitemid 33107294)
    • (2002) International Journal of Production Economics , vol.76 , Issue.1 , pp. 27-38
    • Olorunniwo, F.1    Udo, G.2
  • 24
  • 25
    • 68249091110 scopus 로고    scopus 로고
    • Total flow time minimization in a flow shop sequence-dependent group scheduling problem
    • N. Salmasi, R. Logendran, and M. Skandari Total flow time minimization in a flow shop sequence-dependent group scheduling problem Computers and Operations Research 37 2010 199 212
    • (2010) Computers and Operations Research , vol.37 , pp. 199-212
    • Salmasi, N.1    Logendran, R.2    Skandari, M.3
  • 26
    • 0035501183 scopus 로고    scopus 로고
    • A new lower bound for the flow shop group scheduling problem
    • DOI 10.1016/S0360-8352(01)00049-3, PII S0360835201000493
    • J. Schaller A new lower bound for the flow shop group scheduling problem Computers and Industrial Engineering 41 2001 151 161 (Pubitemid 32935093)
    • (2001) Computers and Industrial Engineering , vol.41 , Issue.2 , pp. 151-161
    • Schaller, J.1
  • 27
    • 0001076076 scopus 로고
    • A simulation analysis of factors influencing loading practices in cellular manufacturing
    • S.M. Shafer, and J.M. Charnes A simulation analysis of factors influencing loading practices in cellular manufacturing International Journal of Production Research 33 1 1995 279 290
    • (1995) International Journal of Production Research , vol.33 , Issue.1 , pp. 279-290
    • Shafer, S.M.1    Charnes, J.M.2
  • 28
    • 0032623938 scopus 로고    scopus 로고
    • Some design issues in cellular manufacturing using the fuzzy programming approach
    • R. Shankar, and P. Vart Some design issues in cellular manufacturing using the fuzzy programming approach International Journal of Production Research 37 11 1999 2545 2563
    • (1999) International Journal of Production Research , vol.37 , Issue.11 , pp. 2545-2563
    • Shankar, R.1    Vart, P.2
  • 29
    • 0033080247 scopus 로고    scopus 로고
    • Manufacturing cell design with alternative process plans and/or replicate machines
    • S. Sofianopoulou Manufacturing cell design with alternative process plans and/or replicate machines International Journal of Production Research 37 3 1999 707 720
    • (1999) International Journal of Production Research , vol.37 , Issue.3 , pp. 707-720
    • Sofianopoulou, S.1
  • 31
    • 0343090519 scopus 로고    scopus 로고
    • Evaluation of manufacturing cell loading rules for independent cells
    • G.A. Suer, M. Saiz, and W. Gonzalez Evaluation of manufacturing cell loading rules for independent cells International Journal of Production Research 37 15 1999 3445 3468 (Pubitemid 30511975)
    • (1999) International Journal of Production Research , vol.37 , Issue.15 , pp. 3445-3468
    • Suer, G.A.1    Saiz, M.2    Gonzalez, W.3
  • 32
    • 77955655189 scopus 로고    scopus 로고
    • Optimization of parts scheduling in multiple cells considering intercell move using scatter search approach
    • J. Tang, X. Wang, I. Kaku, and K.L. Yung Optimization of parts scheduling in multiple cells considering intercell move using scatter search approach Journal of Intelligent Manufacturing 21 4 2010 525 537
    • (2010) Journal of Intelligent Manufacturing , vol.21 , Issue.4 , pp. 525-537
    • Tang, J.1    Wang, X.2    Kaku, I.3    Yung, K.L.4
  • 33
    • 70449526276 scopus 로고    scopus 로고
    • Design of a scatter search method for a novel multi-criteria group scheduling problem in a cellular manufacturing system
    • R. Tavakkoli-Moghaddam, N. Javadian, A. Khorrami, and Y. Gholipour-Kanani Design of a scatter search method for a novel multi-criteria group scheduling problem in a cellular manufacturing system Expert Systems with Applications 37 2009 2661 2669
    • (2009) Expert Systems with Applications , vol.37 , pp. 2661-2669
    • Tavakkoli-Moghaddam, R.1    Javadian, N.2    Khorrami, A.3    Gholipour-Kanani, Y.4
  • 34
    • 36248985029 scopus 로고    scopus 로고
    • Scheduling in cellular manufacturing systems: An heuristic approach
    • DOI 10.1080/00207540601138577, PII 778048149, Selected papers from the 2nd Group Technology/Cellular Manufacturing World Symposium
    • S. Venkataramanaiah Scheduling in cellular manufacturing systems: An heuristic approach International Journal of Production Research 42 2 2008 429 449 (Pubitemid 350136917)
    • (2008) International Journal of Production Research , vol.46 , Issue.2 , pp. 429-449
    • Venkataramanaiah, S.1
  • 36
    • 0030865490 scopus 로고    scopus 로고
    • Multiple criteria clustering algorithm for solving the group technology problem with multiple process routings
    • Y. Won, and S. Kim Multiple criteria clustering algorithm for solving the group technology problem with multiple process routing Computers and Industrial Engineering 32 1 1997 207 220 (Pubitemid 127422480)
    • (1997) Computers and Industrial Engineering , vol.32 , Issue.1 , pp. 207-220
    • Won, Y.1    Kim, S.2
  • 37
    • 0030271143 scopus 로고    scopus 로고
    • Group scheduling on two cells with inter-cell movement
    • W.H. Yang, and C.J. Liao Group scheduling on two cells with inter-cell movement Computers and Operations Research 23 1996 997 1006
    • (1996) Computers and Operations Research , vol.23 , pp. 997-1006
    • Yang, W.H.1    Liao, C.J.2
  • 39
    • 77951142861 scopus 로고    scopus 로고
    • Permutation and non-permutation schedules for the flowline manufacturing cell with sequence dependent family setups
    • K.C. Ying, J.N.D. Gupta, S.W. Lin, and Z.J. Lee Permutation and non-permutation schedules for the flowline manufacturing cell with sequence dependent family setups International Journal of Production Research 48 8 2009 2169 2184
    • (2009) International Journal of Production Research , vol.48 , Issue.8 , pp. 2169-2184
    • Ying, K.C.1    Gupta, J.N.D.2    Lin, S.W.3    Lee, Z.J.4
  • 41
    • 67749093325 scopus 로고    scopus 로고
    • Robust metaheuristics for group scheduling with sequence dependent setup times in hybrid flexible flow shops
    • M. Zandieh, B. Dorri, and A.R. Khamseh Robust metaheuristics for group scheduling with sequence dependent setup times in hybrid flexible flow shops International Journal of Advanced Manufacturing Technology 43 2009 767 778
    • (2009) International Journal of Advanced Manufacturing Technology , vol.43 , pp. 767-778
    • Zandieh, M.1    Dorri, B.2    Khamseh, A.R.3
  • 42
    • 84855508353 scopus 로고    scopus 로고
    • An adaptive multi-population genetic algorithm to solve the multi-objective group scheduling problem in hybrid flexible flowshop with sequence-dependent setup times
    • M. Zandieh, and N. Karimi An adaptive multi-population genetic algorithm to solve the multi-objective group scheduling problem in hybrid flexible flowshop with sequence-dependent setup times Journal of Intelligent Manufacturing 3 2010 5 9 10.1007/s10845-009-0374-7
    • (2010) Journal of Intelligent Manufacturing , vol.3 , pp. 5-9
    • Zandieh, M.1    Karimi, N.2
  • 43
    • 34047181443 scopus 로고    scopus 로고
    • A tabu search algorithm with a new neighborhood structure for the job shop scheduling problem
    • C.Y. Zhang, P.G. Li, Z.L. Guan, and Y.Q. Rao A tabu search algorithm with a new neighborhood structure for the job shop scheduling problem Computers and Operations Research 34 11 2007 3229 3242
    • (2007) Computers and Operations Research , vol.34 , Issue.11 , pp. 3229-3242
    • Zhang, C.Y.1    Li, P.G.2    Guan, Z.L.3    Rao, Y.Q.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.