메뉴 건너뛰기




Volumn 20, Issue 4, 2011, Pages 399-417

Design of a construction management data visualization environment: A top-down approach

Author keywords

Construction management; Construction management data visualization; Construction management data visualization environment; Construction performance monitoring; Construction project data; Design requirements; Schedule quality; Visual construction management analytics

Indexed keywords

CONSTRUCTION MANAGEMENT; CONSTRUCTION MANAGEMENT DATA VISUALIZATION ENVIRONMENT; CONSTRUCTION PERFORMANCE MONITORING; CONSTRUCTION PROJECT DATA; DESIGN REQUIREMENTS; SCHEDULE QUALITY; VISUAL CONSTRUCTION MANAGEMENT ANALYTICS;

EID: 79954620563     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2010.11.010     Document Type: Article
Times cited : (24)

References (46)
  • 1
    • 70349273710 scopus 로고    scopus 로고
    • Visual representation of construction management data
    • A.D. Russell, C. Chiu, and T. Korde Visual representation of construction management data Automation in Construction 18 8 2009 1045 1062
    • (2009) Automation in Construction , vol.18 , Issue.8 , pp. 1045-1062
    • Russell, A.D.1    Chiu, C.2    Korde, T.3
  • 4
    • 0034588515 scopus 로고    scopus 로고
    • Designing and evaluating visualization techniques for construction planning
    • K. Liston, M. Fischer, and J. Kunz Designing and evaluating visualization techniques for construction planning Proc. Eighth International Conference on Computing in Civil and Building Engineering 2000 ASCE CA, USA 1293 1300 (Pubitemid 35213329)
    • (2000) Computing in Civil and Building Engineering , vol.2 , pp. 1293-1300
    • Liston, K.1    Fischer, M.2    Kunz, J.3
  • 10
    • 34250203211 scopus 로고    scopus 로고
    • Level of visualization support for project communication in the Turkish construction industry: A quality function deployment approach
    • DOI 10.1139/L06-147
    • Y. Nielson, and B. Erdogan Level of visualization support for project communication in the Turkish construction industry: a quality function deployment approach Canadian Journal of Civil Engineering 34 1 2007 19 36 (Pubitemid 46901233)
    • (2007) Canadian Journal of Civil Engineering , vol.34 , Issue.1 , pp. 19-36
    • Nielsen, Y.1    Erdogan, B.2
  • 11
    • 0036697280 scopus 로고    scopus 로고
    • On uncertainty, ambiguity, and complexity in project management
    • M.T. Pich, C.H. Loch, and A.D. Meyer On uncertainty, ambiguity, and complexity in project management Management Science 48 8 2002 1008 1023
    • (2002) Management Science , vol.48 , Issue.8 , pp. 1008-1023
    • Pich, M.T.1    Loch, C.H.2    Meyer, A.D.3
  • 14
    • 0032165225 scopus 로고    scopus 로고
    • Generating, evaluating and visualizing construction schedules with CAD tools
    • PII S0926580598000533
    • K. McKinney, and M. Fischer Generating, evaluating and visualizing construction schedules with CAD tools Automation in Construction 7 6 1998 433 447 (Pubitemid 128429311)
    • (1998) Automation in Construction , vol.7 , Issue.6 , pp. 433-447
    • McKinney, K.1    Fischer, M.2
  • 16
    • 2942750055 scopus 로고    scopus 로고
    • Multi-constraint information management and visualisation for collaborative planning and control in construction
    • E. Sriprasert, and N. Dawood Multi-constraint information management and visualisation for collaborative planning and control in construction Information Technology in Construction 8 2003 341 366 (Special (eWork and eBusiness)) (Pubitemid 38800795)
    • (2003) Electronic Journal of Information Technology in Construction , vol.8 , pp. 341-366
    • Sriprasert, E.1    Dawood, N.2
  • 17
    • 0034588272 scopus 로고    scopus 로고
    • Visual representation of project planning & control data
    • A.D. Russell, and A. Udaipurwala Visual representation of project planning and control data Proc. Eighth International Conference on Computing in Civil and Building Engineering 2000 ASCE Stanford, CA, USA 542 549 (Pubitemid 35213231)
    • (2000) Computing in Civil and Building Engineering , vol.1 , pp. 542-549
    • Russell, A.D.1    Udaipurwala, A.2
  • 19
    • 57649149304 scopus 로고    scopus 로고
    • Visualizing high-rise building construction strategies using linear scheduling and 4D CAD
    • A. Russell, S. Staub-French, N. Tran, and W. Wong Visualizing high-rise building construction strategies using linear scheduling and 4D CAD Automation in Construction 18 2 2009 219 236
    • (2009) Automation in Construction , vol.18 , Issue.2 , pp. 219-236
    • Russell, A.1    Staub-French, S.2    Tran, N.3    Wong, W.4
  • 21
    • 52249100156 scopus 로고    scopus 로고
    • Seeing beyond statistics: Visual exploration of productivity on a construction site
    • IEEE Computer Society London, UK
    • K. Vrotsou, A. Ynnerman, and M. Cooper Seeing beyond statistics: visual exploration of productivity on a construction site Proc. 2008 International Conference in Visualization 2008 IEEE Computer Society London, UK 37 42
    • (2008) Proc. 2008 International Conference in Visualization , pp. 37-42
    • Vrotsou, K.1    Ynnerman, A.2    Cooper, M.3
  • 23
    • 69949088544 scopus 로고    scopus 로고
    • Developing effective visual representations to monitor project performance
    • ASCE Seattle, WA, USA
    • N. Lee, and E.M. Rojas Developing effective visual representations to monitor project performance Proc. 2009 Construction Research Congress 2009 ASCE Seattle, WA, USA 826 835
    • (2009) Proc. 2009 Construction Research Congress , pp. 826-835
    • Lee, N.1    Rojas, E.M.2
  • 24
    • 0029772743 scopus 로고    scopus 로고
    • Project management with time, cost, and quality considerations
    • DOI 10.1016/0377-2217(94)00202-9
    • A.J.G. Babu, and N. Suresh Project management with time, cost, and quality considerations European Journal of Operational Research 88 2 1996 320 327 (Pubitemid 126378090)
    • (1996) European Journal of Operational Research , vol.88 , Issue.2 , pp. 320-327
    • Babu, A.J.G.1    Suresh, N.2
  • 27
    • 27644569096 scopus 로고    scopus 로고
    • Predicting the production rates of foundation construction using factor and regression analysis
    • ASCE San Diego, CA, USA
    • W.K. Chong, J.T. O'Connor, J. Chou, and S. Lee Predicting the production rates of foundation construction using factor and regression analysis Proc. Construction Research Congress 2005 ASCE San Diego, CA, USA 56
    • (2005) Proc. Construction Research Congress , pp. 56
    • Chong, W.K.1    O'Connor, J.T.2    Chou, J.3    Lee, S.4
  • 28
    • 33846862012 scopus 로고    scopus 로고
    • An integrated system for change management in construction
    • DOI 10.1016/j.autcon.2006.07.005, PII S0926580506000598
    • I.A. Motawa, C.J. Anumba, S. Lee, and F. Peña-Mora An integrated system for change management in construction Automation in Construction 16 3 2007 368 377 (Pubitemid 46217777)
    • (2007) Automation in Construction , vol.16 , Issue.3 , pp. 368-377
    • Motawa, I.A.1    Anumba, C.J.2    Lee, S.3    Pena-Mora, F.4
  • 31
    • 0036160464 scopus 로고    scopus 로고
    • Data preparation process for construction knowledge generation through knowledge discovery in databases
    • DOI 10.1061/(ASCE)0887-3801(2002)16:1(39)
    • L. Soibelman, and H. Kim Data preparation process for construction knowledge generation through knowledge discovery in databases Journal of Computing in Civil Engineering 16 1 2002 39 48 (Pubitemid 34125182)
    • (2002) Journal of Computing in Civil Engineering , vol.16 , Issue.1 , pp. 39-48
    • Soibelman, L.1    Kim, H.2
  • 32
    • 40849147425 scopus 로고    scopus 로고
    • Reasoning mechanism for construction nonconformance root-cause analysis
    • DOI 10.1061/(ASCE)0733-9364(2008)134:4(280)
    • M.G. Battikha Reasoning mechanism for construction nonconformance root-cause analysis Journal of Construction Engineering and Management 134 4 2008 280 288 (Pubitemid 351399365)
    • (2008) Journal of Construction Engineering and Management , vol.134 , Issue.4 , pp. 280-288
    • Battikha, M.G.1
  • 33
    • 0030270924 scopus 로고    scopus 로고
    • The thinking style of the managers of multiple projects: Implications for problem solving when managing change
    • DOI 10.1016/0263-7863(96)84511-X
    • A.D. Tullett The thinking style of the managers of multiple projects: implications for problem solving when managing change International Journal of Project Management 14 5 1996 281 287 (Pubitemid 126382397)
    • (1996) International Journal of Project Management , vol.14 , Issue.5 , pp. 281-287
    • Tullett, A.D.1
  • 34
    • 0036265294 scopus 로고    scopus 로고
    • Polaris: A system for query, analysis, and visualization of multidimensional relational databases
    • DOI 10.1109/2945.981851
    • C. Stolte, D. Tang, and P. Hanrahan Polaris: a system for query, analysis, and visualization of multidimensional relational databases Transactions on Visualization and Computer Graphics 8 1 2002 52 65 (Pubitemid 34573482)
    • (2002) IEEE Transactions on Visualization and Computer Graphics , vol.8 , Issue.1 , pp. 52-65
    • Stolte, C.1    Tang, D.2    Hanrahan, P.3
  • 38
    • 67649647437 scopus 로고    scopus 로고
    • A brief history of data visualization
    • M. Friendly A brief history of data visualization C. Chen, W. Härdle, Unwin A. Handbook of Data Visualization 2008 Springer 57 78
    • (2008) Handbook of Data Visualization , pp. 57-78
    • Friendly, M.1
  • 40
    • 0028534523 scopus 로고
    • Dynamic queries for visual information seeking
    • B. Shneiderman Dynamic queries for visual information seeking IEEE Software 11 6 1994 70 77
    • (1994) IEEE Software , vol.11 , Issue.6 , pp. 70-77
    • Shneiderman, B.1
  • 43
    • 34948830686 scopus 로고    scopus 로고
    • State of the art: Coordinated & multiple views in exploratory visualization
    • DOI 10.1109/CMV.2007.20, 4269947, Proceedings - Fifth International Conference on Coordinated and Multiple Views in Exploratory Visualization, CMV 2007
    • J.C. Roberts State of the art: coordinated & multiple views in exploratory visualization Proc. CMV '07: Proceedings of the Fifth International Conference on Coordinated and Multiple Views in Exploratory Visualization 2007 IEEE Computer Society Zuric, Switzerland 61 71 (Pubitemid 47515157)
    • (2007) Proceedings - Fifth International Conference on Coordinated and Multiple Views in Exploratory Visualization, CMV 2007 , pp. 61-71
    • Roberts, J.C.1
  • 44
    • 13944278484 scopus 로고    scopus 로고
    • Establish concrete placing rates using quality control records from Hong Kong building construction projects
    • DOI 10.1061/(ASCE)0733-9364(2004)130:2(216)
    • M. Lu, and M. Anson Establish concrete placing rates using quality control records from Hong Kong building construction projects Journal of Construction Engineering and Management 130 2 2004 216 224 (Pubitemid 40265388)
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.2 , pp. 216-224
    • Lu, M.1    Anson, M.2
  • 45
    • 79954625193 scopus 로고    scopus 로고
    • Software FX Inc.
    • Software FX Inc. Chart FX for COM http://www.softwarefx.com/ sfxComProducts/cfxForCOM/ accessed: 2009 August/23
    • Chart FX for COM


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.