-
3
-
-
0041694822
-
-
Department of Surveying and Information Technology Institute, University of Salford
-
Aouad G., Betts M., Brandon P., Brown F., Child T., Cooper G., Ford S., Kirkham J., Oxma R., Sarshar M., Young B. ICON: integration of construction information. 1994;Department of Surveying and Information Technology Institute, University of Salford.
-
(1994)
ICON: Integration of Construction Information
-
-
Aouad, G.1
Betts, M.2
Brandon, P.3
Brown, F.4
Child, T.5
Cooper, G.6
Ford, S.7
Kirkham, J.8
Oxma, R.9
Sarshar, M.10
Young, B.11
-
5
-
-
0037827044
-
OSCONCAD: A model-based CAD system integrated with computer applications
-
Marir F., Aouad G., Child T., Brandon P. OSCONCAD: a model-based CAD system integrated with computer applications. ITCON. 3:1998;25-44.
-
(1998)
ITCON
, vol.3
, pp. 25-44
-
-
Marir, F.1
Aouad, G.2
Child, T.3
Brandon, P.4
-
6
-
-
0030219240
-
Rapid conceptual design evaluation using a virtual product model
-
Clayton M., Kunz J., Fischer M. Rapid conceptual design evaluation using a virtual product model. Engng Appl Artif Intell. 9:(4):1996;439-451.
-
(1996)
Engng Appl Artif Intell
, vol.9
, Issue.4
, pp. 439-451
-
-
Clayton, M.1
Kunz, J.2
Fischer, M.3
-
7
-
-
0004312731
-
Constructibility input to preliminary design of reinforced concrete structures
-
Center for Integrated Facility Engineering, Stanford
-
Fischer M. Constructibility input to preliminary design of reinforced concrete structures. Technical Report #64, Center for Integrated Facility Engineering, Stanford; 1991.
-
(1991)
Technical Report #64
, vol.64
-
-
Fischer, M.1
-
8
-
-
0026835331
-
Knowledge acquisition and development for formwork selection system
-
Hanna A.S., Willenbrock J.H., Sanvido V.E. Knowledge acquisition and development for formwork selection system. J Construct Engng Mgmt, ASCE. 118:(1):1992;179-198.
-
(1992)
J Construct Engng Mgmt, ASCE
, vol.118
, Issue.1
, pp. 179-198
-
-
Hanna, A.S.1
Willenbrock, J.H.2
Sanvido, V.E.3
-
10
-
-
0031634488
-
Representation of construction methods in total project systems
-
Computing in Civil Engineering, ASCE, Boston, MA; October 19-21
-
Froese T, Rankin J. Representation of construction methods in total project systems. Computing in Civil Engineering. Proceedings of the International Computing Congress, ASCE, Boston, MA; October 19-21 1998:383-94.
-
(1998)
Proceedings of the International Computing Congress
, pp. 383-394
-
-
Froese, T.1
Rankin, J.2
-
13
-
-
0027545630
-
Factors influencing formwork productivity
-
Smith G.R., Hanna A.S. Factors influencing formwork productivity. Can J Civil Engng. 20:(1):1993;144-153.
-
(1993)
Can J Civil Engng
, vol.20
, Issue.1
, pp. 144-153
-
-
Smith, G.R.1
Hanna, A.S.2
-
14
-
-
0026382438
-
Factors affecting masonry-labor productivity
-
Sanders S., Thomas R. Factors affecting masonry-labor productivity. J Construct Engng Mgmt. 117:(4):1991;626-644.
-
(1991)
J Construct Engng Mgmt
, vol.117
, Issue.4
, pp. 626-644
-
-
Sanders, S.1
Thomas, R.2
-
15
-
-
0011103997
-
Examples of product model transformations in construction. 8dbmc, Durability of building materials and components. Information technology in construction
-
Vancouver, BC, Canada
-
Akbas R, Fischer M. Examples of product model transformations in construction. 8dbmc, Durability of building materials and components. Information technology in construction. CIB W78 Workshop, Vancouver, BC, Canada; 1999:4:2737-46.
-
(1999)
CIB W78 Workshop
, vol.4
, pp. 2737-2746
-
-
Akbas, R.1
Fischer, M.2
-
17
-
-
84974449619
-
OARPLAN: Generating project plans by reasoning about objects, actions and resources
-
Darwiche A., Levitt R., Hayes-Roth B. OARPLAN: generating project plans by reasoning about objects, actions and resources. AI EDAM. 2:(3):1989;169-181.
-
(1989)
AI EDAM
, vol.2
, Issue.3
, pp. 169-181
-
-
Darwiche, A.1
Levitt, R.2
Hayes-Roth, B.3
-
18
-
-
0028517808
-
MDA planner: Interactive planning tool using product models and construction methods
-
Jagbeck A. MDA planner: interactive planning tool using product models and construction methods. J Comput Civil Engng. 8:(4):1994;536-554.
-
(1994)
J Comput Civil Engng
, vol.8
, Issue.4
, pp. 536-554
-
-
Jagbeck, A.1
-
19
-
-
0030195306
-
Object-oriented model for integrating construction product and process information
-
Stumpf A., Ganeshan R., Chin S., Liu L. Object-oriented model for integrating construction product and process information. J Comput Civil Engng. 10:(3):1996;204-212.
-
(1996)
J Comput Civil Engng
, vol.10
, Issue.3
, pp. 204-212
-
-
Stumpf, A.1
Ganeshan, R.2
Chin, S.3
Liu, L.4
-
21
-
-
0042861949
-
Industrial case study of electronic design, cost, and schedule integration
-
Center for Integrated Facility Engineering, Stanford
-
Staub-French S, Fischer M. Industrial case study of electronic design, cost, and schedule integration. Technical Report #122, Center for Integrated Facility Engineering, Stanford; 2001.
-
(2001)
Technical Report #122
, vol.122
-
-
Staub-French, S.1
Fischer, M.2
-
22
-
-
0345356232
-
A feature ontology to support construction cost estimating
-
Staub-French S, Fischer M, Kunz J, Paulson B, Ishii K. A feature ontology to support construction cost estimating. Accepted for publication in AIEDEAM: Artifical Intelligence for Engineering Design, Analysis and Manufacturing.
-
AIEDEAM: Artifical Intelligence for Engineering Design, Analysis and Manufacturing
-
-
Staub-French, S.1
Fischer, M.2
Kunz, J.3
Paulson, B.4
Ishii, K.5
-
23
-
-
0041359088
-
The Charrette test method
-
Center for Integrated Facility Engineering, Stanford
-
Clayton M, Kunz J, Fischer M. The Charrette test method. Technical Report 120, Center for Integrated Facility Engineering, Stanford; 1998.
-
(1998)
Technical Report
, vol.120
-
-
Clayton, M.1
Kunz, J.2
Fischer, M.3
|