-
2
-
-
84892234592
-
-
Prentice-Hall, Englewood Cliffs, NJ
-
Pinedo M. Scheduling theory, algorithms, and systems. 3rd ed. (2008), Prentice-Hall, Englewood Cliffs, NJ
-
(2008)
Scheduling theory, algorithms, and systems. 3rd ed.
-
-
Pinedo, M.1
-
5
-
-
33748492325
-
Scheduling and lot sizing with sequence-dependent setups: a literature review
-
Zhu X., and Wilhelm W.E. Scheduling and lot sizing with sequence-dependent setups: a literature review. IIE Transactions 38 (2006) 987-1007
-
(2006)
IIE Transactions
, vol.38
, pp. 987-1007
-
-
Zhu, X.1
Wilhelm, W.E.2
-
6
-
-
36849082395
-
A survey of scheduling problems with setup times or costs
-
Allahverdi A., Ng C.T., Cheng T.C.E., and Kovalyov M.Y. A survey of scheduling problems with setup times or costs. European Journal of Operational Research 187 3 (2008) 985-1032
-
(2008)
European Journal of Operational Research
, vol.187
, Issue.3
, pp. 985-1032
-
-
Allahverdi, A.1
Ng, C.T.2
Cheng, T.C.E.3
Kovalyov, M.Y.4
-
7
-
-
36448991772
-
Evolutionary algorithms for scheduling a flowshop manufacturing cell with sequence dependent family setups
-
Franca P.M., Gupta J.N.D., Mendes P.M., and Veltink K.J. Evolutionary algorithms for scheduling a flowshop manufacturing cell with sequence dependent family setups. Computers and Industrial Engineering 20 (2005) 1-16
-
(2005)
Computers and Industrial Engineering
, vol.20
, pp. 1-16
-
-
Franca, P.M.1
Gupta, J.N.D.2
Mendes, P.M.3
Veltink, K.J.4
-
8
-
-
21444451875
-
Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups
-
Logendran R., Salmasi N., and Sriskandarajah C. Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups. Journal of Computers and Operations Research 33 (2006) 158-180
-
(2006)
Journal of Computers and Operations Research
, vol.33
, pp. 158-180
-
-
Logendran, R.1
Salmasi, N.2
Sriskandarajah, C.3
-
9
-
-
37349074079
-
Meta-heuristics for scheduling a flowshop manufacturing cell with sequence dependent family setup times
-
Hendizadeh H., Faramarzi H., Mansouri S.A., Gupta J.N.D., and Elmekkawy T.Y. Meta-heuristics for scheduling a flowshop manufacturing cell with sequence dependent family setup times. International Journal of Production Economics 111 (2008) 593-605
-
(2008)
International Journal of Production Economics
, vol.111
, pp. 593-605
-
-
Hendizadeh, H.1
Faramarzi, H.2
Mansouri, S.A.3
Gupta, J.N.D.4
Elmekkawy, T.Y.5
-
11
-
-
0020699921
-
A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem
-
Nawaz M., Enscore E., and Ham I. A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem. Omega, International Journal of Management Science 11 1 (1983) 91-95
-
(1983)
Omega, International Journal of Management Science
, vol.11
, Issue.1
, pp. 91-95
-
-
Nawaz, M.1
Enscore, E.2
Ham, I.3
-
13
-
-
0030759617
-
Ant colonies for the traveling salesman problem
-
Dorigo M., and Gambardella L.M. Ant colonies for the traveling salesman problem. BioSystems 43 2 (1997) 73-81
-
(1997)
BioSystems
, vol.43
, Issue.2
, pp. 73-81
-
-
Dorigo, M.1
Gambardella, L.M.2
-
14
-
-
31744439035
-
An ant-colony optimization algorithm for minimizing the completion-time variance of jobs in flowshops
-
Gajpal Y., and Rajendran C. An ant-colony optimization algorithm for minimizing the completion-time variance of jobs in flowshops. International Journal of Production Economics 101 (2006) 259-272
-
(2006)
International Journal of Production Economics
, vol.101
, pp. 259-272
-
-
Gajpal, Y.1
Rajendran, C.2
-
15
-
-
0000816725
-
Branch and price: column generation for solving huge integer programs
-
Barnhart C., Johnson E.L., Nemhauser G.L., Savelsbergh M.W.P., and Vance P.H. Branch and price: column generation for solving huge integer programs. Operations Research 46 3 (1998) 316-329
-
(1998)
Operations Research
, vol.46
, Issue.3
, pp. 316-329
-
-
Barnhart, C.1
Johnson, E.L.2
Nemhauser, G.L.3
Savelsbergh, M.W.P.4
Vance, P.H.5
-
16
-
-
0038580048
-
A technical review of column generation in integer programming
-
Wilhelm W.E. A technical review of column generation in integer programming. Optimization and Engineering 2 (2001) 159-200
-
(2001)
Optimization and Engineering
, vol.2
, pp. 159-200
-
-
Wilhelm, W.E.1
-
17
-
-
0038817875
-
Prescribing the content and timing of product upgrade
-
Wilhelm W.E., Damodaran P., and Li J. Prescribing the content and timing of product upgrade. IIE Transactions 35 (2003) 647-663
-
(2003)
IIE Transactions
, vol.35
, pp. 647-663
-
-
Wilhelm, W.E.1
Damodaran, P.2
Li, J.3
-
19
-
-
77957089136
-
Time constrained routing and scheduling
-
Ball M.E., Magnanti T.L., Monma C., and Nemhauser G.L. (Eds), Elsevier, Amsterdam
-
Desrosiers J., Dumas Y., Solomon M.M., and Soumis F. Time constrained routing and scheduling. In: Ball M.E., Magnanti T.L., Monma C., and Nemhauser G.L. (Eds). Handbooks in operations research and management science (1995), Elsevier, Amsterdam
-
(1995)
Handbooks in operations research and management science
-
-
Desrosiers, J.1
Dumas, Y.2
Solomon, M.M.3
Soumis, F.4
-
20
-
-
30344453380
-
Selected topics in column generation
-
Lubbecke M.E., and Desrosiers J. Selected topics in column generation. Operations Research 53 6 (2005) 1007-1023
-
(2005)
Operations Research
, vol.53
, Issue.6
, pp. 1007-1023
-
-
Lubbecke, M.E.1
Desrosiers, J.2
-
21
-
-
68249104256
-
-
CPLEX, Release 9.0, ILOG Institute, Paris, France
-
CPLEX, Release 9.0, ILOG Institute, Paris, France.
-
-
-
|