1
-
-
0036540344
-
Measurement of the performance of ready mixed concreting resources as data for system simulation
-
Anson, M., Tang, S. L., and Ying, K. C. (2002). "Measurement of the performance of ready mixed concreting resources as data for system simulation." Constr. Manage. Econom., 20, 237-250.
-
(2002)
Constr. Manage. Econom.
, vol.20
, pp. 237-250
-
-
Anson, M.1
Tang, S.L.2
Ying, K.C.3
-
2
-
-
0028494341
-
Hong Kong performance yardsticks for concrete placing during building construction
-
Anson, M., and Wang, S. Q. (1994). "Hong Kong performance yardsticks for concrete placing during building construction." Trans. Hong Kong Inst. Eng., 1(1), 1-18.
-
(1994)
Trans. Hong Kong Inst. Eng.
, vol.1
, Issue.1
, pp. 1-18
-
-
Anson, M.1
Wang, S.Q.2
-
3
-
-
0031832477
-
Performance of concrete placing in Hong Kong buildings
-
Anson, M., and Wang, S. Q. (1998). "Performance of concrete placing in Hong Kong buildings." J. Constr. Eng. Manage., 124(2), 116-124.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.2
, pp. 116-124
-
-
Anson, M.1
Wang, S.Q.2
-
4
-
-
13944272016
-
Committee C9, "Standard specification for ready-mixed concrete"
-
Vol. 04.02, published annually
-
American Society for Testing and Materials C94 (ASTM). (2000). Committee C9, "Standard specification for ready-mixed concrete." Annual Book of ASTM Standards, Vol. 04.02, published annually.
-
(2000)
Annual Book of ASTM Standards
-
-
-
5
-
-
84948516864
-
A study of the factors affecting construction durations in Hong Kong
-
Chan, D. W., and Kumaraswamy, M. M. (1995). "A study of the factors affecting construction durations in Hong Kong." Constr. Manage. Econom., 13, 319-333.
-
(1995)
Constr. Manage. Econom.
, vol.13
, pp. 319-333
-
-
Chan, D.W.1
Kumaraswamy, M.M.2
-
6
-
-
0004172988
-
-
Wiley, New York
-
Halpin, D., and Woodhead, R. (1998). Construction management, 2nd Ed., Wiley, New York.
-
(1998)
Construction Management, 2nd Ed.
-
-
Halpin, D.1
Woodhead, R.2
-
7
-
-
0345813226
-
Development of an experience database for truck loading operatioins
-
Kannan, G., and Vorster, M. (2000). "Development of an experience database for truck loading operatioins." J. Constr. Eng. Manage., 126(3), 201-209.
-
(2000)
J. Constr. Eng. Manage.
, vol.126
, Issue.3
, pp. 201-209
-
-
Kannan, G.1
Vorster, M.2
-
8
-
-
1542263146
-
-
PhD thesis, University of Alberta, Edmonton, Alta., Canada
-
Lu, M. (2001). "Productivity studies using advanced ANN models," PhD thesis, University of Alberta, Edmonton, Alta., Canada.
-
(2001)
Productivity Studies Using Advanced ANN Models
-
-
Lu, M.1
-
9
-
-
9144263820
-
Enhancing project evaluation and review technique simulation through artificial neural network-based input modeling
-
Lu, M. (2002). "Enhancing project evaluation and review technique simulation through artificial neural network-based input modeling." J. Constr. Eng. Manage., 128(5), 438-445.
-
(2002)
J. Constr. Eng. Manage.
, vol.128
, Issue.5
, pp. 438-445
-
-
Lu, M.1
-
10
-
-
6344237930
-
HKCONSIM: A practical simulation solution to planning concrete plant operations in Hong Kong
-
Lu, M., Anson, M., Tang, S. L., and Ying, K. C. (2003). "HKCONSIM: A practical simulation solution to planning concrete plant operations in Hong Kong." J. Constr. Eng. Manage., 129(5), 547-554.
-
(2003)
J. Constr. Eng. Manage.
, vol.129
, Issue.5
, pp. 547-554
-
-
Lu, M.1
Anson, M.2
Tang, S.L.3
Ying, K.C.4
-
11
-
-
13944253027
-
Chapter 21: Methods and equipment
-
J. A. Dobrowolski, ed., McGraw-Hill, New York
-
Mass, G. R. (1998). "Chapter 21: Methods and equipment." Concrete construction handbook, 4th Ed., J. A. Dobrowolski, ed., McGraw-Hill, New York.
-
(1998)
Concrete Construction Handbook, 4th Ed.
-
-
Mass, G.R.1
-
12
-
-
0004158431
-
-
McGraw-Hill, New York
-
Oglesby, C. H., Parker, H. W., and Howell, G. A. (1989). Productivity improvement in construction, McGraw-Hill, New York.
-
(1989)
Productivity Improvement in Construction
-
-
Oglesby, C.H.1
Parker, H.W.2
Howell, G.A.3
-
13
-
-
0004176045
-
-
McGraw-Hill, New York
-
Peurifoy, R. L., and Schexnayder, C. J. (2002). Construction planning, equipment, and methods, 6th Ed., McGraw-Hill, New York.
-
(2002)
Construction Planning, Equipment, and Methods, 6th Ed.
-
-
Peurifoy, R.L.1
Schexnayder, C.J.2
-
14
-
-
0001362287
-
Neural network model for estimating construction productivity
-
Portas, J., and AbouRizk, S. (1997). "Neural network model for estimating construction productivity." J. Constr. Eng. Manage., 123(4), 399-410.
-
(1997)
J. Constr. Eng. Manage.
, vol.123
, Issue.4
, pp. 399-410
-
-
Portas, J.1
Abourizk, S.2
|